Regulatory Lessons Learned Drills, Plans, Training and Response

Slides:



Advertisements
Similar presentations
SPCC PLAN OVERVIEW - SLIDE 1 OF 45 © Copyright SafetyInstruction 2008 SAFETY TRAINING CORPORATE SAFETY TRAINING © Copyright SafeyInstruction 2008 EPA 40.
Advertisements

COMPANY MAINTENANCE MANUAL
The Oil Pollution Act of 1990 (OPA)
Oil Pollution Act of 1990 (OPA) By: Casey Marshall Period 4 -On March 24, 1989, shortly after midnight, the oil tanker Exxon Valdez struck Bligh Reef in.
By: Chad Thurston P. 5. The oil pollution act of 1990 was set into law in august It established provisions that expand the federal governments ability.
40 CFR 300. Overview of the NCP Roles and Responsibilities National Response Priorities General Pattern of Response Relationship with the Area Contingency.
FAA Office of Airports Airport Fuel Storage and Handling
© 2014 HWCG LLC SCAA Annual Meeting 1 HWCG HWCG Mutual Aid.
Oil Pollution act Was a response to the Exxon Valdez Incident
WMD Crime Scene Management
GCREAG Regulatory Update March 2014 Jodie Connor J. Connor Consulting, Inc.
Resource Conservation and Recovery Act Authorizes EPA to identify hazardous wastes and regulate their generation, transportation, treatment, storage and.
Subpart S - SEMS September 11, 2012 Prepared by: BSEE, Office of Safety Management Author: Jason Mathews.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Spill Response Plans – Why Are They Developed? Alan K. Mayberry.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS.
GCREAG Regulatory Update January, 2014 Lincoln Stroh J. Connor Consulting, Inc.
IS 700.a NIMS An Introduction. The NIMS Mandate HSPD-5 requires all Federal departments and agencies to: Adopt and use NIMS in incident management programs.
Conversation on the Chemical Facility Anti-Terrorism Standards (CFATS) and Critical Infrastructure Protection Chemical-Terrorism Vulnerability Information.
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
Overview of Regulated Garbage
Operations Section.
Spill Prevention and Control Regulatory Requirements Hazardous Waste Operations and Emergency Response (HAZWOPER) –29 CFR –Covers spill response.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Deepwater Horizon Oil Spill
What Is It And How Will We Measure It?
Salvage and Marine Firefighting & CAPS/Dispersant Regulations: Vessel Response Plans for Oil 33 CFR Part 155.
EPR-Public Communications L-05
Office of Renewable Energy Programs NAC-CESU Annual Meeting June 12, 2013 Mary C. Boatman, Ph.D. Environmental Studies Chief.
A PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES (NCOP) 24 OCTOBER 2007 BY MPATLISENG RAMAEMA CHIEF DIRECTOR: MARITIME TRANSPORT REGULATION DEPARTMENT.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Spill Prevention and Control.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Liquid Pipeline Advisory Committee Meeting Arlington,
Title? 1. 2 National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling Report to the President
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
1 SPCC REGULATIONS Updating EPA’s Spill, Prevention, Control, and Countermeasure Regulations August 6, 2008 Air & Waste Management Association Andrew Covington,
Minerals Management Service Pipeline and Natural Disasters- Are we Prepared? Restoring Trust in Pipeline Safety A Conference for all Stakeholders November.
Delivering Legal Services Executing the Mission Delivering Legal Services Executing the Mission Tulane Admiralty Law Institute March 11 – 13, 2015 New.
By: Grant Hutton The law stated that companies must have a "plan to prevent spills that may occur" and have a "detailed containment and cleanup plan" for.
Some Thoughts On Implementing The IOA Guidelines Within An OPA 90 Framework Greg Buie, National Pollution Funds Center Post- IOSC Ad Hoc IOA Meeting May.
The Oil Pollution Act of 1990 By David Balch. Signed into law in August in response to Exxon Valdez incident. Designed to improve nations ability.
MARILYN HEIMAN, US ARCTIC PROGRAM DIRECTOR. Exxon Valdez Tanker Spill – March
Oil Pollution Act By D.J. Magee Period 3. Summary The Oil Pollution Act was signed into law by the U.S. legislature in August, The bill was passed.
OIL POLLUTION ACT DRAFT YEAR: 1990 TSUKIKO JERGER.
Government-Initiated Unannounced Exercises (GIUE)
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Authority: Who Does What?. Los Angeles – Long Beach Area Contingency Plan Marine Firefighting and Salvage Plan.
1 City of Shelby Environmental Management System -QUALITY ALWAYS- IT’S ABOUT THE PEOPLE Presented by: Cynthia I.Walters Presented by: Cynthia I.Walters.
Oil Pollution Act (OPA) Signed into law August 1990 This act amends the Clean Water Act (1972) This act is National Law Matt Vedrani.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
Amended in 1990 National. Overview Of OPA OPA was signed in response to The Oil Pollution Act (OPA) was signed into law in August 1990, largely in response.
NH Department of Education Developing the School Improvement Plan Required by NH RSA 193-H and Federal Public Law for Schools in Need of Improvement.
The Oil Pollution Act of 1990 Year Drafted: 1989 Year Amended: 1990 National Act Lawrence Jiang Period 1.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
The mission of the Oil Spill Task Force is to strengthen state and Provincial abilities to prevent, prepare for, and respond to oil spills.
CM&C Inspections The Pre-Approval Inspection (PAI) in the US 27 May 2010.
OPRC Level 3 Spill Management Roles & Responsibilities.
Recent Legal and Regulatory Developments Impacting Offshore Drilling Operations Michael D. Farber R. Scott Nuzum October 20, 2016.
Marine safety Unit Savannah
USCG Roles & Responsibilities During a Ship Fire
Offshore Oil and Gas Environmental Issues
Oil Pollution Act of 1990 (OPA)
The Oil Pollution Act of 1990 (OPA)
The Oil Pollution Act of 1990
OIL POLLUTION ACT.
Oil Pollution Act of 1990 (USA)
The Oil Pollution Act of 1990 (OPA)
The Oil Pollution Act (1990)
Oil Pollution Act of 1990 Jt Esquibel Period 1.
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

Regulatory Lessons Learned Drills, Plans, Training and Response Presented By Trey Phillips J. Connor Consulting, Inc. www.jccteam.com 1

Beginnings Rivers and Harbors Act 1899 2

Regulatory History Clean Water Act of 1972 – established a basic system for the cleanup of oil spills Required operators to own or have access to spill response equipment CGA formed 1978 Amendments to the Outer Continental Shelf Lands Acts (OCSLA) established liability for cleanup costs and damages 3

Regulatory History Oil Pollution Act of 1990 (OPA 90) Catalyzed by the grounding of the Exxon Valdez, signed into law by President Bush on August 18, 1990 The most comprehensive oil spill liability and prevention regime enacted by any country in the world Primary aspects: Prevention Planning Liability Response 4

Regulatory History Prevention OPA 90 Requirement for double hulled vessels by 2015 SKS Satilla Off Houston, 4 March, 09 40,000,000 Gallons Crude Struck Ensco 74 130 ft. Gash, Outer Hull No Spill It worked!! 5

Regulatory History Prevention DBL 152, The largest spill you’ve never heard of

Various “Experts” said, the 441 foot barge “Will not turn turtle!”

Oops!!

Spill recovery techniques!? How much lost? 1.3 Million Gallons?? Where is it??

OPA Jurisdiction for Prevention and Planning USCG for vessels & marine-transportation related facilities EPA for onshore oil storage facilities DOT-PHMSA for oil transmission pipelines BSEE for offshore facilities 10

Concept of “Responsible Party” RP of offshore facility = the lessee or permittee of the area in which the facility is located OPA imposes strict liability for oils spills  liability without fault Therefore, the RP is the owner or operator of the facility, regardless of who was at fault for the spill 11

Oil Spill Response Plan Requirements for the OCS Preparedness Oil Spill Response Plan Requirements for the OCS 12

BSEE Plan Requirements 30 CFR Part 254 requires operators of all oil handling, storage, or transportation facilities located “seaward of the coast line” to submit an oil spill response plan to BSEE This includes all facilities in state waters that are “outside of the barrier islands” 13

Plan Submission All facilities must be covered under an approved response plan. Plans are approved for a period of two years. Plans must be kept up-to-date; operations must be in compliance with the Plan. Significant modifications must be submitted to BSEE within 15 days: Reductions in response capability Significant increase to any worst case discharge scenario (NTL 2013-N02) Changes to QI/Spill Management Team 14

NTL 2013-N02 Instead of comparing WCD volumes, BSEE is now shifting the focus of a WCD comparison to spill response equipment. If proposed WCD requires more equipment, then you must revise your OSRP and submit to BSEE within 15 days. For drilling WCD, the 15 day deadline begins when you submit an APD.

OSRP Regulations - 30 CFR 254 254.30 When must I revise my response plan? You must submit revision to your plan for approval within 15 days whenever: A significant change occurs in the worst case discharge scenario or in the type of oil being handled, stored, or transported at the facility.

Implications The NTL was issued by BSEE and it affects Oil Spill Response Plans. The NTL has no bearing on BOEM or EP/DOCD process. BSEE and BOEM are still in discussions regarding OSRP approval’s role in EP/DOCD review/approval. They have not yet come to an agreement.

BSEE Definition of a Qualified Individual An English-speaking representative of an owner or operator: located in the United States available on a 24-hour basis with full authority to: obligate funds for surface and subsea operations carry out removal actions communicate with the appropriate Federal officials and the spill response organization 18

Training, Drills & BSEE Unannounced Drill Program Evolution Training, Drills & BSEE Unannounced Drill Program 19

Evolution of Exercises Exercises Mid 90’s Operator filled most or all boxes on Organization chart Training once a year left most unsure of how to perform their assigned duties Started the transition to Contract Spill Management Teams Exercises in Y2k Operator moved to positions on the Organization chart that made sense to their daily expertise Qualified Individual Source Control HR/PIO/Legal Contract SMT’s found their way into most operators Spill Plans Training was dwindling down to the QI for operators Exercises Post-Deepwater Horizon Healthy combination of Responsible Party and contract SMT on Org. Chart All personnel listed on the Org. Chart receive annual classroom training , covering components outlined by BSEE Deepwater source control has outgrown the traditional organization 20

Training Requirements Today and Beyond Spill Management Team and QI must receive annual classroom training SMT members should “Know Their Job” Source Control Section Chief should have Source Control Training. (At this time, BSEE accepts exercises as training) No other guidance given by BSEE regarding types of training for specific team members. 21

BSEE Oil Spill Program Initiatives Inspects oil spill response equipment under contract Conducts unannounced oil spill drills: Develops the spill scenario Establishes an observation plan Initiates exercise with Operator, contract SMT or offshore facility Facilitates and evaluates the exercise Reviews drill documentation (to be submitted w/n 15 business days) Prepares and disseminates a technical analysis of the drill and determines success on a pass/fail basis 22

BSEE Unannounced Exercise Hints Be aggressive, notify responders early Know how to activate your subsea contractor Have an orderly sign-in system and formatted roster Follow the BSEE instructions to the letter when preparing documentation All team members must keep a log of their major actions during the event—recommend use of ICS 214 A Put your name and SMT position at the top of each page If you are named in the OSRP in any position, ensure you have had SMT training in the last year Most INCs are for documentation Problems with past drills or district offices and bad safety record can get you picked.

Recent Lessons from Exercises and Incidents BSEE: Is extremely involved working blowout scenarios Research all possible avenues to solve a well control issue Be ready to provide detailed safety plans for every source control and debris removal operation Communications Ensure good communications between Source Control and Unified Command Request USCG and BSEE liaison at your Source Control Command Post

Recent Lessons from Exercises and Incidents Documentation & Control Ensure contractors and company personnel turn in documents An Incident Action Plan (IAP) will likely be requested if extended well control operations are expected (2-3 days)

Recent Lessons from Exercises and Incidents Training and Records: Initiate organization of training records of contractors and company personnel Initiate organization of all BOP records from date of manufacture through latest testing prior to deployment Source Control Operations: Coordinate all Well Control actions with CG and BSEE Incident Management Leave no doubt that you are in control and are working cooperatively with the USCG and BSEE Get PIO help ASAP

QUESTIONS???? 27