Abdulghafoor M. Abduljabbar

Slides:



Advertisements
Similar presentations
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Advertisements

Emissions Inventory: India & China Assessments P.R. Shukla.
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Presented by The Coal Rush Revisited: R. W. Beck, Inc. IPED COAL POWER CONFERENCE January 18-19, 2007 St. Petersburg, FL Nicholas P. Guarriello An Economic.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
1 Beth McKillop, The British Library Library contacts with Korea.
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
Energy policy and its implementation in Estonia Renewable energy Madis Laaniste, Energy Department.
Addition Facts
1 Copyright Copyright 2012.
Exam 2 Practice Problems
AMERICAN EXPERTISE AND TECHNOLOGY IN WASTEWATER AND WATER SECTOR WASTEWATER AND WATER INVESTMENTS IN TULCEA COUNTY, ROMANIA.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Break Time Remaining 10:00.
October 22, 2010; Tallinn, Estonia Cosimo Garofalo III ESTONIAN NUCLEAR POWER CONFERENCE.
Legal Framework for Bioenergy in Germany Sebastian Kilburg THE FUTURE OF BIOFUELS IN LITHUANIA: ISSUES AND OPPORTUNITIES Vilnius, November 8 th 2007.
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
1 Oil shale – viewed in the light of the Estonian experience.
Aston University Bioenergy Research Group (BERG) Dr Daniel J
PRODUCTIVITY MANAGEMENT IN ASELSAN Tuncay İBİŞ ASELSAN A.Ş. Energy Manager Facilities and Support Services Director.
2 NON-CATALYTIC PLASMA-ARC REFORMING OF NATURAL GAS WITH CARBON DIOXIDE Author:Mr. GW BASSON Co-author:Professor PWE BLOM Post Graduate School for Nuclear.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
15. Oktober Oktober Oktober 2012.
We are learning how to read the 24 hour clock
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
The Future of Higher Education in Further Education Colleges Swindon 17 May 2007.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
Murray River Project Update Coal Forum October 2013.
Asphalt The Bottom of the Barrel Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman, P.E. SemMaterials.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Addition 1’s to 20.
Equal or Not. Equal or Not
Slippery Slope
: 3 00.
5 minutes.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Title Name institution. April, 9-11th, 2015FORIL XI
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
Vorstand FB Tarif industriAll-Europe, Basic Metals Committee, Luxembourg, Collective Agreements of the European Steel Industry.
1 Unit 1 Kinematics Chapter 1 Day
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
T-Talk. Javascript. Module Pattern. Namics. Thomas Junghans. Frontend Engineer. 12 h August 2009.
WORKING DRAFT Last Modified 8/13/2010 4:05:09 PM Central Europe Standard Time Printed :22:48 Central Europe Standard Time Viktorija Sankauskaitė.
WE ARE PLEASED TO UPDATE YET ANOTHER REMARKABLE NEWS ABOUT OUR RECENT PAST PROJECT WHICH‘S ONE OF AMONG BEST AND MEMORABLE PROJECT WE HANDLED IN THE MONTH.
The Refining Industry in Iraq
REFINING There are (3) major Refineries in Iraq:
A Quick Lesson On Crude Oil
NEW NASSIRIYA REFINERY PROJECT
The Petroleum Oil and Gas Corporation of South Africa (SOC) Ltd Reg. No. 1970/008130/07 1 PetroSA Overview * Following the merger of Soekor E & P and Mossgas.
KHERSON OIL REFINING PLANT Reconstruction. Modernization. Development. KORP.
IRAQ’s OIL POLICY (2008 – 2017) Presented by: ENG. AHMED ALSHAMMA Deputy Oil Minister IRAQ.
VISHWAKARMA GOVT. ENGG. COLLEGE TOPIC : DISTILLATION OF PETROLEUM SUPERVISED BY : K.K.GURJAR.
1 CHIYODA July Potentials in Iraq -. 2 Copyright © 2012 Chiyoda Corporation. All Rights Reserved. Corporate Vision : Energy & Environment in Harmony.
Presentation transcript:

Abdulghafoor M. Abduljabbar Iraq Refinery2012 International Conference and Exhibition on Refinery Industries in Iraq April 17th-18th, 2012 presented by Abdulghafoor M. Abduljabbar North Refineries Company’s Director General Iraqi Ministry of Oil 4/8/2017

Actual situation of North Refineries Company(NRC) and our plan to meet world class refining standards 4/8/2017

Contents Introduction. North Refineries Company’s Process Units and Licensors. North Refineries Company’s Organization Structure. North Refineries Company’s new projects. Future major refineries in Iraq. Our aims. 4/8/2017

North Refineries Company (NRC) North Refineries Company was established in 1982 and it is the largest refining company among the Iraqi Ministry of Oil companies with design capacity of 402000 BPSD. NRC employed over 8,873 employees. The company produces over 35 different type of product such as unleaded premium gasoline, illuminating kerosene, ATK, diesel, lube oil product, spindle oil, transformer oil, Asphalt, sulfur, LPG, RT … etc. 4/8/2017

North Refineries Company consist of the following refineries and facilities; 1- 310,000 BPSD Baiji Refining Capacity. A- Salahuddin (1) Refinery with 70000 BPSD Refining Capacity. B-North Refinery with 150000 BPSD Refining Capacity With 20000 BPSD small Two Units. C- Salahuddin (2) Refinery with 70000 BPSD Refining Capacity. 2- New Isomerization Unit / 20,000 BPSD, in operation since July, 2011. 3- Lube Plant (two trains): 125000 Ton of different lube stocks per train. 4- Packaging and Loading Arms facilities. 4/8/2017

5. Exterior Refineries: A 5. Exterior Refineries: A. Kirkuk Refinery with 30,000 BPSD Refining Capacity. B. Siynia Refinery with 30,000 BPSD Refining Capacity. Two units in operation and one unit under construction. C. Kisik Refinery with 20,000 BPSD Refining Capacity. One unit in operation and second under construction. D. Qaiyarah Refinery with 34,000 BPSD Refining Capacity. Needs to extend Crude Pipe line from the Strategic Line about 60 Km. E. Hadithah Refinery with 16,000 BPSD Refining Capacity. F. Aljazirah Refinery with 20,000 BPSD P28 Refining Capacity. Planned to be re-engineering and reinstalling inside NRC. 6. Future Projects: i. New Kirkuk Refinery with capacity of 150,000 BPSD. ii. New FCC unit with capacity of 55,000 BPSD. 4/8/2017

1- Salahuddin Refinery 1 Process Units and Summery No. Unit Name Design Capacity Licensor 01 Atmospheric Distillation 70,000 BPSD SNAM 02 Light Distillate HDS 29,000 BPSD 03 Light Gas Oil 12,000 BPSD 04 Reformer 8,000 BPSD 05 LPG 540 Ton/Day 06 Sulpher 51 Ton/Day 1982 was the year of operation. EPC has been done by Technoexport. The refinery operate 90% of its design capacity. 2000 M3/Day of black oil is being injected back to the crude oil. Because of the long operation life, sanctions, and wars most of the units need rehabilitation. 4/8/2017

2- North Refinery Process Units Unit No. Abbrev. Service Design Capacity Licensor 01 ADU Atmospheric Distillation 150,000 BPSD SNAM 02 VFU Vacuum Flashing 65,000 BPSD 03 NHT Naphtha Hydrotreating 41,000 BPSD UOP 04 KHT Kerosene Hydrotreating 28,000 BPSD 05 GHT L.G.O. Hydrotreating 31,000 BPSD 06 CRU Catalytic Reforming 22,000 BPSD 07 VHC Vacuum Gas Oil Hydrocracking 38,000 BPSD 08 HPU Hydrogen Production 71,860 Nm3/h KTI 09 GSU Gas Sweetening 32,600 Nm3/h 10 LPGR LPG Recovery 650 Ton/Day 11 SRU Sulfur Recovery 281 Ton/Day 12 SWS Sour Water Stripping 114 M3/h 14 CCR Reformer Catalyst Regeneration 454 Kg/h 56 LPGD LPG Dehydration C 3 2.9 Ton/h C 4 26.4 Ton/h CCEC 4/8/2017

North Refinery Summery; 1983 was the year of operation. EPC has been done by CHIYODA. The refinery operate 85% of its design capacity. 25,000 M3/Month of Naphtha is being injected back with the crude oil. Because of the long operation life, sanctions, vandalism, and wars most of the units need rehabilitation. 4/8/2017

3- Salahuddin Refinery 2 Process Units and Summery No. Unit Name Design Capacity Licensor 01 Atmospheric Distillation 70,000 BPSD SNAM 02 Light Distillate HDS 29,000 BPSD 03 Light Gas Oil 12,000 BPSD 04 Reformer 16,500 BPSD 05 Isomerization 20,000 BPSD 1984 was the year of operation. EPC has been done by Technoexport and TPL. The refinery operate 85% of its design capacity. 2000 M3/Day of black oil is being injected back to the crude oil. Because of the long operation life, sanctions, and wars most of the units need rehabilitation. 4/8/2017

4- Exterior Refineries Process Units and Summery No. Refinery Unit Name Design Capacity Licensor 01 Kirkuk 1973 Year of Operation Atmospheric Distillation unit 1 Atmospheric Distillation unit 2 10,000 BPSD Howbacker 02 Siynia 1978 Year of Operation 03 Kisik 1982 Year of Operation Atmospheric Distillation unit 20,000 BPSD 04 Qaiyarah 1955-1983 Year of Operation A- Asphalt unit 1 Asphalt unit 2 Asphalt unit 3 Asphalt unit 4 B- Atmospheric Distillation unit 1 Atmospheric Distillation unit 2 2,000 BPSD 4,000 BPSD Lummus Ingeco 4/8/2017

Exterior Refineries Process Units and Summery No. Refinery Unit Name Design Capacity Licensor 05 Hadithah 1951 Year of Operation Atmospheric Distillation unit 1 Atmospheric Distillation unit 2 6,000 BPSD 10,000 BPSD FosterWeeler Howbacker 06 Aljazirah 1984 Year of Operation Atmospheric Distillation unit 2,000 BPSD Ingeco 4/8/2017

Iraqi Refineries Location 4/8/2017

North Refineries Company’s Organization Structure 4/8/2017

North Refinery in respect of implementing FCC (Fluid Catalytic Cracking) unit 55,000 BPSD of capacity for conversion fuel oil to light products especially of fuel oil up to 30% of the total production volume. Feasibility Study has been done by JICA. FEED and Licensor Selection will be done by JICA too. Six new boilers- 400 Ton/Hr Capacity, under Construction, Two of them will be to start up Jun 2012. New power generation plant/ 85 MW, contracted and site preparation. plan to be completed April 2013 Reconstruction of 54 Storage Tanks. 90% has been done & will be complet befor July 2012 New LPG Unit/ 400 Ton/day. Contracted will be start up Nov.2013. Upgrading of Waste Water Treatment System. New R.O. unit in Operation since 1/1/2010. NRC has a number of projects which will contribute to the development of the North Refineries Company as follow:- 4/8/2017

Upgrading Existing Hydrogen production with KTI (TKT)company. New Can production line. Contracted with a Germany Company. Sulphur-Pelletisation unit. Received at site and under installing. Upgrading North Refinery’s Control System by Honeywell with DCS system. De-bottlenecking and Improving the performance of North Refinery, by Choyoda & UOP. SAL. 1 Refinery & SAL. 2 Refinery, under discussion with Chemo project. 4/8/2017

Future Major Refineries in Iraq New Kirkuk Refinery in Kirkuk City ( North of Iraq) 150,000 BPSD Refining Capacity FEED will be over by jun2012 Maissan Refinery in Maissan City ( South of Iraq)150,000 BPSD Refining Capacity. Karbala Refinery in Karbala City ( South of Iraq) 200,000 BPSD Refining Capacity. Has been awarded to Italian company for investment. Nasiriya Refinery in Nasiriya City ( South of Iraq) 300,000 BPSD Refining Capacity. 4/8/2017

Achieved about 97 % FEED by Shaw Energy and Chemicals Limited/ UK New Kirkuk Refinery Process Unit’s Licensors for New Kirkuk Refinery Capacity of 150,000 BPSD Achieved about 97 % FEED by Shaw Energy and Chemicals Limited/ UK No Licensor Process Unit 1- SGSI Kerosene Hydrotreating Technology 2- Light Gas Oil Hydrodesulphurisation Technology 3- VGO Hydro-Cracking 4- HALDOR TOPSOE Hydrogen Production Unit 5- POERNER Blown Asphalt 6- UOP Fluid Catalytic Cracking Unit FCC 7- Naptha Hydrodesulphurisation 8- NC4 Isomerisation Unit 9- Continuous Catalytic Reformer CCR 10- C5/C6 Isomerisation Unit 11- MERICHEM Saturated Gas Plant LPG Treatment 12- Unsaturated Gas Plant LPG Treatment 13- DUPONT-STRATCO C3/C4 Alkylation 14- LURGI Sulfur Recovery and Tail Gas 15- Shaw Energy and Chemicals Atmospheric Distillation 16- Vacuum Distillation 4/8/2017

Thank you for your attention NRC’s Aims Our primary goal is to:-   Optimizing production Quantity  Improving products quality. Improving efficiency. a- Replacing North Refinery’s Control System with DCS system. b- Upgrading Sal. 1, Sal. 2, and N.R. refinery. c- Replacing old pumps and compressor with new ones. d- Replacing old Furnace's tubs with new ones.   e- Replacing old North Refinery’s boilers with new ones. Enhancing safety and security. Reducing downtime. Be green with the environment. Rehabilitation North Refinery’s Waste Water Treatments to improve water quality that is been discharged to the river. Thank you for your attention 4/8/2017