Folksam migrating to IIS 8.7 Information Server User Group meeting 2013 Daniel Palmgren, Folksam.

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Symantec 2010 Windows 7 Migration Global Results.
Jay Shavitz January 21, 2012 Los Angeles, CA. What is Rm SQL Reporting Rm Data + Power and Flexibility of.
Adabas Roadmap Wolfgang Weiss September
Software AG provides no commitment to deliver any of the features described herein, and reserves the right to change its product roadmap from time to time.
Standards Review Subcommittee Update October 22, 2013.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
1 Copyright © 2005, Oracle. All rights reserved. Introducing the Java and Oracle Platforms.
6 Copyright © 2005, Oracle. All rights reserved. Building Applications with Oracle JDeveloper 10g.
Foundations of Programming and Problem Solving Introduction.
Philadelphia Area SharePoint User Group January 30, 2013 Chris Mann RJB Technical Consulting
NAV 2009 and The Role Tailored Client Get More from Your ERP Solution & Prepare for Better Times Ahead by Upgrading to Microsoft Dynamics NAV 2009.
How High is Too High? Focusing Your Limited Resources to Effectively Reduce your Rising Cohort Default Rate Dave Macoubrie Vice President of Repayment.
IT Essentials 5.0 Overview February Cisco Public © 2013 Cisco and/or its affiliates. All rights reserved. 2.
What's new?. ETS4 for Experts - New ETS4 Functions - improved Workflows - improvements in relation to ETS3.
Simplified Management using the Enterprise Policy Management Framework
Complex Test Suites Organization Victor Kuliamin ISP RAS, Moscow.
1 Migrating from Access to SQL Server Simon Kingston, CSU / NPS NRGIS.
HORIZONT 1 XINFO ® The IT Information System HORIZONT Software for Datacenters Garmischer Str. 8 D München Tel ++49(0)89 /
Cobol Files to SQL Databases
Multiplication Tables Test 3 and 5 Times Tables 3 and 5 times tables There are 10 questions. Each one will stay on the screen for 15 seconds. Write down.
Traffic Analyst Complete Network Visibility. © 2013 Impact Technologies Inc., All Rights ReservedSlide 2 Capacity Calibration Definitive Requirements.
WHAT IS ANDROID? A Software platform and operating system for mobile. Based on the Linux kernel. Android was found way back in It was developed.
Operating Systems Operating Systems - Winter 2012 Dr. Melanie Rieback Design and Implementation.
Welcome to the See how Housecleaning Business Manager will tame your business… Demonstration © 2007 Housecleaning Business Manager™ All Rights Reserved.
Database System Concepts and Architecture
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
3.1 Silberschatz, Galvin and Gagne ©2009 Operating System Concepts – 8 th Edition Process An operating system executes a variety of programs: Batch system.
Epson TM-T20 Release: EPSON Europe B.V.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
School Census Summer 2011 Headlines Version Jim Haywood Product Manager for Statutory Returns.
Gemini Re-platforming Project Update April This presentation is to provide an overview of the Gemini Re-platforming Project (GRP) and provide early.
Technology Services Strategic Plan for Operational Efficiency
IT Roadmap Presentation to FCERA Board of Retirement Barbara Scheffels, Retirement Practice Leader Akio Tagawa, Principal Linea Solutions, Inc. 4/15/2009.
Solving Systems by Substitution
Performance Tuning for Informer PRESENTER: Jason Vorenkamp| | October 11, 2010.
Week 1.
Copyright © 2010 Pearson Addison-Wesley. All rights reserved. Chapter 10 One- and Two-Sample Tests of Hypotheses.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
University of Minnesota Optimizing MapReduce Provisioning in the Cloud Michael Cardosa, Aameek Singh†, Himabindu Pucha†, Abhishek Chandra
Installing Windows XP Professional Using Attended Installation Slide 1 of 30Session 8 Ver. 1.0 CompTIA A+ Certification: A Comprehensive Approach for all.
MS Access.
© 2012 IBM Corporation What’s new in OpenAdmin Tool for Informix? Erika Von Bargen May 2012.
IKnow Process Visibility Process Management iRule Nordic QualityStage rule sets Petter Enqvist Senior systems consultant Intelligent Communication AS.
Paper on Best implemented scientific concept for E-Governance Virtual Machine By Nitin V. Choudhari, DIO,NIC,Akola By Nitin V. Choudhari, DIO,NIC,Akola.
16.1 © 2004 Pearson Education, Inc. Exam Managing and Maintaining a Microsoft® Windows® Server 2003 Environment Lesson 16: Examining Software Update.
#RefreshCache CI - Daily Builds w/Jenkins – an Open Source Continuous Integration Server Nick Airdo Community Developer Advocate Central Christian Church.
© 2003, Cisco Systems, Inc. All rights reserved. CSIDS 4.0—11-1 Chapter 11 Enterprise IDS Management.
Acceleratio Ltd. is a software development company based in Zagreb, Croatia, founded in We create innovative software solutions for SharePoint,
Thomas Finnern Evaluation of a new Grid Engine Monitoring and Reporting Setup.
A Multithreading C# Data Synchronization Program and Its Realization Course: ECE 1747H Parallel Programming Professor: Christiana Amza Student / Presenter:
Step Arena Storage Introduction. 2 HDD trend- SAS is the future Source: (IDC) Infostor June 2008.
Module 11: Implementing ISA Server 2004 Enterprise Edition.
The HipHop Compiler from Facebook By Megha Gupta & Nikhil Kapoor.
1998 PI System Users’ Conference PI 3.2 New Features Enhancements Product Support Plans for the next release.
Windows Operating system
1 Oracle Enterprise Manager Slides from Dominic Gélinas CIS
Office of Administration Enterprise Server Farm Managed Services August 2004 Briefing.
Slide 1 © 2016, Lera Technologies. All Rights Reserved. Oracle Data Integrator By Lera Technologies.
Requirements & Migration
Fundamental of Databases
DXL to PST Converter presents
Virtualization Review and Discussion
(ZCO) ZIMBRA Connector for Outlook User Manual
Configuring Attendant Console
IBM DATASTAGE online Training at GoLogica
How to Create Mac OS X Recovery Partition?
Building a PC Chapter 12.
Presentation transcript:

Folksam migrating to IIS 8.7 Information Server User Group meeting 2013 Daniel Palmgren, Folksam

Situation January 2012 IIS 8.1 running on LPAR IBM P6 AIX 6.1 XlC 9 compiler DB2 LUW 9.5 DB2 z/OS (source) 12 DataStage projects 1500 jobs Local and virtual Windows XP clients moving to Windows 7 in June 2012

Reasons to upgrade to 8.7 Integration with Clear Case Debugger in DataStage Designer Operations Console Each job consumes less resources XML handling Current Designer is unstable

DB2 Enterprise stage Complicated setup with cross server mount Replaced with DB2 Connector Stage using tool Easy setup More modern and flexible interface More options

Connector Migration Tool

POC August 2012 Estimate time consumption Rewrites Migrated to Quite painful, meny rewrites

Windows Client does not support Windows 7 Skip poc, do the migration! Keep virtual XP clients until end of project

IBM Concierge Offered support during migration project Phone conference October 2012 Check requirements Choosing recommended path Ismigration tool

Installation path New server (lpar) Manually export – import jobs

Installation test October 2012 LPAR IBM P7 AIX 7.1 DB2 9.7 XlC 12 Installation and configuration – 1 day

Testing November - December Projects created All jobs imported and compiled

Test results A number of test jobs selected – 20 % 8.1 and 8.7 results compared successfully

Things changed DB2 z/OS. Bind error. ▫Re-import table definitions DB2 Connector ▫Changed execution mode to sequential Transformer null handling ▫Unhandled nulls gives compilation error ▫Correct null handling solves the problem

Production environment Installed in December 2012 XlC 12 not supported, changed to XlC Gb RAM compared to 30 Gb for 8.1

Performance tests January 2013 Find optimal numer of concurrent jobs Tried 1-60 concurrent No more than 10.

Migrations First project successfully in production Migrating one project per week Last project migrated

Conclusion Painless installation of server and client Small number of adjustments Performance gain % Time consumption 300 h plus 50 hours for install and config

Operations console

iKnow Monitoring job progress and server health Evaluate job statistics to improve performance Find slow moving jobs Find errors and warnings

iKnow

Job performance and hw usage

Process management & scheduling

What happened?

Thank you!