There’s a Dam There? Using GIS to Re-Inventory Alabama Dams

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
STATISTICS HYPOTHESES TEST (III) Nonparametric Goodness-of-fit (GOF) tests Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering.
UNITED NATIONS Shipment Details Report – January 2006.
Whiteboardmaths.com © 2004 All rights reserved
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
What gas makes up 78% of our atmosphere?
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
1 The Impact of Buy-Down on Sell Up, Unconstraining, and Spiral-Down Edward Kambour, Senior Scientist E. Andrew Boyd, SVP and Senior Scientist Joseph Tama,
A number of very dangerous factors related to buildings, roofs, structures and properties have been identified and warned about.
Solve Multi-step Equations
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Box and Whisker Plots.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Outline Minimum Spanning Tree Maximal Flow Algorithm LP formulation 1.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
GIS Lecture 8 Spatial Data Processing.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Functional Areas & Positions
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 Lab 17-1 ONLINE LESSON. 2 If viewing this lesson in Powerpoint Use down or up arrows to navigate.
GIS Applications in Watershed Analysis …..the watershed unit Dr. Dennis L. Johnson Assistant Professor Michigan Technological University COMET Hydrometeorology.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Physics for Scientists & Engineers, 3rd Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
1 McGill University Department of Civil Engineering and Applied Mechanics Montreal, Quebec, Canada.
CFR 250/590 Introduction to GIS, Autumn 1999 Data Search & Import © Phil Hurvitz, find_data 1  Overview Web search engines NSDI GeoSpatial Data.
Copyright Tim Morris/St Stephen's School
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Presentation transcript:

There’s a Dam There? Using GIS to Re-Inventory Alabama Dams By Jeff Zanotti

Normal Neighborhood in Cullman

Dam Directly Uphill Constructed in 1948; Sportsman Lake Dam

Decatur

Unmarked Dam

Rainsville

Dam Breach Potential Risks Dam Failure Risk: 1] Potential of failure 2] Potential damage Potential of failure Age of dam Construction deficiencies Inadequate maintenance Seismic and weather events Apart from seismic and weather events age is a leading indicator of dam failure.

Recent Regional Failures of Large Dams Big Bay Dam Earthern dam near Purvis, MS March 12, 2004 Destruction: 55 homes and mobile homes were destroyed 104 structures were documented as destroyed or damaged 0 fatalities Failed due to piping Inundated 14.3 miles

Recent Regional Failures of Large Dams Kelly Barnes Dam Earthern embankment dam in Stephens County, GA November 6, 1977 Destruction: 27 homes and mobile homes were destroyed 2 college buildings were destroyed 39 fatalities Dam had been raised many times over the years Weather event exposed a structural weakness and insufficient design Occurred at 1:30 am helping to add to the high fatalities

Dam Safety Programs Association of State Dam Safety Officials (ASDSO) started in 1984 to create a national organization to improve dam safety Alabama is the only state that lacks a dam safety program Having a dam safety program allows a state to have legislative authority to administer dam safety regulatory programs

Safe Dams ADECA’s Office of Water Resources began efforts in 2008 to develop an inventory of dams in Alabama These dams would be classified by their hazard potential Once established the program will help public safety and emergency response operations in the event of a disaster Through federal grants (Dept of Homeland Security: FEMA) were able to bring in AMEC as a contractor to assist

How to Start the Re-Inventory Process What is already inventoried? National Inventory of Dams (NID) Database What are the resources available? GIS Layers What attributes of the dams should be reflected in the inventory? Goal is to classify by potential hazard GIS is the best way to perform this re-inventory due to cost effectiveness and its ability to utilize available free resources

National Inventory of Dams NID has many of the largest dams in Alabama but suffers from drawbacks of a national dataset Many dam locations are off spatially by a significant distance or have points that do not correspond to any existing dam Underestimates the true number of potentially hazardous dams in Alabama

Utilization of GIS Resources Aerials → NAIP aerials available for free download and/or Base Map imagery layers in ArcGIS 10 Existing Shapefiles USGS Quadrangles Layer → used as a way to divide up Alabama into study areas National Hydrology Dataset → stream centerlines to verify stream flow DFIRM Databases → includes flood zones to show extent of flooding effects in area Seamless USGS 7.5 Minute Topographic Maps → available for free through services.arcgisonline.com USGS 10 Meter Digital Elevation Models (DEMs) → assists in portraying drainage area as well as assisting in possible flooding extents for more difficult areas

Identifying Risk Attributes What is the maximum storage in volume the dam can contain? How tall is the dam? Is there a risk downstream of the dam?

Locating Visually Study Area Logistics Aerial Identification Study areas broken up by quads 48 subsections to each quad Aerial Identification 3 acres with a hazard less than ½ mile downstream Greater than 10 acres Hazard Verification Use NHD, DEM, and/or DFIRM flood zones to verify hazard potential

Example of Potential Infrastructure Hazard

Example of Potential Occupied Building Hazard

Calculating Height in GIS H1 = Height of water at normal pool (assumed to be 3 feet lower than top of dam) H2 = Difference in contours of those immediately downstream of dam and immediately upstream of visible water in pond D1 = Distance from dam to upstream end of stream line for visible water D2 = Distance between the 2 contours used to calculate H2 Through making some general assumptions we can estimate the height and volume from the available layers

ArcMap Height Calculation Example

D1 and D2 in ArcMap

Calculating Volume and Area in GIS H1 = previously calculated height 3 feet below top of dam AW = area of visible surface water as measured in GIS from aerial ATOD = area of surface water at full pool VTOD = volume for the pond at full pool

Assumptions for Calculating Height/Area/Volume Pools are at normal elevation Stream gradient under the pond is the same as the stream gradient beyond the pool 3 feet in elevation between normal pool and top of dam Depth vs. Area is a linear relationship Volume = 0.4 x top of dam depth x top of dam area for full pool

DEM Usage DEMs were required to add in supplemental information about the dams like calculating drainage area for watershed ponds Helped designate dams as having a hazard or not downstream in areas without flood zones

QA/QC Since GIS can use queries to field calculate most of the values only the D1, D2, and H2, as well as the drainage area and dam length, had to be recorded in the initial review. Spatial Database Engine (SDE) was used to actually draw the D1 and D2 as their own layers in one dataset so it would be available to the GIS specialist doing the initial inventory as well as the reviewer for edits at the same time Reviewer focus: Making sure all dams were accounted for per quad Hazards are verified Dam location orientation is correct (using DEM) D1, D2, and H2 all make sense to ensure accurate estimations

Trouble Areas USGS topos and aerials do not match up making D1 and D2 seem shifted

Trouble Areas Accounting for dry storage

Trouble Areas Unrealistic height estimations from USGS topos

Results NID points are outdated and did not represent true number of dams with potential hazards Volume and Height estimations allow OWR to propose new inclusions into the NID OWR can further classify these inventoried dams by risk and perform field verifications on the most essential dams as needed

Results

Qualifications for Inclusion into NID Has an impounding capacity at maximum water storage elevation of at least 50 acre-feet Exceeds 25 feet or more in height Will create a probable loss of human life in the event of failure or improper operation, regardless of height or storage capacity. (High Hazard) Will create a probable loss of critical infrastructure in the event of failure or improper operation, regardless of height or storage capacity. (Significant or Moderate Hazard)

Questions?