EuCARD HE-LHC’10 AccNet mini-workshop on a „High Energy LHC“ 14-16 October 2010, Villa Bighi, MALTA Considerations about the injectors of the HE-LHC R.

Slides:



Advertisements
Similar presentations
Summary of Projects Kai Hock. LHC Upgrade About the project LHC is a 27 km circular accelerator in CERN that produces 7 TeV protons. The project is to.
Advertisements

RFQ development for high power beams
LHC Machine Protection
Possible Injection Scheme in the (80 km) TOE: Tunnel Of Everything Lucio Rossi, Attilio Milanese and Davide Tommasini CERN Work of H. Piekarz (FNAL) widely.
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
E-Cloud Effects in the Proposed CERN PS2 Synchrotron M. Venturini, M. Furman, and J-L Vay (LBNL) ECLOUD10 Workshshop, Oct Cornell University Work.
1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University,
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
F Project X Overview Dave McGinnis October 12, 2007.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
Conveners: Eric Prebys; Luca Bottura (s. secr.) October 16, 2010.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
COMPASS Meeting 2/07/2004 R. Garoby1 RECOMMENDATIONS OF THE HIP WORKING GROUP* *
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
LARP Collaboration Meeting, April 19, 2007Super-Ferric Fast Cycling SPS – Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac - Motivation.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
F. Willeke, Snowmass Luminosity Limitations of e-p Colliders Extrapolation from HERA Experience Examples for IR Layout LINAC-Ring Limitations HERA.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
H. Haseroth Friday, August 31, 2001 MUG Meeting 1 Overview of the CERN Neutrino Factory Machine Studies H. Haseroth for the Neutrino Factory Working Group.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
HHH From Pipetron to LER: history of a brilliant idea and goal of this workshop Lucio Rossi CERN CARE-HHH workshop on LER CERN -11 October 2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Tentative conclusions. Beam parameters new parameter sets with acceptable electron cloud & pile-up events 25 ns spacing ultimate beam with low  * - may.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
Turnaround time in modern hadron colliders & store-length optimization
contribution to the round table discussion
Alternative/complementary Possibilities
Plans for ions in the injector complex D
Optimization of Triplet Field Quality in Collision
Acknowledgments: LIU-PT members and deputies, H. Bartosik
COOLING & VENTILATION INFRASTRUCTURE
Superbeams with SPL at CERN
HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland
Progress towards Pulsed Multi-MW CERN Proton Drivers
LHC (SSC) Byung Yunn CASA.
Electron Rings Eduard Pozdeyev.
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
NLC 2001 Beam Delivery Layout
The SPL-based Proton Driver at CERN
Another Immortal Fill….
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

EuCARD HE-LHC’10 AccNet mini-workshop on a „High Energy LHC“ October 2010, Villa Bighi, MALTA Considerations about the injectors of the HE-LHC R. Garoby 15 October, 2010

R. G October, 2010 OUTLINE 1.Introduction 2.HE-LHC requirements 3.Possible solutions for the injectors 4.Summary

R. G October, Introduction

R. G October, 2010 Past... The injectors of LHC have already been the subject of investigation during past workshops, in view, at medium term, of the LHC luminosity upgrade and at long term, of a higher energy LHC: – LUMI06 [ ] – LER06 [ ] Outcome had materialized in the LP-SPL / PS2 / SPS proposal, as described in the LUMI08 workshop [ ] However, as a result of the Chamonix2010 workshop [ ], the needs of the luminosity upgrade have been reduced and the decision taken to upgrade the existing injectors, instead of building new ones.

R. G October, 2010 Present Matching the needs of the „High Luminosity LHC“ (HL-LHC) is the objective of the „LHC Injectors Upgrade“ (LIU) project [time period: ~2017 – 2030], The „High Energy LHC“ (HE-LHC) sets different requirements on the injectors, and with a different time-scale [time period: ~2030 – 2050], Past workshops (especially LER06 and LUMI06) are highly valuable sources of information.

R. G October, HE-LHC requirements

R. G October, 2010 Beam specifications Nominal LHC HL-LHCHE-LHC Beam energy [GeV]450 > 1000 Distance between bunches [ns]2525 (resp. 50)50 Bunch population* [10 11 p/b]1.2~1.8 (resp. 3.6)~1.4 Transverse normalized emittance [  m] 3.75 2 (H) 1.84 (V) 2.59 (H & V) Longitudinal emittance [eVs]11? (<4) Derived from CERN-ATS [„First thoughts on a higher energy LHC“] * At LHC entrance, assuming 5% loss wrt to start of physics data taking at high energy My guess... Specific to HE-LHC Comment: HE-LHC requirements are unlikely to be as well-defined as stated above...

R. G October, Possible solutions for the injectors

R. G October, 2010 Highest energy injector Only requirement outside the capability of the existing injectors: need for > 1 TeV. Two options: 1.In the SPS tunnel  New SPS (HE-SPS) with fast cycling sc dipoles  Replacement of equipment in TI2 and TI8 transfer lines (sc magnets) 2.In the LHC tunnel  No change to SPS and transfer lines  Additional double aperture 27 km ring compatible with detectors  Bypasses  Passage through detectors‘ centres using fast deflecting magnets H. Piekarz P. Spiller P. Fabbricatore H. Piekarz K.H. Mess

R. G October, 2010 Open technical issues for the highest energy injector HE-SPS in the SPS tunnel Possibility to re-use existing magnets in accelerator and/or Xfer lines? Injection energy in HE-SPS? Space for hosting the injector in the SPS tunnel? Magnet technology (if new magnets)? LER in LHC tunnel Space for hosting HE-LHC and LER in the LHC tunnel? Magnet technology? Solution for the IPs? Machine protection (Safe beam, beam dumps)? HERA? TEVATRON? Pipetron? Refurbishment of LHC magnets? Bypass ? Through IP? Superferric?

R. G October, 2010 As of today, the existing injectors meet the basic needs of HE-LHC. But... How far can their lifetime be extended (e.g.: PS will be 70 years old in 2029)?  It is perfectly reasonable to plan for modern & optimized new low energy injectors for the HE-LHC which will operate until ~2045. Since the injector complex will „live“ much longer than the HE-LHC, it should have the potential to serve more purposes, either in parallel with HE-LHC, or afterwards (possibly with upgrades).  Need to know about long term users‘ needs  Interest of building these new machines already during the lifetime of the LHC:  to get benefits for the LHC  to spread the construction effort of the HE-LHC over more years  to serve earlier other users and avoid a gap in data collection. Lower energy accelerators (1/2)

R. G October, 2010 (My) guess of the optimum set of low energy accelerators to: -Optimize the complex (reasonable energy range in the different accelerators, minimum number of beam transfers, „safe“ technological choices) -Have the potential to adapt to the requirements of a High Luminosity upgrade of the HE-LHC -Serve the needs of the most demanding users known today (neutrino facility) simultaneously with HL-LHC and HE-LHC  Energy rangeMachineOther application 100 GeV – 1.2 TeVHE-SPSRIB acceleration? ~ GeVHE-PSRIB acceleration ? Up to ~8 GeVSC linac (+ 2 fixed energy rings)  production for factory Lower energy accelerators (2/2) Bmax~5 T Bdotmax~2T/s Bmax~4 T Bdotmax~3T/s

R. G October, Beam dynamics / performance – Beam characteristics – Filling time/turn-around time – Performance margin 2.Risks -During construction (cost & performance) -During operation (MTTF & MTTR, personnel and environment) 3.Operational impact -During construction (compatibility with continuing physics) -During operation (flexibility/capability to adapt to changing needs, capability to simultaneously satisfy other users, exotic test beams...) 4.Cost (material and personnel) -During construction -During operation Evaluation criteria

R. G October, Final words

R. G October, 2010 Closing remarks A new >1 TeV synchrotron is necessary for the HE-LHC. For the lower energy accelerators, need to analyse (quantify) the advantages/drawbacks of keeping existing accelerators with respect to replacing them by a new optimized injector complex [level of acceptable risk of failure, manpower and material cost of maintenance/consolidation, reduction of environmental impact (electricity and water consumption)...]. It would make sense to take into account additional needs. Which ones (High Luminosity HE-LHC, HE-LHeC, neutrino facility...)? When? Interest of making the new injectors available during the lifetime of HL-LHC.

R. G October, 2010