Proton Capabilities at Fermilab Steve Holmes Neutrino Summit 21 July 2014.

Slides:



Advertisements
Similar presentations
Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL.
Advertisements

WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
1 Project X Proton Driver David Neuffer September 2011.
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
ISIS Accelerator Division
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Ion Accelerator Complex for MEIC January 28, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Project X Update Steve Holmes SPAFOA Meeting November 13, 2012
Project X: Staging and Development Strategy Steve Holmes Fermilab PAC June 20, 2012.
Project X: Project Status Steve Holmes Project X Working Group Meeting December 15, 2011.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
F Project X Overview Dave McGinnis October 12, 2007.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
Project X: A Multi-MW Proton Source at Fermilab Manfred Wendt & Steve Holmes SPL/ESS Collaboration Meeting Lund June 30, 2010.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Project X Overview L. Prost (for the Project X team) FNAL Accelerator Physics forum CERN June 17, 2013 Many slides taken from V. Lebedev, S. Nagaitsev,
Staging Opportunities for Project X Steve Holmes on behalf of the PX Team Accelerator Physics and Technology Seminar May 8, 2012.
High Power Proton Facilities Sergei Nagaitsev APS April 2015 meeting 11 April 2015.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
MegaWatt Proton Beams for Particle Physics at Fermilab Steve Holmes P5 Meeting/BNL December 16, 2013 projectx-docdb.fnal.gov/cgi-bin/ShowDocument?docid=1232.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Linac4 Status 1 M. Vretenar sLHC public event
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Project X Update Steve Holmes Accelerator Advisory Committee Meeting November 7, 2011.
PIP-II: Goals, Strategy, and Status Paul Derwent 26 February, 2015.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Project X goals and organization Sergei Nagaitsev October 4, 2011.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
PIP-II Overview: Goals, Status, Strategy Steve Holmes PIP-II Machine Advisory Committee 9-11 March 2015.
Risk Elements Marc Kaducak Project X Machine Advisory Committee March 18-19, 2013.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Introduction to PIP-II Steve Holmes DOE Independent Project Review of PIP-II 16 June 2015.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
UK Neutrino Factory Conceptual Design
Progress towards Pulsed Multi-MW CERN Proton Drivers
SLHC-PP kick-off meeting, CERN 9 April 2008
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Proton Capabilities at Fermilab Steve Holmes Neutrino Summit 21 July 2014

Program Goals Our goal is to construct & operate the foremost facility in the world for particle physics research utilizing intense beams. Neutrinos –MINOS+, kW >1-2 MW 10’s kW Muons –Muon kW kW Longer term opportunities  This requires more protons! 6/21/2014S. Holmes | Neutrino Summit 2

The Fermilab Accelerator Complex Today The Fermilab complex currently delivers protons for neutrino production at both 8 and 120 GeV, with a present capability*: –Booster: 4.2× Hz = 40 kW –MI: 3.5× Hz = 500 kW Fundamental limitations –Booster pulses per second The Booster magnet/power supply system operates at 15 Hz However the rf system is only capable of operating at ~7.5 Hz –Booster protons per pulse Limited by space-charge forces at the Booster injection energy, i.e. the linac energy * Current configuration 6/21/2014S. Holmes | Neutrino Summit3

Strategy for the next ~10 years Proton Improvement Plan (PIP) The goal is to double the Booster beam repetition rate to 15 Hz, while addressing intermediate-term reliability concerns –Required for simultaneous operations of NOvA, g-2/Mu2e, SBNE –700 kW to NOvA Design Criteria –15 Hz beam operations at 4.2×10 12 protons per pulse (80 kW) –Linac/Booster availability > 85% –Residual activation at acceptable levels –Useful operating life through 2025 Scope –RF upgrades/refurbish –Replace components posing high availability risk DTL rf  200 MHz klystrons/modulators Additional Booster rf cavities –RFQ, dampers, collimators/absorbers To maintain activation at current levels Execute over 2011 – /21/2014S. Holmes | Neutrino Summit4

Strategy for the next ~10 years Proton Improvement Plan-II (PIP-II) The goal is to increase the beam power delivered from the Main Injector by an additional 50% and to provide increased beam power to the 8 GeV program, while providing a platform for the future Strategy –Increase the Booster per pulse intensity by 50% Requires increase in injection energy to ~800 MeV –Modest modifications to Booster/Recycler/MI To accommodate higher intensities and higher Booster injection energy Design Criteria –Deliver 1.2 MW of beam power at 120 GeV, with power approaching 1 MW at energies as low as 60 GeV, at the start of LBNF operations –Support the current 8 GeV program, including Mu2e, g-2, and the suite of short-baseline neutrino experiments –Provide upgrade path for Mu2e –Provide a platform for extension of beam power to LBNF to >2 MW –Provide a platform for extension of capability to high duty factor/higher beam power operations –At an affordable cost to DOE Execute over 2015 – 2023 At the completion of PIP-II the existing 400 MeV linac will be removed from service 6/21/2014S. Holmes | Neutrino Summit5

PIP-II We believe the most cost-effective means of achieving these goals is via an 800 MeV superconducting pulsed linac, extendible to support >2 MW operations to LBNF and upgradable to continuous wave (CW) operations –Builds on significant existing infrastructure –Capitalizes on major investment in superconducting rf technologies –Eliminates significant operational risks inherent in existing linac –Siting consistent with eventual replacement of the Booster as the source of protons for injection into Main Injector Whitepaper available at projectx-docdb.fnal.gov/cgi-bin/ShowDocument?docid=1232 6/21/2014S. Holmes | Neutrino Summit6

PIP-II Site Layout (provisional) 6/21/2014S. Holmes | Neutrino Summit7

PIP-II Performance Goals Performance ParameterPIPPIP-II Linac Beam Energy400800MeV Linac Beam Current252mA Linac Beam Pulse Length msec Linac Pulse Repetition Rate15 Hz Linac Beam Power to Booster413kW Linac Beam Power Capability Duty Factor)4~200kW Mu2e Upgrade Potential (800 MeV)NA>100kW Booster Protons per Pulse4.2× ×10 12 Booster Pulse Repetition Rate15 Hz Booster Beam 8 GeV80120kW Beam Power to 8 GeV Program (max)3240kW Main Injector Protons per Pulse4.9× ×10 13 Main Injector Cycle 120 GeV sec LBNF Beam 120 GeV*0.71.2MW LBNF Upgrade GeVNA>2MW 6/21/2014S. Holmes | Neutrino Summit8 *LBNF beam power can be maintained to ~80 GeV, then scales with energy

Proton Economics and Power Scaling 6/21/2014S. Holmes | Neutrino Summit9

PIP-II Linac Technology Map 6/21/2014S. Holmes | Neutrino Summit10 SectionFreqEnergy (MeV)Cav/mag/CMType RFQ HWR (  opt =0.11) /8/1HWR, solenoid SSR1 (  opt =0.22) /8/ 2SSR, solenoid SSR2 (  opt =0.51) /21/7SSR, solenoid LB 650 (  G =0.61) /20/55-cell elliptical, doublet HB 650 (  G =0.9) /10/45-cell elliptical, doublet PXIE  =0.11  =0.22  =0.51  =0.61  = MHz MeV 650 MHz MeV SC MHz MeV LEBTRFQMEBT RT IS

PIP-II R&D Strategy Goal is to mitigate risk: Technical/cost/schedule Technical Risks –Front End (PXIE) Complete systems test: Ion Source through SSR1 (25 MeV) –Operations of (high Q 0 ) superconducting linac in pulsed mode Primary issue is resonance control in cavities Generally applicable to next generation SC linacs Task force defining options Options evaluated at PXIE Cost Risks –Superconducting RF Cavities, cryomodules, RF sources represent 46% of construction costs Goal: Be prepared for a construction start in /21/2014S. Holmes | Neutrino Summit 11

PXIE 6/11/2014S. Holmes | PIP-II12 RFQ MEBT HWRSSR1 HEBT LEBT Collaborators ANL: HWR LBNL:LEBT, RFQ SNS: LEBT BARC: MEBT, SSR1 30 keV 2.1 MeV 10 MeV25 MeV PXIE will address the address/measure the following: –LEBT pre-chopping –Vacuum management in the LEBT/RFQ region –Validation of chopper performance –Bunch extinction –MEBT beam absorber –MEBT vacuum management –Operation of HWR in close proximity to 10 kW absorber –Operation of SSR with beam, including resonance control –Emittance preservation and beam halo formation through the front end 40 m, ~25 MeV We are here

SRF R&D 6/21/2014S. Holmes | Neutrino Summit13 HWR SSR1 SSR2 LB650 HB650

PIP-II Status and Strategy PIP-II is in the development phase and is not yet recognized as a formal DOE project –However, PIP-II has received very strong support from P5, DOE/OHEP, and the Fermilab director  Expect formalization of project status (CD-0) in the next year, with a ~5-year construction period, starting in the current decade Goals for FY2105 –Release PIP-II Reference Design Report –Update current cost estimate as necessary –Start developing a resource loaded schedule –Receive RFQ (from LBNL) and initiate commissioning at PXIE –Keep HWR and SSR1 fabrication on schedule –Develop deliverables strategy with India (and Europe) –Support DOE/OHEP in development of Mission Needs Statement –Establish PIP-II Office S. Holmes | Neutrino Summit146/21/2014

GeV Require 1.5×10 14 particles from Main Injector every GeV –Every GeV  2.4 MW Slip-stacking is not an option at these intensities –Need to box-car stack 6 ×2.5E13 protons in less than 0.6 sec  >10 Hz rep-rate –Or inject a long (linac) pulse directly into Main Injector –Strategy TBD S. Holmes | Neutrino Summit 156/21/2014

GeV S. Holmes | Neutrino Summit 166/21/2014

Possible Parameters for post-PIP-II Complex S. Holmes | Neutrino Summit 17 Linac or RCS Particle TypeH - or p Beam Kinetic Energy8.0GeV Pulse rate20Hz Protons per pulse2.5  Pulses to Main Injector6 Beam 8 GeV640kW Beam Power for 8 GeV Program*360/480kW Main Injector/Recycler Beam Kinetic Energy (maximum)60/120GeV Cycle time0.7/1.2sec Particles per cycle1.5  Beam Power at GeV2.1/2.4MW *For MI operations at 60/120 GeV 6/21/2014

Possible Parameters for post-PIP-II Complex S. Holmes | Neutrino Summit 186/21/2014

PIP-II Collaboration Collaboration MOUs for the RD&D phase (through CD-2) : NationalIIFC ANLORNL/SNS BARC/Mumbai BNLPNNL IUAC/Delhi CornellUTennRRCAT/Indore FermilabTJNAFVECC/Kolkata LBNLSLAC MSUILC/ART NCSU Ongoing contacts with CERN (SPL), RAL/FETS (UK), ESS (Sweden), RISP (Korea), China/ADS Annual Collaboration Meeting (June 3-4 at Fermilab) 6/21/2014S. Holmes | Neutrino Summit19

Indian Institutions and Fermilab Collaboration Significant R&D collaboration for >5 years –SC accelerating structures –RF sources –Instrumentation –Magnets Discussions at DOE-DAE level on potential Indian in-kind contributions to construction phase 6/21/2014S. Holmes | Neutrino Summit20

Summary The Fermilab accelerator complex can be upgraded to establish a world- leading facility for particle physics research based on intense beams –LBNF >1 MW at startup –8 GeV program >40 kW coincident with LBNF The Proton Improvement Plan-II (PIP-II) is a complete, integrated, cost effective concept, that meets these goals, while –leveraging U.S. superconducting rf investment, –attracting international partners, –providing a platform for the long-term future PIP-II retains flexibility to eventually realize the full potential of the Fermilab complex –LBNF >2 MW –Mu2e sensitivity x10 –8 GeV program at several×100 kW We have received a positive recommendation from P5 and are working with Fermilab and OHEP management to move forward toward a construction start in the current decade. 6/21/2014S. Holmes | Neutrino Summit21