Pubertals and One-generation Extension. Overview of questions Does the fire raise significant concerns? Should the EPA bring the pubertal and one-gen.

Slides:



Advertisements
Similar presentations
WP Operative Plan WP 4 : Functional requirements Task Responsible: Regione Piemonte.
Advertisements

Health and Safety Executive Ecotoxicology Annex II and III data requirements Mark Clook Chemicals Regulation Directorate Health and Safety Executive UK.
Pesticides and endocrine disruption Hans Muilerman, PAN Europe
1 Development, Implementation and Use of Alternative Test Methods in Regulatory Hazard Assessment in OECD Member countries Herman B.W.M.Koëter, Principal.
Work Disruption, Worker Health, and Productivity Mariesa Herrmann Columbia University Jonah Rockoff Columbia Business School and NBER Evidence from Teaching.
Company Confidential © 2012 Eli Lilly and Company Beyond ICH Q1E Opening Remarks Rebecca Elliott Senior Research Scientist Eli Lilly and Company MBSW 2013.
1 PM NAAQS: Update on Coarse Particle Monitoring and Research Efforts Lydia Wegman, Office of Air Quality Planning & Standards, EPA Presentation at the.
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Year End Review January, 2015.
Richard A. Becker, Ph.D., D.A.B.T American Chemistry Council Arlington, Virginia Comments on “Dose Setting” EDMVS Meeting July 23-24, 2002.
Review of industry code governance 26 March 2010.
1 High Production Volume (HPV) Challenge Program – Future Directions Jim Willis Director, Chemical Control Division, Office of Pollution Prevention and.
Priority-setting for the Endocrine Disruptor Screening Program: Pesticide Active Ingredients Penelope A. Fenner-Crisp Office of Pesticide Programs U.S.
Endocrine Screening – Phase 1 TSCA 8(e) and FIFRA 6(a)(2) Requirements A. Michael Kaplan, Ph.D. December 13, 2010 A. Michael Kaplan & Associates, LLC
Healthy Child Development Suggestions for Submitting a Strong Proposal.
EDSP Validation Gary E.Timm Senior Technical Advisor Office of Science Coordination and Policy U.S. Environmental Protection Agency.
Modified Supplemental Retirement Plan Amended Human Resources | Curt Devan | Matt Moore | September 2006.
Fish Screening Assay Detailed Review Paper NACEPT Endocrine Disruptor Methods Validation Subcommittee March 2002 Les Touart.
Criteria for Screens— Review of the EDSTAC Recommendations Presentation to the EDMVS July 23, 2002.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
What Information Fulfills EDSP Screening Requirements?
Office of Financial Planning October 2009 FY Budget Preparation.
Mod for Discussion on 7 th January 2011 Draft Outline of Potential Refinements to the User Pays Modification Process Action RG Based on discussions.
Copyright The McQuaig Group Inc. 1 Six Thinking Hats ® As a Problem Solving and Directed thinking Tool Presented by: Suman Datta.
Status of the U.S. Endocrine Disruptor Screening Program (EDSP) Status of the U.S. Endocrine Disruptor Screening Program (EDSP) September
Prevalidation Study Plan for Sliced Testes Assay Gary Timm Presented to EDMVS August 20, 2003.
EDSP’s Approach to Test Protocol Validation Office of Science Coordination and Policy U.S. Environmental Protection Agency.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
1 Tier 1 EDSP: Other Scientifically Relevant Information Barbara Neal Exponent December 13, 2010.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Wildlife Screens What Do They Tell Us? Dr. Pat Guiney Manager Global Safety, Regulatory & Environmental Assessment S.C. Johnson & Son, Inc. Racine, WI.
RTF Management Items December 16, Contract Analyst Selection Technical Portion of Scope: Hadley Rushton Ptarmigan Research Research and Evaluation:
Classified Staff Hiring Process 11 November 2010 Overview of systems and processes used to hire classified staff.
Rabbanai T. Morgan Current as of 26 January 2006 Protests.
EDSP: T IER 1 T ESTING I NFORMATION C OLLECTION ISRTP 2010 Endocrine Workshop EDSP Compliance December 13, 2010 Susan Ferenc, DVM, Ph.D.
Conclusion with State Lands PRC Sunnyside Lane Tahoe City 20 February 2015 Prepared by Greg Price (415)
Identifying and recruiting patients for clinical trials in the future: a pharma perspective Rob Thwaites EC/EFPIA Workshop on ” Primary and secondary use.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
State Assessments: Updates and New Info Peg Moran Hussien Tim Peterson November 2015.
An Overview of the Objectives, Approach, and Components of ComET™ Mr. Paul Price The LifeLine Group All slides and material Copyright protected.
ECC Task Force Webinar November 13, Peak Anti-Trust Statement Meeting Minutes (June and Sept) Phase 1A Progress Phase 1A External Entity Testing.
Page 1 Future Strategy and Work Plan IESBA CAG Meeting September 11, 2013 New York Ken Siong, IESBA Technical Director.
PM2.5 NAAQS Implementation Interactive Session NACAA Annual Meeting May 8, 2013 St. Louis, MO 1.
Economic Development, Agriculture, and Natural Resources Subcommittee Dolores Esser, Commissioner Virginia Employment Commission January 29, 2009.
IANA Stewardship Transition & Enhancing ICANN Accountability Panel and Audience discussion | WSIS Forum | 5 May 2016.
Endocrine Disruptor Screening and Testing: An Industry Update
High School Application Process School Year
Response to ANEC proposal for Booster phase out in R44
The Club Health Assessment
Niagara River Area of Concern
Status report on the activities of TF-CS/OTA
Concentrated Animal Feeding Operations (CAFOs) National Pollutant Discharge Elimination System (NPDES) CAFO Rule and the Proposed Idaho NPDES CAFO General.
MULTI-valued logic.
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Potential Milestones A timeline to finish in one year
Upcoming EQR Activities
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Exit Capacity Substitution and Revision
Parents Information Evening Transfer to Secondary School
Labs from Units 2, 3, and 4: Semester 1 Final.
The UCAS Journey Making a successful UCAS application
Information Session October 13, 2016
Water Directors meeting Warsaw, 8-9 December 2011
Parents Information Evening Transfer to Secondary School
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

Pubertals and One-generation Extension

Overview of questions Does the fire raise significant concerns? Should the EPA bring the pubertal and one-gen extension study designs to EDMVS before moving forward? Should EPA halt prevalidation studies that have been begun in parallel with DRP development, until EDMVS approves the DRPs?

Does the fire raise significant concerns? Is Bisphenol A an issue? Does EDMVS wish to see the final report of the independent review panel? yyes, before moving forward yyes, but go ahead in the meantime yno, the fire is not a significant issue

Fire considerations If fire report is brought to EDMVS yone-gen study will not start Nov. 14 ypubertal array study may not begin in early January

Pubertals Single-dose data Multi-dose ystudy design, chemical & dose selection Multiple-chemical array ystudy design, chemical & dose selection

Pubertal considerations December agenda, unavailability of alternative dates. Extend Dec. meeting? Review time for single-dose data y(not available in soft copy) Study design is currently based on the expert advice of developers of assay (EPA/RTP)

One-generation extension New protocol, never performed Developed by EPA/RTP Reviewed by P. Foster, CIIT Proof-of-concept only; multi-chemical study will be done later

Details: Pubertals (1)

Details: Pubertals (2) Male and female are parallel but separate Potential delay due to recent fire in lab

Upcoming EDMVS meetings: December 2001 Detailed Review Papers yaromatase ysteroidogenesis yin utero through lactation Need for pubertal DRP? Low dose

Upcoming EDMVS meetings: March 2002 Detailed Review Papers on OECD assays yFish reproduction yFish chronic yAvian chronic yInvertebrate yFrog screen and chronic (?) Fish repro screen vs. vitellogenin Dose-setting in validation studies Restricted feeding study protocol

Upcoming EDMVS meetings: June 2002 Pubertal prevalidation ysingle-dose ymultiple-dose yarray of chemicals Mammalian two-gen prevalidation ythyroid study yone-gen extension Steroidogenesis prevalidation Aromatase prevalidation

Questions for discussion tomorrow Is the logic of the plan sound? Are the time estimates reasonable? Is a Mammalian 2-gen DRP needed? Is a Mammalian 2-gen practicality study needed? Should we be concerned about the fire in the lab?