User requirements of a comprehensive ENVIRONMENTAL MONITORING software system Susan B. Cleary.

Slides:



Advertisements
Similar presentations
An Indispensable Quality Assurance Tool for Dairy Processing Plants.
Advertisements

Project Management with VIVA PPM Tool (Project Portfolio Management)
Tips to a Successful Monitoring Visit
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Microbiological Validation
Use of RtReports in the Pharmaceutical Environment
Micro Control Solutions Stability System II rev. 6.4
Service Report Generator Document your plant visits with a professional touch.
SBS Vendor Management™
Process Monitoring is only the first step in improving process efficiency.
Is your company drowning in a sea of documents and regulations ? Quality Systems Integrators presents... TMSWeb Quality Management Compliance System.
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
Radiopharmaceutical Production
© WHO – PSM Quality Control Laboratory Pharmaceutical Quality, Good manufacturing Practice & Bioequivalence Kiev, Ukraine October 2005 Maija Hietava.
Requirements Specification and Management
Stability Lab Information Manager Software by Stability Professionals, for Stability Professionals.
Sunday Business Systems SPC Keeper Features and Benefits.
Sunday Business Systems Simple Survey Features and Benefits Fueling Small Business Efficiency.
Micro Control Solutions Annual Product Review rev. 6.5 “Click” for next slide Move to the next slide when the request appears.
Good Manufacturing Practices Guilin, PRC Dr AJ van Zyl for Quality Assurance and Safety: Medicines Medicines Policy and Standards Health Technology and.
HACCP Manager Software™
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd Edison, NJ A Successful Approach to a LIMS Upgrade In A Public.
Supplementary Training Modules on Good Manufacturing Practice
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
QAD Quality Management Systems Roll Out November 17, 2014.
Ground Control™ Document Control and Training Manager
Laboratory Information Management Systems (LIMS) Lindy A. Brigham Div of Plant Pathology and Microbiology Department of Plant Sciences PLS 595D Regulatory.
QC/QA Mary Malarkey Director, Division of Case Management Office of Compliance and Biologics Quality Center for Biologics Evaluation and Research March.
PROCAL MULTI DISCIPLINE CALIBRATION SOFTWARE CALIBRATION PROCEDURE MANAGEMENT CONFIGURATION & CUSTOMISATION STAND-ALONE CERTIFICATE PRINTING.
Laboratory Information Management Systems. Laboratory Information The sole product of any laboratory, serving any purpose, in any industry, is information.
Instructions and forms
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
BUSINESS SYSTEMS IMPROVEMENT PROJECT NC Department of Transportation Early 1980’s – Legislative Directive to use a SHARED Fleet Maintenance System SVFMS.
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
1 OpenBee P.M. Collaborative solution for proposal management 1.
A Product of Copyright © ANGLER Technologies AURA – Quality Compliance Monitoring & Process Management System.
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
Systems Analysis and Design: The Big Picture
MethodECMS © כל הזכויות שמורות. Methoda Computers Ltd 2 MethodECMS  MethodECMS is a proactive package that enables the establishment.
ACT! 2008 (10.0) Product Tour for ACT! 2007 (9.0) Users.
ENVIROTRAC: A Premier Chamber Monitoring and Data Acquisition System Envirotrac A Guided Tour.
A Comprehensive Computer Application for Managing Sample Planning, Electronic Data Manipulation and Data Validation and Verification in Support of the.
Open source administration software for education research administration Awards Module Susan Mundt, University of Arizona KCC Award Subcommittee Co-Lead.
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
All rights reserved, property and © CAD Computer GmbH & Co.KG 2009 Cover page.
InstantGMP: Electronic Batch Records System for GMP Manufacturing InstantGMP™ Inventory Control Module for GMP Manufacturing.
Workflow Description Roles and Responsibilities DEVA Data Management Workshop Devil’s Hole Pupfish Project Project Managemen t!?!
All rights reserved, property and © CAD Computer GmbH & Co.KG 2009 Cover page.
Sampleminded® Support Overview Last Updated: 1/22/
PwC 21 CFR Part 11 – A Risk Management Perspective Patrick D. Roche 07 March 2003, Washington D.C.
Title Page programmemanagementsystem KPMD (IT Solutions) Ltd Blades Enterprise Centre, Bramall Lane, Sheffield S2 4SU, United Kingdom telephone: +44 (0)114.
Introduction to RtReports – Tony Fenn & Chris Nelson Introduction to RtReports Chris Nelson - Senior Developer Tony Fenn - Product Manager.
Site Specification Management Using the RtPM Platform
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
1 Hach Water Information Management Solution TM (Hach WIMS TM ) Overview.
1 Session Number Presentation_ID © 2002, Cisco Systems, Inc. All rights reserved. Using the Cisco TAC Website for Security and Virtual Private Network.
Site Specification Management Using the RtPM Platform Ray Hall.
IdentiTrip 2006 Key Features & Benefits All data imported from MIS system Quick MIS upload annually for new intake and class changes No manual input of.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 A Look at the Application Authorized users can access Communicator! NXT from any Internet-capable computer via the Web.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
ISO/IEC
Managing the IT Function
Engineering Processes
Collaborative Business Solutions
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Stability Management Software
Radiopharmaceutical Production
Presentation transcript:

User requirements of a comprehensive ENVIRONMENTAL MONITORING software system Susan B. Cleary

Current Practices Legacy systems – pre 1997 Spread sheets – non-compliant In-house systems – Maintenance / upgrade / Regulatory changes

Benefits of a Comprehensive System All data is managed and contained in one system. (for all sites) All data can be easily analyzed expediting problem detection Data integrity and security Regulatory compliance

User Requirements Specific (easily understood) Attainable (realistic) Prioritized Traceable – (requirement ~ design ~ validation) Compliant to 21 CFR part 11

What are the requirements in a Comprehensive EM Software System?

Define the Workflow Manage users Register and schedule tests Generate summaries Distribute worksheets Enter results Statistical analysis Reporting Utilities and Controlled Environment

Manage System Users Multiple security levels Limited access Concurrency – Data integrity Event Notification

Set-up Test Protocols Controlled Environment Test type (Rodac, Settle plate, Air sample,…) Viable (Bacteria,Yeast/Mold) Non-Viable (Particle counts) Location Location classification Static/Dynamic specifications Static/Dynamic scheduling Prepare/Review/Approve

Set-up Test Protocols Utilities Utility type – Clean steam – Water (Source,Lab, Purified,WFI, …) – Gas (CO 2, Compressed Air, Nitrogen, …) Valve/Port and Loop Test type (TOC, Bio-burden, Heavy metal (EP)) Specifications (alert, action, control) Scheduling Prepare/Review/Approve

Recurrence patterns

Set-up Test Protocols Personnel Monitoring Test type (Gowning, Finger dabs, …) Location Specifications Scheduling Prepare/Review/Approve

Personnel Monitoring

Mapping Room template Personnel template Adding test locations Multiple rooms Secure file storage Audit trail

Mapping Import from other file formats Floor plan Test location definition

Bar-coding Sample tracking Labels Fonts (code 128, code 39) Self contained Configure with existing labeling

Generating Summary Sheets Creating only what is required Based on protocol scheduling Static or dynamic specs

Distribution of Worksheets Scheduled testing lists Printed maps Bar code labels Sample status

Data entry Data organization and the effect on data entry Detail data entry – Incubators – Exposure times – Personnel contact Data entry using bar-codes Complete/Review/Approve – Equipment – Product lot number – Media lot number

Handling Excursions Designating excursion values – Pathogenic – Alert/Action/Control levels Visual cue Differentiation between spec levels notification Investigation initiation prompt

Microbial Identification Multiple Identifications File attachments Prepare/Review/ Approve

Investigations Action Follow-up Final decision Completion and approval Visual cue Master list

21 CFR part 11 Electronic signatures Time stamps User logs Change controls Audit trails Record retention (Back up and Archiving)

Statistical Output Trend basis – User – Location – Test type and location – Microorganism

Statistical Output Graphic display – Scatter plots – Bar charts – Pie charts – Regression analysis

Reports Default reports – Protocols – Summaries – Worksheets Company specific requirements – Logos – Custom formatting

Free Format Query Dynamic field selection Alpha or numeric field detection Graphic display Printed report

Archiving Free-up current database space Access the data on demand Storage of past data – Audit trail – Version control

Define lab requirements – Current state – Future improved state User requirements/Design specification – Gap – Configuration EM Software Implementation

Training by user type – Power users (system administrators) – Standard users Three phase training – Demonstration – Hands on – Question and Answer Evaluation and sign off

EM Software Implementation Validation – Installation Qualification – Operational Qualification – Performance Qualification Traceability matrix Standard Operating procedures (back up/recovery)

EM Software Implementation Gap Analysis – Defending the system – Meets with internal SOPs Measure performance – Increased lab productivity

Additional Information To request additional information about Novatek’s EM Software Application, you may contact: Aty Heidari Manager of Technical Sales Tel.: (514)