Excavation Lesson 3 M. S. Martin Sept 2009. De - Watering The removal of ground water and / or accumulated rainwater from within excavations or earthworks.

Slides:



Advertisements
Similar presentations
CONSTRUCTION DRILLING INC.
Advertisements

BOX PUSHING TECHNOLOGY
Flat Roofs & Introduction to Gable Roofs
Excavation, week 2 M. S. Martin Sept Classification of Soils This and next four slides from Build Right - toolbox Site classification Soils are.
Chp12- Footings.
Ground-Supported Slabs • Exterior Flatwork
E STIMATION 1 Excavation 2 lesson 5. E XCAVATION 2 Recap from excavation 1 Looking at site plans Desk top study Site Visit Unit pricing of excavation.
Tunnelling Methods.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Measuring Sitework, Excavation, and Piling
1 Risk Management Services State of Georgia Risk Management Services Trenching Safety Training Department of Administrative Services Loss Control Services.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
OSHA Office of Training and Education1 Excavations – Subpart P.
Trenching and Excavating Safety. Asphyxiation Each time a breath is exhaled the weight of the load restricts inhalation of the next breath. Slow suffocation.
Foundations and basements
Risk Management Department
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
Ms. Gripshover Landscaping Unit 18 INSTALLING PATIOS, WALKS, AND DECKS.
Foundation Systems.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Safety : Excavations l Introduction to Industrial Technology l Spring 2014 l Mr. Shubert 1.
Basic Civil Engineering-Foundation
Floor Systems and Foundation Support
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
ASSALAMUALAIKUM & GOOD MORNING
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
Foundation Engineering CE 483
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
Chapter 2b Foundations Shallow & Deep Foundations.
N. PRESTON, M. MARTIN CERT IV ESTIMATING 2012 Part Lesson 4 – Slab on Ground IDENTIFY AND PRODUCE ESTIMATED COSTS FOR PROJECTS.
EXCAVATION. Excavation 1Excavation activity involves use of manual and mechanical means and interaction of both. Hence, safety aspect to plan involvement.
Wes Marshall, P.E. University of Connecticut March 2007
Topic B2 Sub-structure groundworks
Pavement Analysis and Design
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Specification & Quantities Estimating Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Site Work.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
Joints for Diaphragm Walls
OSHA Office of Training and Education
Excavation & Trench Safety
BUILDING CONSTRUCTION
COFFERDAMS.
Learning Outcome Lesson Objective
Understand foundation design and construction
FOUNDATIONS.
Pitched Roof By PATEL ANKITKUMAR H.
Excavation & Trenching Awareness Plus
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
EXERCISE: A 0.04ha pond has to be built in clayey soil with dikes 1.50m high and 1m wide at the top. If SD = 1.5: 1 and SW = 2:1. Calculate the base width.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Substructure Groundworks - Hazards
EXAMPLE A 400 m2 (40 x 10 m) area is to be excavated, 1 m deep, with side slopes 2:1. As the width (10 m) is less than 30 times the depth (30 x 1 m), the.
EXCAVATION, LATERAL RESTRAINMENT FOR IT AND DEWATERING
Site Grading Site Grading Civil Engineering and Architecture
Topic B.2: Sub-structure groundworks
Site Grading of Terrace
B.V.Patel Institute of Technology-Diploma studies
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Pier Foundations Piers Suspended floor Ground beam Next slide.
Concrete A structural material made by combining cement, sand, aggregate, and water.
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
STANDING WATER FOOTBRIDGE
BUILDING CONSTRUCTION Foundation
Presentation transcript:

Excavation Lesson 3 M. S. Martin Sept 2009

De - Watering The removal of ground water and / or accumulated rainwater from within excavations or earthworks by means of mechanical pumps. Usually to enable continuation of work.

Typical Footings

Shoring

Shoring or Trench Support Manually or mechanically excavated trenches over 1.5m in depth require some form of support for the sides, to prevent possible collapse, while working in the trench. This is typically done by benching battering or ‘shoring’. Open or closed support systems are available in timber, steel or combinations of both.

Shoring – Add definition to P. 31 Trench support to sides of excavations to prevent possible collapse, typically trenches over 1.5m deep, must be benched, battered or ‘shored’.

Timber Shoring Bracket head of screw jack Waler Waling hook Plate head Poling boards Wedges Waling Cleat Strut Bevelled ends OPEN TIMBERING OPEN METAL SHEETING

Timber Shoring

Report if you see any of the following Next two slides from J. Bridges (SWSI) slides on shoring & trenching

Warning Signs If you notice any of the following situations, take remedial action and/or notify your supervisor immediately. Subsidence alongside trench Water entering trench

Warning Signs - Cont’d Earth Fretting from sides Tension Cracks Deflection in Shoring Excessive creaking in shoring

Surface & Sub-Surface Drainage: P. 20 It is a mandatory Local Council requirement to prevent surface eroded surface materials ending up in the street gutters and storm water pits/drains These fences may be constructed of –Polypropylene (shade cloth) –Straw bales –Geotech fabrics, etc. Geotextile filter fabric 3000 max. Drainage area 0.6ha. max Slope gradient 1:2 max. Slope length 60m max. DISTURBED AREA UN-DISTURBED AREA Posts driven 0.6 into ground SEDIMENT FENCE 600mm 200mm

Types of Drainage Surface Drains Dish Drains Rubble Drains Sub-surface drains

Cut & Fill Sites – P. 21 these types of sites need to have sufficient consideration to ensure adequate site drainage, and will typically use all of the drainage types mentioned above.

Slabs Types: –Slab on ground, basic garage, paths –Raft Slab –Waffle slab –Stiffened Raft –Any others ?

Stiffened Raft

Waffle Slab

Slab Calc’s

Volume Slab Break the slab into two areas, i.e. the slab and the thickened splayed edge beam. Firstly, calculate the volume of the slab; L x W x T =7.5x3.8x0.1 =2.850m³

Volume Beam The simplest way of calculating the beam is to calculate the average area of the beam section and multiply it by the centre line length of the beam L x W x = 0.035m² Now calculate the centre line length of the beam

Beam Length Now multiply the average beam area by the average length to calculate the volume of the beam; Area x Length 0.035x m³

Totals To calculate the total volume of concrete in the slab and the beam, add the two separate volumes together; Volume of slab + Volume of beam = 3.592m³ ORDER - 3.6m³ of concrete