Case Study Drainage at Koo Wee Rup Bus Terminal. With Koo Wee Rup expanding at the rate it is the bus terminal needed upgrading, the land where it is.

Slides:



Advertisements
Similar presentations
GUIDELINES FOR THE PACKAGING AND TRANSPORTATION OF INSERTS & SUPPLEMENTS The printer must ensure that all inserts are free from set-off and that the ink.
Advertisements

Case Study Flemington Drainage Of New Track. Flemington Racecourse is a major racing venue in Melbourne, the track due to its surface condition needed.
Erecting steel structures Setting up or dismantling cranes or hoists
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
Case Study PVC Column Replacement My Steel Casing has Disappeared.
Case Study Alternative Bore Casing Materials. If your looking for Hydrocarbons or chemicals in the ground then PVC is not the best material to be used.
REVOLUTIONARY AUTOMATED SUBSOIL DRAINAGE INSTALLATION SYSTEM Important Notice This presentation and all information contained herein is commercial-in-confidence.
Cylinder Design Cylinder Liner (Barrel) Design
Ground-Supported Slabs • Exterior Flatwork
Safely Using Drill Collar Clamps
What is a fastener? A device to locate or hold parts
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
CONSTRUCTION OF SOIL NAILING WALLS
Finally, a compressed air piping system so simple…it’s EZ!
Trike Frame Redesign Concept Design Fiona Hughes Gina Policelli Jodie Wu.
Fiberglass Pads and Mats for Heavy Equipment
Welcome to Flexco ® Rivet Hinged HEAVY-DUTY FASTENER SYSTEMS.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
LINDFIELD PUBLIC SCHOOL STAGE TWO TEAM Before we started the challenge, our group found out about water in our world…
Foundation Systems.
Condensation Piping and Installation Drain Pans
LADDER SAFETY.
1.3: Fresh Water Flows Underground Groundwater: Water held underground Permeable: A substance that liquids can flow through. Ex: coffee filter, soil,
Installation. Indoor Unit Installation Typical Installation.
Wheelchair Design in Developing Countries: Redesigning the Trike Frame Fiona Hughes, Gina Policelli, Ashley Thomas, and Jodie Wu; Massachusetts Institute.
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
Compressed Air Piping Systems by Asahi/America
Solar Water Heating Bob Ramlow
Technical and Installation 1. What will my slot depth/size for the bottom track need to be? The slot depth for standard flush tracks and full drainage.
Installation. Indoor Unit Installation Typical Installation.
Subsurface drainage – Investigations
SUPPORT FUNCTION 1-1. SBS installation will be done same time by product specialist Loading & Unloading will be taken care for safe handling of.
DRYING Dr. Basavaraj K. Nanjwade M. Pharm., Ph. D
How Do Californians Get the Water They Need?. California Science Standard 3.e Students know the origin of the water used by their local communities.
HVACR116 – Trade Skills Longest length method.
Architectural acoustics Acoustical materials. Sound absorber: Reapor Expanded Glass Granulate  Description  The sound absorber for challenging environments.
Surface Water Chapter 9. Surface water movement: Water Cycle Earths water supply is constantly recycled.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
CORE DRILLING MACHINES AND ACCESSORIES
8.2 Problems Involving Dry Friction
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
COEN STEEL LEADING THE WAY IN GRATING SOLUTIONS FORGED WELDED GRATING | PRESSURE LOCKED GRATING | GRP | PERFORATED METAL PLANKS.
Objectives: Different methods of sanitizing and how to make sure they are effective How and when to clean and sanitize surfaces How to wash items in a.
Copper Pipe Plumbing Systems
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Installing Guttering and Rainwater Systems
Main Parts of a Drilling Machine
Presentation by ANAS AHMAD ME1 B1 batch Submited to
PLANER. Parts 1. Table 2. Table raising & lowering handwheel 3. Corrugated (sectional) infeed roll (top) 4. Smooth infeed roll (bottom) 5. Chipbreaker.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Unit 209: Drainage systems
AR362 - Structural Systems In Architecture IV Lecture : Foundations
THE CENTRE LATHE - 'FACING OFF' A very basic operation is called ‘facing off’. A piece of steel has been placed in the chuck and the lathe cutting tool.
High Density Polyethylene Pipes Our Products & Services
Road Safety Checklist Continue By Leon Swanepoel
GROUND IMPROVEMENT TECHNIQUES
Flash penetrations through roofs and walls.
HEAVY LIFTING Lifting heavy items is one of the leading causes of injury in the workplace. In 2001, the Bureau of Labor Statistics reported that over 36.
ADVANTAGE BRIDGE/FRAC PLUG S
BUILDING CONSTRUCTION 1
HEAVY-DUTY FASTENER SYSTEMS
Microscope Basics T. Trimpe
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
Warm up 9/14 Draw and Solve.
SCITEQ End closure series
Hulu com forgot | | Hulu forgot password
Chicago Clamp Company Manufacturing Structurally Sound and
Presentation transcript:

Case Study Drainage at Koo Wee Rup Bus Terminal

With Koo Wee Rup expanding at the rate it is the bus terminal needed upgrading, the land where it is was first built on was just a dirt paddock, to endure there was no corrosion and a solid foundation, rain water needs to be drained away.

Materials needed to be strong enough to take the weight of the gravel placed on top of it. Slots not to let grave pass into pipe. Connect to standard drainage fittings. Pipe to be 300 Stormwater corrugated pipe Rubber ring Joints. Continues on next slide……….

Carry specific amount OD water through it. Meet a specific open area. To be slotted to the drawings requirements Meet Collapse pressure strength Easily transported and light weight.

The solution was to use 300mm standard blackmax stormwater pipe Manufactured to Australian Standards Slot Pattern machined was 4mm slots by 3 rows The above specifications allowed the collection of water from the surface at the rate required Meet Collapse Pressure

To use Australian Pipe Manufactured to AS1477 The slotted pipe was machines on one our automated slotters to the required pattern specifications

To use Australian Pipe manufactured in Australia The slotted pipe was machined on one our amnaul slotters to the required pattern specified Due to quantities being low it was decided to machine the slots on the manual machine. By using Blackmax made handling was easier for both parties, as this pipe comes in 6m lengths. Continues on next slide………….

It was decided to slot in-between the ribs of the pipe to ensure maximum strength of the pipe. With the pipe being light, we could deliver the pipe ourselves on a ute with pipe racks, keeping the delivery time to a minimum.

Case Study Find other suppliers in Australia Use standard slotted drain pipe that would not meet the specifications. Use Imported cheap pipe. Slot pattern by using hand tools. Thus having inconsistent slot width and patterns. If slotting each slot by hand held machine, run the risk of having an accident and getting OHS Involved.

After the successful installation of the drainage system and completing the infrastructure, all drain water was removed from the are and the ground could then be surfaced without fear of damage from underlying water. All passengers are now loading on to the buses from solid dry ground having little risk of slipping on wet muddy ground.

Thank you for taking the time to look at the information we have created for you, We hope this will be of assistance to solving your piping, drainage and drilling challenges. If you have any more questions Please feel free to contact myself or one of our team Article

For more Articles, Case Studies, How to and Information go to then click onto Handy Links or contact us on Case Study

Solving your Piping, Drilling and Drainage Challenges with Trust and Integrity