Mike Fisher Royal Liverpool and Broadgreen University Hospitals NHS Trust 1.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Managing Hardware and Software Assets
Advanced Piloting Cruise Plot.
Chapter 8 Software Prototyping.
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Modern Systems Analyst and as a Project Manager
Making the System Operational
NPV.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
Chapter 7 Process Management.
Effectively applying ISO9001:2000 clauses 6 and 7.
Introduction to Foodservice Systems
ABC Technology Project
Strategic Meetings Management 101
Microsoft Access.
Selling Services NetIQ U Sales Enablement Training October 2012 Mary Carty Services Sales Executive
Microsoft Office Illustrated Fundamentals Unit C: Getting Started with Unit C: Getting Started with Microsoft Office 2010 Microsoft Office 2010.
VOORBLAD.
New-Product Development and Product Life-Cycle Strategies
Identifying Our Own Style Extended DISC ® Personal Analysis.
How to commence the IT Modernization Process?
Quality Manual for Interoperability Testing Morten Bruun-Rasmussen Presented by Milan Zoric, ETSI.
Squares and Square Root WALK. Solve each problem REVIEW:
Do you have the Maths Factor?. Maths Can you beat this term’s Maths Challenge?
Achieving a Digital Integrated Care Record Beverley Bryant Director of Strategic Systems and Technology NHS England #healthdata 30 th April 2014.
Lecture 8: Testing, Verification and Validation
1 Career Planning. 2 When you have completed this units you will be able to: identify what is important to you in terms of your career understand what.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
1 The Manager, the Project Organisation Structure, and the Team.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
© Paradigm Publishing Inc Chapter 10 Information Systems.
Week 1.
We will resume in: 25 Minutes.
Maths Counts Insights into Lesson Study
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Chapter 12 Integrating the Organization from End to End – Enterprise Resource Planning.
Database Administration
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Logistics Relationships and Third-Party Logistics
Chapter 11: Systems Development and Procurement Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
How Cells Obtain Energy from Food
CpSc 3220 Designing a Database
Implementing a Clinical Terminology David Crook Subset Development Project Manager SNOMED in Structured electronic Records Programme NHS Connecting for.
Benefits of Open Source Software DR PHIL KOCZAN. About me. GP in Waltham Forest for 20 years Long standing interest in Health Informatics Chief Clinical.
Unit 8.2: Effective Implementation Planning HIT Implementation Planning for Quality and Safety Component 12/Unit 81 Health IT Workforce Curriculum Version.
Presentation transcript:

Mike Fisher Royal Liverpool and Broadgreen University Hospitals NHS Trust 1

2 * Critical factors for success * Why an EPR at all * The Portal approach to EPR * Strengths and Weaknesses

3 The primary driver for whatever approach is chosen to create the technology stack must be clinician ownership and buy-in. If the doctors and nurses won’t use it then it doesn’t matter what technical functionality and capability has been introduced.” SAFER HOSPITALS, SAFER WARDS: ACHIEVING AN INTEGRATED DIGITAL CARE RECORD, NHS England 2013 If the doctors and nurses won’t use it then it doesn’t matter what technical functionality and capability has been introduced.”

4

5

6

7

8

9

10

11

12

13

14 * “Best of Breed” approach using the investment and experience in existing systems * Launch of Underlying systems from a button bar when an action is needed * Held together by a clinical portal, to provide integration and patient context

15

16

17

18

19

20 (Perceived advantages are show in black, disadvantages in red) Portal ApproachIntegrated Approach Deployment Readily supports incremental addition of functions. More suited to “big-bang” deployment Takes much longer to implement and results in a mixed system of electronic and paper for longer Produces a completely or largely electronic system quite rapidly Cost savings take longer to be realised. But upfront costs tend to be lower. High upfront costs. More rapid cost benefit realisation. Business change Incremental approach leads to more gradual impact on business as usual and lower risk of complete failure. Pain is over more quickly and the rapid pace of change may focus the organisation more on getting the project done Ability to leverage existing trusted and accepted systems by integrating these into the portal. Necessity for “rip and replace” of all known and existing systems

21 Clinician Acceptance Ability to integrate familiar systems that clinicians are happy using. Entirely new system to be learned. Major training issues. Inconsistent design and slower performance in moving from one system to another Consistent look and better performance, at least potentially Flexibility Potentially easier to introduce and new function into the system by adding an outside module Addition of new functionality requires new development by the company with all the associated time and cost Adding new module requires on- going integration work to ensure that data silos are not created within the new module An integrated system will have a single underlying database, usually removing issues of compatibility, sharing of data between different modules and consistency of database structures

22 Managability Requires on-going management of all the components, particularly upgrades to ensure no loss of compatibility with the portal Much more straightforward to manage. Upgrades may be more cost effective, as only the individual components need to be upgraded, BUT overall costs could be higher due to having to maintain individual contracts and licenses for all of the component applications as well as the portal itself. Additional Functions Not currently supported by the portal, but could in principal be added on, however this would require substantial development to the data warehouse before this would be possible. Very dependent on the system selected. None (to my knowledge) support the required UK audit data sets. Functionality to support research tends to be very limited. Decision support tends to limited to prescribing on most systems. If data warehouse issues could be solved, would allow extensive in-house queries and business intelligence tools without the necessity to involve outside companies. Some systems do offer decision support and clinical pathways – usually the very expensive ones. Interoperability Interoperability is an intrinsic part of a portal system and thus is built into the architecture from the outset. Varies substantially from system to system, but in most cases is limited and making the system interoperable with third party applications is expensive and in many cases may be actively obstructed by the vendor who has an interest in tying customers into their products.

23 InteroperabilityInteroperability is an intrinsic part of a portal system and thus is built into the architecture from the outset. Varies substantially from system to system, but in most cases is limited and making the system interoperable with third party applications is expensive and in many cases may be actively obstructed by the vendor who has an interest in tying customers into their products.

24 * Clinical Engagement First * Clinicians means more than consultants * Consider what you have already * Does it work and is it liked * Have you got the board behind you

Questions? 25