OPTIMA OPTIMA Optimisation for Sustainable Water Resources Management The Case of the Gediz River in Turkey 18-19 May 2006 Gumpoldskirchen.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AP STUDY SESSION 2.
1
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Copyright © 2013 Elsevier Inc. All rights reserved.
David Burdett May 11, 2004 Package Binding for WS CDL.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
The 5S numbers game..
1 A B C
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
The basics for simulations
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
MCQ Chapter 07.
K ONTRAK PERKULIAHAN I Made Gatot K, ST. MT 1. PENILAIAN Kehadiran min 75 % : 5 % Tugas: 20 % Diskusi / Presentasi: 20 % UTS: 25 % UAS: 30 % TOTAL: 100%
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 22 November 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
1 TV Viewing Trends Rivière-du-Loup EM - Diary Updated Spring 2014.
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Artificial Intelligence
When you see… Find the zeros You think….
Before Between After.
Subtraction: Adding UP
Bell Busters! Unit 1 #1-61. Purposes of Government 1. Purposes of government 2. Preamble to the Constitution 3. Domestic tranquility 4. Common defense.
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Static Equilibrium; Elasticity and Fracture
Essential Cell Biology
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
PSSA Preparation.
OPTIMA OPTIMA Optimisation for Sustainable Water Resources Management Turkish Case Study: Gediz River December 2006 Milano.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
OPTIMA OPTIMA Optimisation for Sustainable Water Resources Management The Case of the Gediz River in Turkey 28–30 October 2004 Senglea, MALTA.
OPTIMA Optimisation for Sustainable Water Resources Management
Presentation transcript:

OPTIMA OPTIMA Optimisation for Sustainable Water Resources Management The Case of the Gediz River in Turkey May 2006 Gumpoldskirchen

OPTIMA 2 Gediz Basin Izmir Istanbul Population: Extent: km 2 Current water demand Agriculture 39 mm (695 MCM) Industry 3 mm (54 MCM) Environ.Wetl and 0.2 mm (3.6 MCM) Domestic 7.4 mm (133 MCM Current water supply Surface 52 mm (940 MCM) Ground 9 mm (160 MCM) Treated Not Available Rainfall 700 mm Water Supply: 1100 MCM 647 m 3 per capita Water Demand: 886 MCM 521 m 3 per capita

OPTIMA 3 LAKES, RESERVOIRS and WEIRS

OPTIMA 4 Demographic Change Basin Population +1.5 % /year [ (1970) (2000)] Urban population +2% /year Rural population -0.7% /year INTERNAL MIGRATION RURAL TO URBAN: RAPID URBANIZATION

OPTIMA 5 Land Use Change UUrban Areas+2% /year IIndustrial Areas+10% /year 335% increase in urban and industrial areas in 13 YEARS! INCREASING WATER DEMAND: COMPETITION AMONG USERS Industrial Areas Kemalpasa Manisa Menemen

OPTIMA 6 KEY ISSUES PHYSICAL CONDITIONS: - Watershed Degradation - Water Scarcity - Droughts WATER MANAGEMENT: - Education and Awareness - Institutional Framework: - Institutional Responsibilities - Active Participation

OPTIMA 7 WATER DEMAND: - Agriculture - Surface Water Demands - Groundwater Demands - Industry: - Surface Water Pollution by Industry WATER SUPPLY: - Quality: - Surface Water Quality - Groundwater Quality - Infrastructures: - Sanitation: Sewers and Treatment KEY ISSUES

OPTIMA 8  Domestic demand0.15 mm/year, 2%  Industrial demand0.3 mm/year, 10% KEY ISSUES Supply (61mm) Demand (49.6mm)

OPTIMA 9 Discharges Water Quality  60% ofSurface Water  30%ofGround Water “POLLUTED, USE WITH CARE!!” W. Q. CLASS IV (acc. Turkish W.Q.C. Standards)

OPTIMA 10

OPTIMA 11 GIS DATA (WP05) (Composite, LANDSAT)

OPTIMA 12 GIS DATA (WP05) (DEM, SRTM)

OPTIMA 13 GIS DATA (WP05) (River Network)

OPTIMA 14 GIS DATA (WP05) (Settlements)

OPTIMA 15 GIS DATA (WP05) (Road Network)

OPTIMA 16 GIS DATA (WP05) (Flow Stations)

OPTIMA 17 GIS DATA (WP05) (Meteo. Stations)

OPTIMA 18 GIS DATA (WP05) (Landuse)

OPTIMA 19 Topological View of the Recent Baseline Gediz Scenario Demirkopru Buldan Marmara Lake Alasehir Irrig. Ahmetli Irrig. Adala Irrig. Menemen Irrig. Wetland Nif Tributary Kumcay Tributary Gordes Tributary Afsar Bay of Izmir

OPTIMA 20 RESERVOIRS AFSAR BULDAN MARMARA DEMIRKOPRU Bay of Izmir YIGITLER? GORDES?

OPTIMA 21 River Basin Objects Reservoirs: 1) Demirkopru: supplies irrigation water, flood prevention, energy production during the irrigation season. 2) Afsar: provides irrigation water to Alasehir lowlands. 3) Buldan: provides irrigation water to Alasehir lowlands. 4) Marmara Lake 5) Gordes (under construction): supplies domestic water for the city of Izmir in addition to providing irrigation water within the basin. 6) Yigitler (under construction): supplies industrial water for the industrial district of Kemalpasa. WATERWARE STUDIES

OPTIMA 22 Alasehir Irrig. Ahmetli Irrig. Adala Irrig. Menemen Irrig. Wetland Bay of Izmir Kemalpasa Ind. Zone Manisa Org. Ind. Zone Menemen Leather Ind. Comlekci Adala Ahmetli Emiralem IRRIG. DISTRICTS,WEIRS,IND. ZONES and WETLAND

OPTIMA 23 River Basin Objects Irrigation Districts : 1) Adala Left Bank 2) Adala Right Bank 3) Ahmetli Left Bank 4) Ahmetli Right Bank 5) Menemen Left Bank 6) Menemen Right Bank 7) Sarigol 8) Alasehir Diversions: 1)Adala Weir 2)Ahmetli Weir 3)Emiralem Weir 4)Buldan Weir 5)Comlekci Weir Industrial Districts: 1)Manisa Ind. Zone 2)Kemalpasa Ind. Zone 3)Memenen Leather Ind. Wetland: 1)Izmir Bird Paradise

OPTIMA 24 Irrigation District Area (ha) (min-max) Cotton (%) Maize (%) Grape (%) Vegetables (%) Fruits (%) Cereals (%) Adala Left Bank Irr Adala Right Bank Irr Ahmetli Left Bank Irr Ahmetli Right Bank Irr Menemen Left Bank Irr Menemen Right Bank Irr Sarigol Irr Alasehir Irr

OPTIMA 25 Crop Yield (kg/ha)Average Price (EU/kg) Cotton Grape Maize Vegetables Cereals Fruits?? Water Supply Ratio (%)Decrease in Yield (%) Yields and Average Farmer’s Prices of Crops

OPTIMA 26 District BOD loads (kg/day) Industrial Kemalpasa Industrial Zone4255 Manisa Org. Ind. Zone8667 Menemen Leather Industrial4833 Daily BOD Loads of Industrial Discharges Source: Nen Eng.&Cons., December 2001

OPTIMA 27 SUBCATCHMENTS and SETTLEMENTS Turgutlu Alasehir Salihli Golmarmara Saruhanli Menemen Kemalpasa Akhisar Ahmetli Bay of Izmir Buldan AfsarDeliinis Gordes Medar Yigitler Nif

OPTIMA 28 River Basin Objects Settlements : 1) Manisa (Gov. Centre) 2) Akhisar 3) Salihli 4) Turgutlu 5) Kemalpasa 6) Menemen 7) Saruhanli 8) Alasehir 9) Izmir 10) Golmarmara 11) Ahmetli Subcatchments: 1)Demirkopru Upstream 2)Buldan Upstream 3)Afsar Upstream 4)Medar 5)Nif 6)Gordes 7)Yigitler Aquifers: 1)Salihli-Turgutlu 2)Menemen 3)Sarikiz 4)Alasehir

OPTIMA 29 Name of the Settlement1990 Pop.2000 Pop.qHY, l/ca/day **m3/daym3/s Akhisar Salihli Turgutlu Manisa, Center Kemalpasa Menemen Saruhanli Golmarmara Alasehir Ahmetli PopulationqHY, l/ca/day > ** Values from Bank of Provinces Domestic Demand of Settlements

OPTIMA 30 Municipality BOD loads (kg/day) Salihli2772 Menemen1115 Golmarmara379 Turgutlu3100 Alasehir1093 Saruhanli2247 Akhisar1866 Ahmetli1321 Manisa2222 Kemalpasa712 BOD Loads of Domestic Returns of Settlements Source: Nen Eng.&Cons., December 2001

OPTIMA 31 The aquifers identified in WaterWare (WRM) and their parameters. The Name of the Aquifer ParameterAlasehirMenemen Salihli- Turgutlu Sarikiz Area (km2) Average depth (m) Porosity (%)15 Percolation loss coefficient 0000 Deg. day coefficient1e-05 Recharge coefficient

OPTIMA 32 WaterWare Modeling Studies Water Budget

OPTIMA 33

OPTIMA 34

OPTIMA 35

OPTIMA 36

OPTIMA 37

OPTIMA 38

OPTIMA 39 RESERVOIRS INVESTMENTS AFSAR BULDAN MARMARA DEMIRKOPRU Bay of Izmir YIGITLER? GORDES?

OPTIMA 40 WaterWare Modeling Studies Water Quality

OPTIMA 41

OPTIMA 42

OPTIMA 43 Kemalpasa Ind.and Dom. Discharges

OPTIMA 44 Pollution Sources emphasized in Stakeholder meeting: Kemalpasa Industrial District Kemalpasa Industrial District Kemalpasa Municipality’s domestic discharge Kemalpasa Municipality’s domestic discharge Salihli, Akhisar, Turgutlu, Ahmetli Municipalities have treatment plants but they are not operated properly… Salihli, Akhisar, Turgutlu, Ahmetli Municipalities have treatment plants but they are not operated properly…

OPTIMA 45 Economic Data Compilation

OPTIMA 46 Irrigation Districts Capital Cost (€/yearly) Fixed O/M Costs (€/yearly) Fixed O/M Costs (€/monthly) Use Benefit (€/m3) Shortfall Cost (€/m3) Adala Left Bank Irr. ?? Adala Right Bank Irr. ?? Ahmetli Left Bank Irr. ?? Ahmetli Right Bank Irr. ?? Menemen Left Bank Irr. ?? Menemen Right Bank Irr. ?? Sarigol Irr. ?? Alasehir Irr. ?? *** The operational costs of diversion structures are considered in fixed o/m costs BASIC ECO-DATA OF IRRIGATION DISTRICTS

OPTIMA 47 BASIC ECO-DATA OF IRRIGATION DISTRICTS Acatay, 2001; E. Hansen et. al.

OPTIMA 48 BASIC ECO-DATA OF IRRIGATION DISTRICTS Supply/Demand (daily) Yield decrease Average Yield Decrease Water Supply Ratio (%)Decrease in Yield (%) Source: Akinci, 2004; Min. of Aggriculture and Rural Affaires

OPTIMA 49 BASIC ECO-DATA OF IRRIGATION DISTRICTS Calculation of “Use Benefit” and “Shortfall Cost”: Use benefit = Yield (kg/ha) x Market price (€/kg) x Area (ha) / Demand (m 3 ) Shortfall Cost; Expected irrigation income through irrigation (EII)= (Total expected income) x 0.6 (without irrigation crops still yield!, the figure may be argued) The real income increase (RII) = EII x (relative yield reduction due to limited irr.) Shortfall of income = EII – RII Shortfall Cost = (EII – RII) / (Total Demand - Total Supply)

OPTIMA 50 Settlements Capital Cost (€/yearly) Fixed O/M Costs (€/yearly) Fixed O/M Costs (€/monthly) Use Benefit (€/m3) Shortfall Cost (€/m3) Akhisar?? Almost 60% of Collected Fees 1 Salihli??1 Turgutlu??1 Manisa, Center??1.5 Kemalpasa??0.8 Menemen??0.8 Saruhanli??0.4 Golmarmara??0.4 Alasehir??0.6 Ahmetli??0.6 BASIC ECO-DATA OF SETTLEMENTS

OPTIMA 51 RESERVOIRS INVESTMENTS AFSAR BULDAN MARMARA DEMIRKOPRU Bay of Izmir YIGITLER?

OPTIMA 52 COSTS INCOME YIGITLER DAM ANNUAL INV (€/year) O/M (€/year) ELECTRICITY (€/year) Exp. INCOME (€ /year) DAM2,531,851149,975 IRRIGATION1,014,431316,909 1,799,32 6 IND. WATER SUPPLY541,219115,145518,358 24,113,9 63 TREATMENT597,393124,912 RESERVOIRS INVESTMENTS

OPTIMA 53 RESERVOIRS INVESTMENTS AFSAR BULDAN MARMARA DEMIRKOPRU Bay of Izmir GORDES?

OPTIMA 54 RESERVOIRS INVESTMENTS COSTS INCOME GORDES DAM (€/year) ANNUAL INV (€/year) O/M (€/year) ELECTRICITY (€/year) INCOME (€/m 3 ) DAM87,373,043597,450 IRRIGATION7,477,6861,382,716 DOM. WATER SUPPLY7,660,81976,608 1 to 1.5

OPTIMA 55 TREATMENT PLANT INVESTMENTS Treatment plant (s) for KEMALPASA INDUSTRIAL ZONE: Annual Investment Cost (Capital Cost): €/year Fixed O/M Cost : €/year

OPTIMA 56 PRELIMINARY ECONOMIC RESULTS OF 1991 BASELINE SCENARIO

OPTIMA 57 INTRODUCED WATER TECHNOLOGIES TO DB

OPTIMA 58 INTRODUCED WATER TECHNOLOGIES TO DB

OPTIMA 59 INTRODUCED WATER TECHNOLOGIES TO DB

OPTIMA 60 WORKS IN PROGRESS  The O/M data of existing reservoirs have been demanded from DSI,  The income, shortfall and O/M costs for settlements’ water distribution system have been demanded from IZSU,  The results of “Issues Questionaire” analysis are expected from FEEM.

OPTIMA 61 WORKS TO DO  Decide water technologies to be used,  Complete the compilation of missing economic data,  Start with optimization regarding the results of Stakeholders Meeting

OPTIMA 62 THANK YOU!