Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
Electrical and thermal testing at Glasgow and Liverpool.
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Stephan Haensel - 7th SiLC Meeting - CERN Combined test beam with LCTPC - an update on present status and schedule S. Haensel 1, T. Bergauer 1, M. Dragicevic.
Frank Hartmann IEKP TEC Meeting July 03 Ring 6 mechanical Qualification In a nutshell: rel. precision agreement (Aa-Ka): 3-5µm (  rot.) abs precision.
L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Module Long term test activities University.
Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
DPG 2001 Frank Hartmann (IEKP) P-irradiated-oxygenated Non-irradiated-oxygenated Non-irradiated-non-oxygenated P-irradiated-non-oxygenated sensors put.
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Tracker Week April 2002IEKP 1 Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe Frank Hartmann IEKP - Universität Karlsruhe (TH)
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
CMS Sensormeeting : Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) Mechanical Assembly ready Instruments: LCR, Electrometer, PS, Quasistatic.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Panja Luukka1 Silicon beam telescope for CMS SLHC detector studies (SiBT Panja Luukka, Sandor Czellar, Jaakko Härkönen, Eija Tuominen, Jorma.
Panja Luukka, Helsinki Institute of Physics1 Beam telescope for testing p- and n-type detectors Erkki Anttila, Sandor Czellar, Jaakko Härkönen,
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Panja Luukka1 Silicon beam telescope (SiBT) and MCz detectors: status and plans for 2008 Erkki Anttila, Sandor Czellar, Jaakko Härkönen, Matti.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
1 Minutes form last discussion (after second test beam) 0-Data analysis: a taks force led by the DT DPG convenors to expedite the analysis of Gif++ data.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Catania Production Center S.Albergo Universita’ & INFN Catania.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Karlsruhe probe equipment and QA proposals/expertise
DAQ for ATLAS SCT macro-assembly
System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing.
UCSB Testing Status Anthony Affolder
Update of US Testing Status
UCSB Testing Status Anthony Affolder
Results from module testing
Module production in Italy
Operations/Failure Analysis
B904 Status Report by Fred B.
US Module Testing Progress Report
Operations/Failure Analysis
US Module Testing Progress Report
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
IEKP - Universität Karlsruhe (TH)
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Presentation transcript:

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik1 Organigram of the CMS hardware group in Karlsruhe Sensor quality test Frank Hartmann Stefanie Freudenstein (diplom) C. Menge, Th. Punz (students) + N.N. Irradiation Wim de Boer Alexander Dierlamm (PhD) Alexander Furgeri (PhD) Bonding & test center Hans Jürgen Simonis Tobias Barvich (techn.) 50% Pia Steck (techn.) NN Module qualification & diagnostic Guido Dirkes (PhD) Stefan Heier (PhD) Manuel Fahrer (PhD) Thomas Weiler (PhD) M. Waldschmitt (diplom) B. Atz (techn.) Group leader: Th. Müller Technical coordinator: P. Blüm Integration & long-term test Stefan Heier (PhD) Valery Zhukov Tobias Barvich (techn.) 50% NNs

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik2 1) Readiness of the testing rooms and storage spaces Testing & Storage for QTC & IQC: ready! Bonding & Testing space: ready! Storage module: Space assigned -- Cabinets ordered in workshop Space for pre-prod (~50 modules) ready! Testing & Storage for petals: for pre-prod (ready when needed) for production: available summer-fall (staged)  Assembly & Testing & Storage in new hall!

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik3 Operations layout at Karlsruhe Quality test center Visual inspection LAB 010 Probing LAB 326 Irradiation Cyclotron, LAB 325/6 Logistic center Bonding & test center Integration center ~6000 sensors 5 % 1600 modules Bonding qualified & operational Test station operational X-check in progress (already done with Ac in ex-line 1) Fast test LAB 013 Diagnostic LAB 316 Bonding repair LAB 013 storage Longterm test (Petal) Repair modules for 50 petals Clean room (~30m 2 ) tender (to be ready Nov 2003) qualified & operational Irradiation restart April (hopefully) 5 % (present 100%) Hall 245 Integration on petal 1 %

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik4 2.) Readiness of Readout I (ARC) Aachen LED array and high voltage card ordered for full cross calibration with KA (FED-based) readout systems. Purpose: reception and testing of hybrids! hyb tested: 2 reprod:fine x-calib:waiting for calib. module Db integration:yes LED:Ac LEDs ordered for x-calib software ver:6.0b

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik5 2.) Readiness of Readout II FASTTEST (FED-based) Purpose: fast testing after bonding modules tested: ~15 modules tested (prototype, expressline 1, expressline 2) reprod:fine X-calib I:see above X-calib II:Officially waiting for calib. module Db integration:Done, … to be commissioned LED:4 LED arrays included Cooling:active cooling with Peltiers possible LED readout at -10°C possible cosmics calibration

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik6 Fasttest II Bonder ESD Facemask Already moved to final area (bonding lab)!

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik7 Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik1 2/3.) Readiness of Readout III Diagnose (FED-based) Purpose: diagnostics of faulty modules modules tested:~5 modules tested (prototype, expressline 1, expressline 2) reprod, X-calib I, X-calib II, Db integration:same state as fasttest (II) LED array:(1050nm and 950nm) Movable LASER:for single strip/pitch scans (1050/650 nm) possibility to set probe needles, tests with a 90 Sr source cosmics high resolution IV possibility to introduce CV.

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik8 2/3.) Readiness of Readout DAQ CMS-System Purpose: Module testing development towards petal readout system modules tested: ~1 module tested reprod:fine X-calib:Not yet Db integration:YES software ver: Lt_v.82 installed and tested with Db for one 'old' module. Update to v.90 and x-calibration is foreseen (responsibility of V. Zhukov) This setup will be finally used for the petal assembly! We need another one for the petal longterm testing!

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik9 4) Readiness of the LT single module set-up! We have NO dedicated SINGLE LT teststation! KA LT Plan! Use of the Fastteststation (II) with active cooling! –1/day: last bonded module for LT over night –1/week:last bonded module for LT over weekend 4.1) General comments on software! Fastteststation soft 4.2) is the LT single module set-up commissioned? FASTTEST YES 4.3) number of hour of running for the longest run performed20h 4.4) list of missing equipment to enter into production!Ready 4.5) Are results obtained with ARC and LT in your lab in agreement? –Basically YES, –final x-calibration still to be done! The final production LT will be done on petal basis.

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik10 Stability: Calibrated with cosmics HITMAP: ~ 20 hours run ( Hz)

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik11 Add. Comments on Cross Calibration ARCS Karlsruhe (for all stations!) Several modules tested in Aachen and Karlsruhe. Full comparison with TEC Expressline I, already presented in several prior meetings (and partially by analysing Expressline II modules) Many basic and analysis results already shown in several meetings! 1.pinhole tests, basic defect analysis 2.TEC Expressline I & II 3.single shot test beam 4.Test of irradiated hybrids --- modules forseen (  active cooling) 5.Ongoing scratch and high leakage current tests 6.Starting of bond tests in high magnetic Karlsruhe Aachen

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik12 Add. NEEDS for petal assembly and petal LT 1 FED 1 FEC 7+1 OEC LV (ordered), HV, LLN cooling plant (ordered) actual need for prototype petal: –4 optical hybrids + 1 OEC (already in house, but requested for X5) –Optical cables –Interconnectboard inc. CCUM

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik13

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik14 New Hall