The Accelerated Learning Program The Community College of Baltimore County.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
/ /17 32/ / /
AP STUDY SESSION 2.
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
& dding ubtracting ractions.
Copyright © 2013 Elsevier Inc. All rights reserved.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
Why we developed ALP what ALP is results costs future plans ALP The Accelerated Learning Project Outline of Todays Presentation AL P the accelerated learning.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 1  1 =.
Summative Math Test Algebra (28%) Geometry (29%)
The 5S numbers game..
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
© 2010 Concept Systems, Inc.1 Concept Mapping Methodology: An Example.
PP Test Review Sections 6-1 to 6-6
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Faster IS Better: Accelerating to Success Kay Teague And Michael Warren.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Select a time to count down from the clock above
Co-Requisite Models for Developmental Education Peter Adams
An Overview of the Accelerated Learning Program (ALP) Peter Adams Susan Gabriel The Community College of Baltimore County.
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
Patient Survey Results 2013 Nicki Mott. Patient Survey 2013 Patient Survey conducted by IPOS Mori by posting questionnaires to random patients in the.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
ALP The Accelerated Learning Project 100% 75% 50% 25% 0% Success rates for students who took ENG052 in How Successful is Developmental Writing 100%
Presented to: By: Date: Federal Aviation Administration FAA Safety Team FAASafety.gov AMT Awards Program Sun ‘n Fun Bryan Neville, FAASTeam April 21, 2009.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
The Accelerated Learning Program The Community College of Baltimore County.
The Accelerated Learning Program The Community College of Baltimore County.
Financial problems changes at work legal problems car trouble abusive situation at home medical problems eviction problems with children laid off life.
The Accelerated Learning Program The Community College of Baltimore County.
The Accelerated Learning Program
The Accelerated Learning Program
The Accelerated Learning Program
Presentation transcript:

The Accelerated Learning Program The Community College of Baltimore County

Agenda for the Day ALP The Accelerated Learning Program What is the problem? What is ALP? What results has ALP produced? What about the cost? What obstacles might arise?

100% 75% 50% 25% 0% Success rates for students who took ENGL 052 in N = 863 How We First Measured Success in Our Developmental Courses 100% 75% 50% 25% 0% S in ENGL % U or W ENGL % Success rates for students who passed ENGL 052 in and then took ENGL 101 by sp 92 ABC in ENGL % DFW in ENGL % ALP The Accelerated Learning Program

took / % Students who took ENG 052 for the first time in 1988/1989 took % took no more writing courses % S in % never passed % A, B, or C in % D, F, or W in % ALP The Accelerated Learning Program

ALP Why Do Students Drop Out?

can’t write a thesis no concrete examples sentence fragments confusing words subject-verb agreement mla format when we asked students...They told us “none of the above”

eviction car trouble changes at work financial problems abusive situation at home medical problems problems with children laid off legal problems life issues student becomes discouraged student becomes depressed student feels isolated student loses confidence stress becomes too great student fears she isn’t “college material” affective issues

life issues affective issues non- cognitive issues

100% The Pipeline Effect ALP The Accelerated Learning Program 70% pass 70% take 70% pass 70% take 70% pass = 8% three levels down one level down two levels down 70% take gate- way course 70% pass

100% The Pipeline Effect ALP The Accelerated Learning Program 100% pass 70% take 70% pass 70% take 70% pass = 12% three levels down one level down two levels down 70% take gate- way course 70% pass

100% The Pipeline Effect ALP The Accelerated Learning Program 80% pass 80% take 80% pass 80% take 80% pass = 21% three levels down one level down two levels down 80% take gate- way course 80% pass

100% The Pipeline Effect ALP The Accelerated Learning Program 90% pass 90% take 90% pass 90% take 90% pass = 48% three levels down one level down two levels down 90% take gate- way course 90% pass

Agenda for the Day ALP The Accelerated Learning Program What Is the problem? What is ALP? What results has ALP produced? What about costs? What obstacles might arise?

accelerating dev ed supplementing dev ed contextualizing dev ed reducing need for dev ed K-20 allignment dual enrollment early assesment and intervention summer bridge learning communities I-BEST student success courses supplemental instruction tutoring modularization compressed courses aligning dev ed with credit courses co-requisite courses Approaches to Redesign

A CCBC Students average age 29 female/male58/42% students of color50% full/part-time34/66 % Community College Baltimore County credit students 33,817 ALP The Accelerated Learning Program

5 0% Placement into Dev ED 7 5% 2 5% 10 0% 81 % Englishall studentsmathreading 77 % 65 % 58 %

RDG 051 RDG 052 MATH 081 MATH 082 MATH 083 ENGL 051 ENGL 052 ENGL 101 ENGL 102 CCBC’s Developmental Education Courses:

ENG 101ENG 052 ALP ALP The Accelerated Learning Program encourages cohort effect changes attitude toward developmental course allows individual attention allows time for non-cog issues allows coordination of the two courses reduces stigma improves attachment provides stronger role models

How does an ALP developmental class differ from a traditional one? Goal of an ALP developmental course: ALP The Accelerated Learning Program. for students to pass the developmental course and be ready for first-year composition. for students to pass first-year composition course. Goal of a traditional developmental course:

Conducting class as a writing workshop, an extension/supplement to the 101 class Answering questions left over from the 101 class Providing opportunities for more writing practice, short papers to reinforce concepts from the 101 class or prepare for upcoming assignments in the 101 class Discussing/brainstorming ideas for the next essay in 101 Reviewing drafts of essays the students are working on for 101 Working on reducing the frequency and severity of error in the students’ writing Addressing non-cognitive issues (life issues, affective issues) What do we do in the ALP 052 class? The goal for ALP 052 instructors: Maximize the ALP students’ probability of success in the ENGL 101 class. Strategies include: ALP The Accelerated Learning Program

What Is the problem? What is ALP? What results has ALP produced? What about costs? What obstacles might arise? Agenda for the Day ALP The Accelerated Learning Program

passed ENG % did not pass ENG % took ENG 052 Fa07-Fa % took ENG % took no more writing courses % passed ENG % didn’t pass ENG % took ENG 052 Fa07-Fa % took ENG % took no more writing courses 0 0% traditional developmental students: fall 2007 – fall 2010 ALP students: fall 2007 – fall 2010 data from Cho, Kopko, & Jenkins, 2012 (CCRC)

passed ENG % did not pass ENG % took ENG 052 Fa07-Fa % took ENG % took no more writing courses % traditional developmental students: fall 2007 – fall 2010 passed ENG % didn’t pass ENG % took ENG 052 Fa07-Fa % took ENG % took no more writing courses 0 0% ALP students: fall 2007 – fall 2010 passed ENG % didn’t pass ENG % passed ENG % didn’t pass ENG % data from Cho, Kopko, & Jenkins, 2012 (CCRC)

passed ENG % haven’t passed ENG % passed ENG % F, I, or W in ENG % took ENG % haven’t taken ENG % took ENG % haven’t taken ENG % passed ENG % did not pass ENG % took ENG 052 Fa07-Fa % took ENG % took no more writing courses % passed ENG % didn’t pass ENG % took ENG 052 Fa07-Fa % took ENG % took no more writing courses 0 0% passed ENG % didn’t pass ENG % passed ENG % didn’t pass ENG % traditional developmental students: fall 2007 – fall 2010 ALP students: fall 2007 – fall 2010 data from Cho, Kopko, & Jenkins, 2012 (CCRC)

2 0% Credits Earned in 1 Year (Fall 2011 Cohort) 30 % 10% 40 % traditional dev writing N = % none ALP N = % % 18 % 6%6% 2.9 % 30 % 20 % 14%14% 14%14% 8.4 %

Completion Rates (As of January 2013) 20 % 10 % 15% traditional dev writing fall 2007 ALP fall 2008 fall % 5%5% 14 % 3%3% 26 % 5% 7%7% 9%9% 9%9%

Developmental Writing 65% CCBC’s Developmental Writing Courses: Credit English 35% ENG051 13% ENG052 87%

Developmental Writing 65% CCBC’s Developmental Writing Courses: Credit English 35% ENG051 13% ALP 87%

69 % 5 0% Pass Rates in 101 by Accuplacer Score 7 5% 2 5% 10 0% traditional dev writing 23 % 31 % ALP 46% 54% 77 % Accuplacer Scores: 25 % 44% 70-79

students 20 sections 640 students 80 sections students 40 sections 80 students students 160 sections

Agenda for the Day ALP The Accelerated Learning Program What is the problem? What is ALP? What results has ALP produced? What about the cost? What obstacles might arise?

1000 students Costs Under Traditional Model

20 students per section Costs Under Traditional Model

50 sections of Dev Eng X 3 faculty credit hours/section = 150 faculty credit hours Costs Under Traditional Model ALP The Accelerated Learning Program

54% of traditional developmental students take students ÷ 20 students/section = 27 sections.54 X 1000 = 540 students 27 sections X 3 faculty credit hours/section = 81 faculty credit hours Costs Under Traditional Model ALP The Accelerated Learning Program

total for developmental course = total for 101= 81 faculty credit hours 150 faculty credit hours total =231 faculty credit hours Costs Under Traditional Model ALP The Accelerated Learning Program

1000 students Costs Under ALP

10 students per section Costs Under ALP

100 sections of ALP Dev Eng X 3 faculty credit hours/section = 300 faculty credit hours Costs Under ALP ALP The Accelerated Learning Program

100% of ALP developmental students take ENG students ÷ 20 students/section = 50 sections 1.00 X 1000 = 1000 students 50 sections X 3 faculty credit hours/section = 150 faculty credit hours Costs Under ALP ALP The Accelerated Learning Program

Comparison of Costs for 500 Students TraditionalALP DEV: 50 sect X 3 cr/sect = 150 fch 101: 18.5 sect X 3 cr/sect = 81 fch TOTAL: 231 fch DEV: 100 sect X 3 cr/sect = 300 fch 101: 50 sect X 3 cr/sect = 150 fch TOTAL: 450 fch ALP The Accelerated Learning Program

traditional factory widgets per year cost per widget cost/year to operate $231,000 $450,000 33,000 74,000 $7.00 $6.08 ALP factory An Analogy ALP The Accelerated Learning Program

traditional factory 231 fch 450 fch students per yearcost per studentcost per year students per year cost per studentcost per year 330 (33%) of 1000 students pass FYC 740 (74%) of 1000 students pass FYC.700 fch per passing student.608 fch per passing student ALP factory An Analogy ALP The Accelerated Learning Program

traditional factory 231 fch 450 fch students per yearcost per studentcost per year students per semester cost per studentcost per year 330 (33%) of 1000 students pass FYC 740 (74%) of 1000 students pass FYC.700 fch per passing student.608 fch per passing student ALP factory An Analogy ALP The Accelerated Learning Program

Summing It All Up doubles the success rate, cuts the attrition rate in half, does it in half the time, at slightly less cost per successful student. Compared to traditional developmental writing approaches, ALP ALP The Accelerated Learning Program

What is the problem? What is ALP? What results has ALP produced? What about the cost? What obstacles might arise? Agenda for the Day ALP The Accelerated Learning Program

Faculty resistance don’t believe there is a problem don’t believe students can handle comp resistance to addressing non-cogs data pilot Possible Obstacles ALP The Accelerated Learning Program

Attracting students Advisors Logistics classrooms registering the right students exit criteria faculty development Possible Obstacles ALP The Accelerated Learning Program Faculty resistance

The Accelerated Learning Program The Community College of Baltimore County