DAQ/FLES Summary Walter F.J. Müller, GSI, Darmstadt CBM Collaboration Meeting 16 April 2010.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

PGA309 EVM Multi-Cal-Tools-V1.6a User’s Guide
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2003 Chapter 3 Data Transmission.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2003 Chapter 11 Ethernet Evolution: Fast and Gigabit Ethernet.
Processes and Operating Systems
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Create an Application Title 1A - Adult Chapter 3.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Excel Functions. Part 1. Introduction 2 An Excel function is a formula or a procedure that is performed in the Visual Basic environment, outside the.
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
An Application of Linear Programming Lesson 12 The Transportation Model.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
A Hardware Processing Unit For Point Sets S. Heinzle, G. Guennebaud, M. Botsch, M. Gross Graphics Hardware 2008.
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
User Security for e-Post Applications Dr Chandana Gamage University of Moratuwa.

Understanding Data Acquisition System for N- XYTER.
Frank Lemke DPG Frühjahrstagung 2010 Time synchronization and measurements of a hierarchical DAQ network DPG Conference Bonn 2010 Session: HK 70.3 University.
STS Readout chain – Revisited Readout-ASIC to ROC Interconnect Walter F.J. Müller, GSI, Darmstadt CBM Collaboration Meeting 13 th April 2010.
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Presentation transcript:

DAQ/FLES Summary Walter F.J. Müller, GSI, Darmstadt CBM Collaboration Meeting 16 April 2010

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 2 Scope of Summary Joint summary of DAQ aspects of FEE/DAQ Workshop, 22/23 February at GSI DAQ/FLES Working Group this CBM week FEE/DAQ WS DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 3 The CBM Generic Read-out Chain Detector Front-End Board Read-Out Controller Active Buffer Board FEBROC ABB Data Combiner Board DCB First Level Event Selector FLES TNet Data Control Data & Control Sync Data Digitization Custom ASIC FEE  DAQ Interface Local Pre- Processing Buffering System Synchronization DAQ  FLES Interface FPGA Coprocessor Event Selection CPU Farm DAQDetector Sub-SystemFLES

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 4 Mission Statement FEE/DAQ Workshop Focus is on system aspects of the final system Interim solutions, like n-XYTER, should only be covered in a 'lessons learned from' context. FEE/DAQ WS

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 5 Agenda FEE/DAQ Workshop Monday  morning: TOF(PADI/GET4 readout)  afternoon:TRD/MUCH('Gas'-XYTER readout) Tuesday  morning:STS('Si'-XYTER readout)  afternoon:MVD/RICH DAQ/FLES Full program and presentations see FEE/DAQ WS

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 6 FLES

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 7 Options for CBM FLES Location CBM Service Building ~350m linear dist. Distance is preliminary!! 'Green Cube'

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 8 Slide: J. de Cuveland DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 9 Slide: J. de Cuveland DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 10 Slide: J. de Cuveland DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 11 Slide: J. de Cuveland DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 12 Slide: J. de Cuveland DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 13 Slide: J. de Cuveland DAQ/FLES WG

DABCDABC 16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 14 InfiniBand performance tests ( ) Slide: S. Linev DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 15 CBM Radiation Environment

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 16 STS Plane 1 (30cm) – TID FEE Aux no MUCH at FEE: ~200krad/yr at Aux: ~50krad/yr Proviso Proviso: preliminary FLUKA calculations ! FEE/DAQ WS

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 17 STS Plane 8 (100cm) – fast hadron flux FEE with MUCH 2·10 3 h/cm 2 /s 2·10 4 h/cm 2 /s 2·10 5 h/cm 2 /s at FEE: ~10 5 h/cm2/s Proviso Proviso: preliminary FLUKA calculations ! FEE/DAQ WS

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 18 Physical Location View – Feb 22 nd FEBROC/DCS ABBDCB FLES TNet Data Control Data & Control Sync Data Cu optical Data Control STS,.... TOF,...? ROC ECS on/near DetectorCBM Service Bldg.GSI/FAIR IT Bldg. Data ~50m~500m ? FEE/DAQ WS

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 19 Closer look at STS readout

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 20 STS Hit Rates per 128 Channel Chip Hit rate [MHz] Sta 0 Sta 1 Sta 2 Sta 3 Sta 4 Sta 5 Sta 6 Sta 7 Total Total Very few chip in inner region have hit rate > 32 MHz >90% of chips have hit rates in MHz range Hit rate per chip Statistics 25 AGev 10 7 evt/sec FEE/DAQ WS SIM-Data: A. Kotynia

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 21 STS Quadrant 6 cm 5 cm STS-FEBs Is this enough space for: copper links - 10 opto converters - 10 ribbon fiber cables plus other services like - power distribution - control & monitoring -,,,,,,, size of a post card FEE/DAQ WS CAD: S. Belogurov et al

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 22 Compact electro-optics Converts I Optically enabled ASIC Use MT connector: 12 x TX or 12 x RX or 4xTX and 4xRX Optically enabled FPGA Extracted from ReflexPhotonics White Papers and Presentations Claim for 12 channels: 4 cm 2 footprint 3 mm height LightABLE from ReflexPhotonics FEE/DAQ WS

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 23 Some Data on Fiber Ribbon Cable Assume 12 fiber ribbon cable  very compact, 20 mil pitch  cable cross section: 2.3 x 5.1 mm Assume MPO/MPT connector 2.3 mm 5.1 mm Pictures from GORE FEE/DAQ WS

Ulrich Brüning 24 STS Interface Converter Board Proposal for STS interfacing 2m copper twinax x1, x2, x4 or x8 copper => optical on Postcard 12.7cm x 8.9cm Conversion to optical signals with AOCs Does electrical and AOC connector fit on one Postcard ? Connector density analysis AOC connectors twinax connectors twinax connectors Passive Board Postcard miniHT connector Slide: U. Bruening FEE/DAQ WS

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 25 Proviso Proviso: link counts likely to go up to account for more background, overhead, head room,.... All STS data can be transported by ~280 ribbon cables Corresponds to 34 cm 2 cable cross section STS Link & Ribbon Cable Distribution Sta 0 Sta 1 Sta 2 Sta 3 Sta 4 Sta 5 Sta 6 Sta 7 total FEBs links cables/quadrant cables tot FEB&Cable Statistics 25 AGev 10 7 evt/sec 48 bit message FEE/DAQ WS

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 26 Where to locate fast serializers and opto-converters ?

12 th – 16 th April, th CBM Collaboration Meeting 27 Data Aggregation on separate chip - Communication hub Motivation:  Data Aggregation: In most cases 2,4, or 8 CBM-XYTER chips (FEBa2, FEBa4, FEBa8, resp.) can be aggregated to fill a 2.5 Gbps link  Increase the bandwidth available per link  Reduce the number of Optical Links Schemes:  Embedded (aggregation integrated in CBM-XYTER)  Data aggregation and Traffic Management with a separate Communication Controller Asic  Communication ‘hub’  Clock Distribution  Slow control traffic  Data Readout traffic 6 DAQ/FLES WG Slide: P. Banerjee

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 28 All Combined – Detector & Service Bldg. Data Clock & Control CBM Service Bldg. DCB DCS on/near Detector Clock & Sync febhubopto TNet CntlNet Control Data DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 29 STS Quadrant – A possible arrangement 6 cm 5 cm STS-FEBs STS-'hub'STS-'opto' DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 30 DCS DCB DCS DCB DCS Physical Location View – April 13 th FEBABB DCB FLES Data Control Clock & Data & Control Clock & Sync Data STS,.... TOF,...? ROC ECS Cu optical on/near DetectorCBM Service Bldg.'Green Cube' Data ~50m~500m Control 'hub''opto' Data Clock & Control DCB DCS CLOSY DCS TNet CntlNet Clock & Sync Control DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 31 DCS Physical Location View – April 15 th FEBABB DCB FLES Data Control Clock & Data & Control Clock & Sync Data STS,.... TOF,...? ROC ECS Cu optical on/near DetectorCBM Service Bldg.'Green Cube' Data ~50m~500m Data& Control clock 'hub''opto' CLOSY DCS TNet CntlNet Clock & Sync Control DPB? DCS Clock & Data & Control DAQ/FLES WG

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 32 ROC next Gen

33 Basic Components on FPGA Module  Xilinx FPGA (Spartan, Virtex)‏  RAM  Actel Configuration Controller  Flash EEPROM  Voltage Regulators (1.2, 1.5,...) driven by 3.3 V or 5V  RS232 Interface  1 or 2 SFPs  Jitter Cleaner  FMC-HPC (Vita57) connector with (160 or) 400 pins Slide: D. Gottschalk FEE/DAQ WS

34 SysCore 3 Base Board Example  32 RJ45 Connectors with LVDS  48Volt Power Input  Isolated JTAG for High Voltage Applications  External Ref. Clock Inputs (LVDS??)‏  Gigabit Links SFPs or electrically  USB + GBit Ethernet Slide: D. Gottschalk FEE/DAQ WS

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 35 Controls

Burkhard Kolb GSI36 Test beam time example Burkhard Kolb GSI 36 DAQ/FLES WG Slide: B. Kolb

Burkhard Kolb GSI37Burkhard Kolb GSI 37 Requirements DB  In collaboration with PANDA we have set up a database with web access   Register  Then enter requirements:  Process variables  Common hardware  … DAQ/FLES WG Slide: B. Kolb

16 Apr 2010 CBM Collaboration Meeting -- Walter F.J. Müller, GSI 38 The End Thanks for your attention