One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop ERDC Vicksburg, Mississippi 18-20 April.

Slides:



Advertisements
Similar presentations
Mei-Ting Huang Ph. D. Student,Graduate School of Management Accounting Doctoral Program, National Yunlin University of Science and Technology, Taiwan .
Advertisements

Signatur A web-based tool to test Current and Future perspectives in Air Pollution Forward-Looking Information in Environment Assessment Copenhagen.
8 April 2003 Annex III of the model contract Networks of Excellence Training session for FP6 National Contact Points, Brussels, 8 April 2003 Colette Renier,
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
1 Waterways Research Inland Waterway Lock/Vessel Optimization Study Upper Mississippi River Locks Center For Transportation Studies University Of.
Executive Session Office of Asset Management
Lessons Learned from a Low-Slope Roof System LCA Project Dr. James L. Hoff, DBA TEGNOS Research, Inc. Prepared for ASTM E-60 Workshop on.
Risk Management Introduction Risk Management Fundamentals
Presentation of the proposed Annex 19 – Safety Management
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
Methow Valley Irrigation District Alternatives Evaluation Presented by Bob Montgomery, P.E. and David Rice, P.E. January 31, 2013.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Evaluation Orientation Meeting Teacher Evaluation System
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
December 3, Performance Appraisal for Experienced Teachers WCDSBandOECTA.
JUNE FLOODS AND STORMS Preliminary Damage Assessment Brief
Upper Mississippi River - Illinois Waterway System Feasibility Study Extended Lock Design Concept.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Background on Engineering Risk Assessments (ERA) for USACE Civil Works.
Distillate Workshop DfT Thoughts. There’s a lot going on (even more than usual) There’s a lot I’m not directly involved in I’ll try to take quick.
Engineering Economic Analysis Canadian Edition
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006 Mel Price – Auxiliary.
Columbia River Lock Users Meeting Portland District Corps of Engineers August 14, 2007 US Army Corps of Engineers Portland District Portland District.
Risk-Based Inspection Program Best Practice – Executive Summary
Planning for Restoration of the Mississippi River in the Twin Cities Christian Lenhart.
Methodology for Architectural Level Reliability Risk Analysis Lalitha Krothapalli CSC 532.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Economic Impact Study Utah State Office of Rehabilitation CPPA Contacts: Jennifer Robinson (801) Sarah Wilhelm (406)
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
One Team: Relevant, Ready, Responsive and Reliable Navigation Lock and Dam Inspection and Emergency Repairs Workshop ERDC Vicksburg, Mississippi Concrete.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions 1 What is Engineering Risk and Reliability? Why We Use It? Robert C.
Engineering Economic Analysis Canadian Edition
Research and Development Inland Navigation Research Inland Waterways Conference March 7, 2007 Cincinnati, OH Program Manager: James Clausner HQ Navigation.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
CTE Pathway What we know at this time o an approved program is the major component of a CTE Pathway o 14 technical assessments have been approved for use.
Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an.
One Team: Relevant, Ready, Responsive, Reliable 1 Hannibal L/D Ohio River - Quoin Block Failure 110-ft x 1200-ft Main Lock Sep & Nov 2005 Pittsburgh District.
Research and Development Inland Waterways Conference 7 March 2007 Improved Hydrodynamic Design/Detection and Evaluation of Scour at Dams John E. Hite,
One Corps Serving the Armed Forces and the Nation Mel Price Locks & Dam Miter Gate Inspections Navigation Lock and Dam Inspection and Emergency Repairs.
US Army Corps of Engineers Great Lakes & Ohio River Division US Army Corps of Engineers Great Lakes & Ohio River Division Achieving Navigation Systems.
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
El Gallo Hydroelectricity Project PDD Analysis
Risk Analysis for Major Rehabilitation. Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation.
US Army Corps of Engineers BUILDING STRONG ® Mat Sinking Unit John W. Cross Commander, Vicksburg District March 2015 Exploring Redesign and Replacement.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and.
Security at FERC Energy Projects Energy Bar Association Mid-Year Meeting Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory.
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Embankment Dam and Spillway Relative Risk Procedures (for Asset Management/Maintenance) Luc Chouinard – McGill University.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Failure Modes and Effects Analysis (FMEA)
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Port of Pittsburgh Commission James R. McCarville Met Coke Conference – Pittsburgh November 2, 2010 Welcome to the Port of Pittsburgh.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Project Updates Louisiana Water Synergy Project May 19, 2016.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
URBAN STREAM REHABILITATION. The URBEM Framework.
An Introduction to the Climate Change Explorer Tool: Locally Downscaled GCM Data for Thailand and Vietnam Greater Mekong Sub-region – Core Environment.
UMCP Learning Objectives
USACE Standardization of Navigation Infrastructure
Embry-Riddle Aeronautical University
Catastrophe Modeling Personal Lines Perspective
RISK MANAGEMENT An Overview: NIPC Model
Outcross Resources - Services Overview
Updating the failure probability of miter
Illinois Waterway 2020 Consolidated Closure
Methodology for Architectural Level Reliability Risk Analysis
Conflict Engineering proposal
Main recommendations & conclusions (1)
Water Director's Meeting December 2013, Vilnius DG Environment
Presentation transcript:

One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop ERDC Vicksburg, Mississippi April 2006 Navigation Lock and Dam Inspection and Emergency Repairs Workshop ERDC Vicksburg, Mississippi April 2006 Methodology for Assessing Concrete Condition for Rehabilitation at LaGrange Lock Anne M. Werner, Ph.D., P.E. Rock Island District Methodology for Assessing Concrete Condition for Rehabilitation at LaGrange Lock Anne M. Werner, Ph.D., P.E. Rock Island District

One Corps Serving the Armed Forces and the Nation Methodology for Assessing Concrete Condition for Rehabilitation INSPECTION JUSTIFY FUNDING REPAIR/ REHAB? FUND?

One Corps Serving the Armed Forces and the Nation Methodology for Assessing Concrete Condition for Rehabilitation INSPECTION JUSTIFY FUNDING REPAIR/ REHAB? FUND?

One Corps Serving the Armed Forces and the Nation Inspection – LaGrange Lock INSPECTION

One Corps Serving the Armed Forces and the Nation Repair/Rehab? REPAIR /REHA B?

One Corps Serving the Armed Forces and the Nation Justify Funding - RER  Rehabilitation is intended to improve reliability of an existing structure;  Rehabilitation must be economically justified by benefit-cost analysis;  Economic analysis must include probabilistic life-cycle simulation with setbacks for repairs and rehabilitation.  Rehabilitation is intended to improve reliability of an existing structure;  Rehabilitation must be economically justified by benefit-cost analysis;  Economic analysis must include probabilistic life-cycle simulation with setbacks for repairs and rehabilitation. JUSTIFY FUNDING

One Corps Serving the Armed Forces and the Nation Justify Funding - RER  EP Project Operations - Partners and Support (Work Management Guidance and Procedures) provides guidance for RERs  Allows subjective probability (Expert Elicitation) to calculate probability of unsatisfactory performance  EP Project Operations - Partners and Support (Work Management Guidance and Procedures) provides guidance for RERs  Allows subjective probability (Expert Elicitation) to calculate probability of unsatisfactory performance JUSTIFY FUNDING

One Corps Serving the Armed Forces and the Nation Expert Elicitation  Should only be used when?  Who are the experts?  Model is still required. What to model? How to model?  Should only be used when?  Who are the experts?  Model is still required. What to model? How to model?

One Corps Serving the Armed Forces and the Nation Other Methods for Life Cycle Analysis  Methods Analytical Models – Freeze/Thaw, AAR, Sulfate Attack, Corrosion Condition Indices/Ranking  Issues Models  Large number of variables  Usable results? Condition Indices/Ranking  Lack probabilistic life cycle analysis  Methods Analytical Models – Freeze/Thaw, AAR, Sulfate Attack, Corrosion Condition Indices/Ranking  Issues Models  Large number of variables  Usable results? Condition Indices/Ranking  Lack probabilistic life cycle analysis

One Corps Serving the Armed Forces and the Nation LaGrange Lock Expert Elicitation Workshop  LaGrange Lock Concrete Expert Elicitation Workshop (Aug 2004)  Five experts  Site visit  Two day workshop  LaGrange Lock Concrete Expert Elicitation Workshop (Aug 2004)  Five experts  Site visit  Two day workshop

One Corps Serving the Armed Forces and the Nation Elicitation Process  4 Components Land Wall Concrete River Wall Concrete Upper Miter Concrete Lower Miter Concrete  4 Components Land Wall Concrete River Wall Concrete Upper Miter Concrete Lower Miter Concrete

One Corps Serving the Armed Forces and the Nation Elicitation Process COMPONENT SATISFACTORY PERFORMANCE UNSATISFACTORY PERFORMANCE MINOR CATASTROPHIC MAJOR SEVERE MINOR SETBACK CATASTROPHIC SETBACK MAJOR SETBACK SEVERE SETBACK Step 1Step 2 Step 3

One Corps Serving the Armed Forces and the Nation Elicitation Process  Step 1: Determine the performance probability, P, of an unsatisfactory performance for component determined over time , 2004, 2029, 2054 unsatisfactory performance means the component has failed to perform properly and causes adverse impacts to the capability of the lock and navigation  Step 1: Determine the performance probability, P, of an unsatisfactory performance for component determined over time , 2004, 2029, 2054 unsatisfactory performance means the component has failed to perform properly and causes adverse impacts to the capability of the lock and navigation COMPONENT UNSATISFACTORY SATISFACTORY

One Corps Serving the Armed Forces and the Nation Elicitation Process

One Corps Serving the Armed Forces and the Nation Elicitation Process  Step 2: Given an unsatisfactory performance, determine the conditional probabilities, p1, p2, p3 and p4, of the resulting potential consequences minor, major, severe, catastrophic conditional probabilities together must add up to 1 (or 100%)  Step 2: Given an unsatisfactory performance, determine the conditional probabilities, p1, p2, p3 and p4, of the resulting potential consequences minor, major, severe, catastrophic conditional probabilities together must add up to 1 (or 100%) UNSATISFACTORY PERFORMANCE MINOR CATASTROPHIC MAJOR SEVERE

One Corps Serving the Armed Forces and the Nation Elicitation Process  Step 3: Given an unsatisfactory performance has occurred and repairs have been made, determine the setback,  P, to the future probability of unsatisfactory performance. determine for all consequences (minor, major, severe and catastrophic) determines the effect of repairs to the lock  Step 3: Given an unsatisfactory performance has occurred and repairs have been made, determine the setback,  P, to the future probability of unsatisfactory performance. determine for all consequences (minor, major, severe and catastrophic) determines the effect of repairs to the lock UNSATISFACTORY PERFORMANCE MINOR CATASTROPHIC MAJOR SEVERE MINOR SETBACK CATASTROPHIC SETBACK MAJOR SETBACK SEVERE SETBACK

One Corps Serving the Armed Forces and the Nation Elicitation Results

One Corps Serving the Armed Forces and the Nation Elicitation Results  Repair costs = $8.4M  Closure time costs = $90.4M  Concrete rehabilitation was recommended by expert panel  New method for determining setbacks  Optional elicitation methods explored  Better understanding of the process  Repair costs = $8.4M  Closure time costs = $90.4M  Concrete rehabilitation was recommended by expert panel  New method for determining setbacks  Optional elicitation methods explored  Better understanding of the process

One Corps Serving the Armed Forces and the Nation Justify Funding?  Concrete rehabilitation was recommended by expert panel.  Annualized cost for concrete rehab - $5.2M  Annualized benefits - $7.2M  B/C Ratio = 1.41  Net Annual Benefits = $2.1M  RER approved  Concrete rehabilitation was recommended by expert panel.  Annualized cost for concrete rehab - $5.2M  Annualized benefits - $7.2M  B/C Ratio = 1.41  Net Annual Benefits = $2.1M  RER approved FUND?

One Corps Serving the Armed Forces and the Nation Applicability of Expert Elicitation  Lock 19 Closure Cells Lockwalls  Lock 19 Closure Cells Lockwalls Lock 19

One Corps Serving the Armed Forces and the Nation Applicability of Expert Elicitation  Lock and Dam 18 Dam 18

One Corps Serving the Armed Forces and the Nation Summary  Repair/rehabilitation must be justified by cost/benefit analysis  Expert elicitation provides a method to provide a probabilistic life cycle analysis  Expert elicitation may be an option when other methods are not  Further development of service life models and updated guidance on life cycle analysis would be helpful  Repair/rehabilitation must be justified by cost/benefit analysis  Expert elicitation provides a method to provide a probabilistic life cycle analysis  Expert elicitation may be an option when other methods are not  Further development of service life models and updated guidance on life cycle analysis would be helpful

One Corps Serving the Armed Forces and the Nation Questions/Comments?