G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

1 Code 210 Training Forum May 14, 2008 Agenda I.Welcome/Introduction II.ISO General Principles III.ISO Basics for Code 210 IV.Upcoming ISO Audits V.Code.
Effectively Integrating Information Technology (IT) Security into the Acquisition Process Section 4: Effective Integration.
1 Government-Industry Data Exchange Program GIDEP as a Resource Presentation for the Code 300 Orientation June 15, 2012 Presented by: Michael J. Sampson,
Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Module 1 Get Started – Establish a Planning Team Planning for Emergencies – For Small Business –
9 th Annual Public Health Finance Roundtable November 3, 2012 Boston, MA Peggy Honoré.
Sodexo.com Group Internal Audit. page 2 helps an organization accomplish its objectives by bringing a systematic, disciplined approach to evaluate and.
Quality Assurance Strategies for Class D Payloads NASA Academy of Aerospace Quality (AAQ) Mini-Workshop March 22 nd, 2012 Jose Nunez, Ph.D., P.E. KSC/UB.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Purpose of the Standards
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Internal Auditing and Outsourcing
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Buck Crenshaw, Program Element Manager, NASA-Wide.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Loss Control Program Compliance Audits An overview of the purpose and procedures of program auditing.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Security Assessments FITSP-A Module 5
From Research Prototype to Production
Mission Success Starts With Safety 07/19/2001 (1) NASA EEE Parts Assurance Group (NEPAG) Quality Leadership Forum July 19, 2001 Michael J. Sampson NEPAG.
1 Configuration Management “The Cookbook Approach”
Learning Objectives LO5 Illustrate how business risk analysis is used to assess the risk of material misstatement at the financial statement level and.
ESA/ESTEC, TEC-QQS August 8, 2005 SAS_05_ESA SW PA R&D_Winzer,Prades Slide 1 Software Product Assurance (PA) R&D Road mapping Activities ESA/ESTEC TEC-QQS.
Mandatory Technical Standards Engineering Management Board Goddard Space Flight Center July 10, 2003 Updated October 7, 2003 HQ/Code AE R. Weinstein.
Preventing events “…that could not only hurt someone, but hurt someone you know and … could have a dramatic consequence on all of us “ SO’K Mission Success.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
JLab Software Assurance Program A Risk Based Approach to Software Management.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Software Configuration Management (SCM). Product Developer Disciplines One view of the world is that there are three types of activities are required.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
ISM at the Savannah River Site
New Products from NASA’s Software Architecture Review Board
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Charlie Robinson / NCAS Quality Assurance and Risk Management Services, Inc October 2008 Goddard Space Flight Center - Greenbelt, MD.
Safety and Mission Assurance Directorate, Goddard Space Flight Center Supply Chain Management Panel Session: NASA Supplier Assessments: Processes, Results.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
GSFC Safety & Mission Assurance (SMA) Briefing for Goddard Contractor Association 7/2/15.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Belgian Technical Cooperation Internal audit presentation.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
THEMIS Mission Assurance
ISUAL Product Assurance
Air Carrier Continuing Analysis and Surveillance System (CASS)
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
BRIAN KLATT MISSION ASSURANCE MANAGER
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission Assurance Branch Tel:

October 20, How Code 300 Organization Interacts With GSFC Projects QUALITY ENGINEERING TEAM (HW/SW) Code 323 SYSTEM SAFETY ENGINEERING Code 321 RELIABILITY ENGINEERING Code 322 Code 320 MATERIALS ENGINEERING Code 541 EEE PARTS/ RADIATION ENGINEERING Code 562 Code 561 CONTAMINATION Code546 RESIDENT OFFICE SUPPORT AT SUPPLIERS’ FACILITIES PROGRAM MANAGER PROJECT MANAGER Chief Safety & Mission Assurance Officer (CSO) SOFTWARE ASSURANCE

G O D D A R D S P A C E F L I G H T C E N T E R 3 Organization Charter The Mission Assurance Branch provide expertise to the GSFC space flight projects and space flight support programs in the implementation of mission assurance. This expertise is managed through a single point of contact, the Chief Safety and Mission Assurance Officer (CSO) who functions as a member of the project management team. Generally the CSO is co-located with the project office, to provide the most efficient access to the project manager and his staff.

G O D D A R D S P A C E F L I G H T C E N T E R 4 Organization Functions Chief Safety and Mission Assurance Officer CSO CSOs assigned to Projects (formerly known as SAMs and FAMs before that) –Co-located with Projects –Reports to Project Manager (dotted line) –Assurance program includes Quality Assurance, S/W assurance, Safety, Reliability, Workmanship, Risk Management, Parts, Materials Reports independently back to Code 300 Works Project for the full life-cycle from Concept through Launch Manages assurance program for both in-house and out-of-house Projects Generates and implements Mission Assurance Requirements (MAR)

G O D D A R D S P A C E F L I G H T C E N T E R 5 Organization Functions CSOs cont’d Lead for Problem Report/Problem Failure Report (PR/PFR) System Lead for Work Order Authorization (WOA) implementation (in-house projects) Responsible for manufacturing and QA oversight of Project contractors by utilizing: –Defense Contracts Management Agency (DCMA) –NASA Audits, Assessments, and Assurance (A3 – formerly NCAS) –Code 300 Support Contractors –Audits by either Project personnel or Code 302 Works with Systems Safety Engineers to implement project safety program Works with Reliability engineering to implement project reliability program

G O D D A R D S P A C E F L I G H T C E N T E R 6 Organization Functions CSOs cont’d Member of Parts Control Board. Works closely with Code 562 Parts Engineers. Implements Government-Industry Data Exchange Program (GIDEP) compliance and dispositions Works with Code 541 Materials to determine acceptability of materials and printed wiring boards by coupon evaluation Ensures parts and materials lists are thoroughly reviewed and acceptable for use. Coordinates radiation requirements and implementation with Code 561 (Radiation Effects) Implements Workmanship Standards such as soldering, cabling, harnessing, conformal coating

G O D D A R D S P A C E F L I G H T C E N T E R 7 Work Examples (Sometimes Things still go wrong)

October 20, SMA Plan and Standard MAR The CSO writes the SMA Plan to describe implementation of SMA on a particular project including both in-house and out-of-house work. This will include applicable GPRs/PGs/WIs, NPRs, NASA standards, GSFC standards, etc. that apply to in-house SMA, out-of-house SMA, or both. The MAR is used as a procurement document and is an extension of the Statement of Work on a procurement. Only the applicable sections will get identified on the contract. The CSO uses as a guide the Standard MAR as a tailoring tool and consults with functional disciplines in Codes 301, 302, 320, 541, 562 and other GSFC organizations to develop the MAR for their Instrument, Spacecraft, and Ground System. Missions are classified as “A” (high priority, minimized risk level) through “D” (low priority, higher risk level is tolerated). The Standard MAR document number is 320-MAR The latest version can be found at - click on link in left hand margin. The Standard MAR includes specific data items (such as parts lists, safety plan) to impose on the procurement WI B, Project Mission Assurance Requirements (MAR) Preparation establishes relevant procedures and processes for its use.

October 20, NPR Appendix A: Subject: Risk Classification for NASA Payloads CharacterizationClass AClass BClass CClass D Priority (Criticality to Agency Strategic Plan) and Acceptable Risk Level High priority, very low (minimized) risk High priority, low riskMedium priority, medium risk Low priority, high risk National significanceVery highHighMediumLow to medium ComplexityVery high to highHigh to mediumMedium to low Mission Lifetime (Primary Baseline Mission Long, >5yearsMedium, 2-5 yearsShort, <2 yearsShort < 2 years CostHighHigh to mediumMedium to lowLow Launch ConstraintsCriticalMediumFewFew to none In-Flight MaintenanceN/ANot feasible or difficultMaybe feasibleMay be feasible and planned Alternative Research Opportunities or Re-flight Opportunities No alternative or re-flight opportunities Few or no alternative or re- flight opportunities Some or few alternative or re-flight opportunities Significant alternative or re- flight opportunities Achievement of Mission Success Criteria All practical measures are taken to achieve minimum risk to mission success. The highest assurance standards are used. Stringent assurance standards with only minor compromises in application to maintain a low risk to mission success. Medium risk of not achieving mission success may be acceptable. Reduced assurance standards are permitted. Medium or significant risk of not achieving mission success is permitted. Minimal assurance standards are permitted. ExamplesHST, Cassini, JIMO, JWSTMER, MRO, Discovery payloads, ISS Facility Class Payloads, Attached ISS payloads ESSP, Explorer Payloads, MIDEX, ISS complex subrack payloads SPARTAN, GAS Can, technology demonstrators, simple ISS, express middeck and subrack payloads, SMEX NOTES: 1. Mission impact; i.e., loss of function effect on other payloads or ISS operations may also be a characterization factor. For example, loss of the function of freezers and centrifuges may impact other payloads and increase the overall level of risk. 2. The safety risk to crew inherent in the operation of a human-crewed vehicle may be a factor in payload classification determinations. Class C and D payloads that have a medium or high risk of not achieving mission success may be considered unsuitable for launch on a crewed vehicle, unless they are secondary payloads making use of available launch capacity that would otherwise go unused. 3. Other situation-dependent payload classification considerations may include human-rating environment, logistics support, and interoperability interfaces.

October 20, Support at Suppliers Develop Program/Project Quality Assurance Surveillance Plans The work activities performed by the developer and/or his suppliers are subject to evaluation and audit by government-designated representatives. CSO supports project by selecting on-site supplier representative’s by one of several methods: –(1) a Defense Contract Management Agency (DCMA) person via a Letter Of Delegation (LOD), –(2) an independent assurance contractor (IAC) via a contract Audits, Assessments, and Assurance (A3) Contract Code 300 Mission Assurance Support Contract (MASC)

October 20, Project Assignments (1 of 2) 9/6/2011

October 20, Project Assignments (2 of 2) 9/6/2011

G O D D A R D S P A C E F L I G H T C E N T E R 13 In Conclusion The MAB provide the overall S&MA leadership for projects being developed at the GSFC and are critical for mission success. Questions?