Engineering Economics II Choices Between Alternatives

Slides:



Advertisements
Similar presentations
Chapter 03: Mortgage Loan Foundations: The Time Value of Money
Advertisements

© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Leasing Chapter Twenty-Six.
Some Practice Questions in Engineering Economics
Exam 2 Practice Problems
Financial Management Series Number 3 Using Net Present Value To Evaluate The Value of Money Over Time Alan Probst Local Government Specialist Local Government.
Water Distribution Systems – Part 1
Review for 2nd Nine Weeks Exam
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Lecture No. 58 Chapter 14 Contemporary Engineering Economics Copyright ©
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 11-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Chapter ChEn 4253 Terry A. Ring
Objectives Discuss the role of time value in finance, the use of computational tools, and the basic patterns of cash flow. Understand the concepts of.
A Key to Economic Analysis
Capital Budgeting Decision Rules
1 By Assoc. Prof. Dr. Ahmet ÖZTAŞ Gaziantep University Department of Civil Engineering CHP V-ANNUAL WORTH ANALYSIS CE ECONOMIC DECISION ANALYSIS.
Example of a Decision Tree Problem: The Payoff Table
Rate of Return Multiple Alternatives Lecture slides to accompany
Chapter 16 Homework Day 2.
Decision-Making Steps
Key Concepts and Skills
ENGM 401 & 620 –X1 Fundamentals of Engineering Finance Fall 2010 Lecture 26: Other Analysis Techniques If you work just for money, you'll never make it,
Engineering Economy Practice Problems
Chapter 6 Annual Cash Flow Analysis
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Other Analysis Techniques
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Other Analysis Techniques Dave Ludwick Dept. of Mechanical Engineering University.
Issues in Capital Budgeting II
Lecture No. 47 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Other Analysis Techniques
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Chapter 5 Present Worth Analysis
1 MER 439 Design of Thermal Fluid Systems Engineering Economics 3. Comparing Alternatives Professor Wilk Winter 2007.
COMPARING ALTERNATIVES
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Economic Comparison Fr Clinic II. Overview n Economics and Engineers n Time Value of Money n Different types of Economic Analyses n Comparing our filters.
Chapter 7 Rate of Return Analysis
1 Chapter 6: Annual Cash Flow Analysis Chapter 6: Techniques for Cash Flow Analysis Annual Cash Flow Analysis: Analysis Period = Alternative Lives Analysis.
1 Reviewing… Net Present Worth: Used to select among alternative projects. Used to compare mutually exclusive alternatives. If all expenses and revenues.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 RATE OF RETURN ANALYSIS Course Outline 7.
Investment Decisions and Capital Budgeting
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
8- 1 McGraw Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved Chapter 8 Net Present Value and Other Investment Criteria.
Comparing Projects Using Time Value of Money
Chapter 6 Investment Decision Rules
1 ECGD3110 Systems Engineering & Economy Lecture 7 Other Analysis Methods.
Analysis of Engineering Business Decisions
1 Reviewing Complex Flow Perpetuity If there is a mix of recurring and non-recurring or one-time cash flows that must be capitalized for perpetuity: 1.)
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
1 Reviewing Complex Flow Perpetuity If there is a mix of recurring and non-recurring or one-time cash flows that must be capitalized for perpetuity: 1.)
Techniques for Cash Flow Analysis
ISU CCEE CE 203 Present Worth Analysis (EEA Chap 5)
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Chapter 6: Annual Cash Flow Analysis Engineering Economic Analysis Canadian Edition.
Comparing Economic Alternatives Using time value of money to choose between two or more options.
Estimating Cash Flows and Refinements to Capital Budgeting 11 CHAPTER Copyright © 1999 Addison Wesley Longman.
1 EGGC4214 Systems Engineering & Economy Lecture 7 Other Analysis Methods.
Comparing Mutually Exclusive Alternatives
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 7 Present Worth Analysis
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Construction Engineering 221 Economic Analysis
Engineering Economic Analysis
Engineering Economic Analysis
Engineering Economic Analysis
Engineering Economic Analysis
Engineering Economic Analysis
Marginal Analysis for Optimal Decision Making
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Presentation transcript:

Engineering Economics II Choices Between Alternatives

Basic Concepts The goal of this topic is to investigate few methods to determine the best alternative out of a set of a small set of alternatives. Maximization of net Profit: Assume that the total benefit (TB), the total cost (TC), and the net benefit (NB) are functions of the scale or size of the project (Q). For Example, the TB, TC or NB of a dam is a function of the storage capacity and they are functions of the number of rooms in a motel. We say: TB(Q), TC(Q) or NB(Q). For a single project, our goal could be to maximize TN Maximize TN (Q) = TB (Q) - TC (Q)

Examining Figures 14.1 and 14.2, one can see that max or min NB(Q) occurs when a 45° line is tangent to the TB Vs TC curve. In case of comparing multiple projects, one can compare their net benefit values or use a graph such as Figure 14.3 to select the one with highest net benefit. The remainder of this lecture is a discussion of three methods for choosing between alternatives. The idea is to reduce the benefits and the costs to the same time frame (present or annual) and compare them.

1- Present Worth Analysis First method of choice between alternatives The most commonly used method in Civil and environmental applications. The criterion is still basically to choose the project with max. net benefit but comparing the present worth, we choose the project with max. present worth of net benefit (PWNB). If J is project index, then Maximizej {PWNB = PWBj - PWCj} If PWNB is equal for all the projects, we choose the one with min. present worth of cost (PWC).

Examples 14-1 Analysis period must be the same. Four ways: use the least common multiplier of the useful lifetime of the alternatives. Figure 14-4. use the market value at the end of the analysis period. Figure 14-5 assume a long analysis period and neglect cost or benefit beyond that. use infinite analysis period Examples 14-1

Example An engineering company is considering the purchase of one of two computer systems. System 1 is based on small, decentralized personal computers and has an initial cost of $100,000. These will be replaced in five years at the cost, $100,000. Salvage value is $10,000 at the end of years 5 and 10. It is estimated that the benefits for the first five years will be $30,000 per year, and for the second five years, $60,000 per year.

System 2 is based on larger, more powerful work stations and has an initial cost of $500,000. Replacement will occur at the end of year 10, with a salvage value of $5,000. Benefits are estimated to be $90,000 per year over the ten-year period. The firm uses a 10% interest rate of interest. Which system should the company purchase, if any?

Annual Cash Flow Analysis Criterion is still choosing the project with max net benefit, but considering the equivalent uniform annual of net benefit (EUANB) instead of (PWNB). the goal is: maximizej = {EUANBj = EUABj - EUACj} In certain cases we may consider the EUAC or the EUAB individually. A very flexible method since we are comparing uniform annual quantities.

Analysis period: if multiple of any project’s lifetime, simply compute the uniform annual cash flow for all of them. For example, comparing two projects of 12 and 18 years lifetimes over 36 years, the same pattern of cash flow will be repeated three times for project one and two times for project two. We simply compare the annual cash flow computed over one lifetime for project 1 and one lifetime for project 2. if not a multiple of the lifetime of any of the projects’, the value of the project at the end of the analysis period must be computed and considered when computing the annual cash flow.

Example An engineer must choose between two pumps for use in a water distribution system. Both pump A and pump B will deliver water at an adequate flow rate and pressure head. Data are The interest rate is 7%. Find the best pump.   Pump A Pump B Initial cost ($) 200,000 300,000 Operating cost ($/yr) 30,000 23,000 Lifetime (yrs) 12 Salvage value ($) 10,000 60,000

Example Assume that the lifetime of pump B in the previous xample is 16 years rather than 12. The analysis period is 48 years. Which pump is now the best?

3- Incremental Benefit-Cost Ratio Analysis The criterion is to compare the B-C ratio: B-C ratio = PWB / PWC or = EUAB / EAUC Simply comparing the B-C ratios does not guarantee max. net benefit. Comparing the B-C ratio can be a second step in the analysis. After neglecting the projects with B-C < 1, one of two cases: if all the projects have either the same benefit or cost choose the one with the largest B-C ratio. Otherwise;

conduct incremental B-C analysis: 1. order the alternatives from the lowest to the highest cost and number the projects 1, 2,..., P. 2. compute the ratio: DB / DC for projects 1 and 2. DB / DC = (PWB2 - PWB1) / (PWC2 - PWC1) or = (EUAB2 - EUAB1) / (EUAC2 - EUAC1) if DB / DC ³ 1 select project 2 as best so far. otherwise select project 1 as best so far. In case of a tie, choose the project with a smaller cost which is still project 1 3. compute DB / DC between the best project so far and the next least costly project not yet tested and select a new best. 4. Repeat step 3 until all projects have been tested. The surviving project is the best. Examples 14-5

Example Use the project data from the table below and find the best alternative using incremental B-C ratio analysis.   Project E C A D F B Benefit ($ million) 3.0 11.0 12.0 17.0 19.0 Cost ($million) 5.0 7.0 10.0 16.0 Net benefit ($ million) -2.0 4.0 2.0 0.0