1 Making a Seamless Move to Windows ® 7 Imagine a migration that went so well, nobody noticed.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

Symantec 2010 Windows 7 Migration Global Results.
1 Making the Desktop Dynamic. 2 What does RES do? »IT as a Service & Automation »Context Aware Security »Dynamic Desktop Delivery »Follow-me Secure Data.
1/17/20141 Leveraging Cloudbursting To Drive Down IT Costs Eric Burgener Senior Vice President, Product Marketing March 9, 2010.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
0 - 0.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Copyright © 2006 Quest Software Quest SharePoint Management.
WLAN Validation 1 Motorola Public Document Classification, October 2011 MODULE 18 WLAN VALIDATION.
| Copyright © 2009 Juniper Networks, Inc. | 1 WX Client Rajoo Nagar PLM, WABU.
©2010 Check Point Software Technologies Ltd. | [Restricted] ONLY for designated groups and individuals Visions for 2010 Anna Russell & Andy Clark.
OVERVIEW Virtualization Defined Server Virtualization
IBM Software Group ® Integrated Server and Virtual Storage Management an IT Optimization Infrastructure Solution from IBM Small and Medium Business Software.
Altiris for Desktop Management and More! Presented by: ITS (Scott Arnst and Kathleen Conover) January 16, 2004.
© 2006 DataCore Software Corp SANmotion New: Simple and Painless Data Migration for Windows Systems Note: Must be displayed using PowerPoint Slideshow.
13 Copyright © 2005, Oracle. All rights reserved. Monitoring and Improving Performance.
© 2009 VMware Inc. All rights reserved View Pool Image Configuration Considerations for Gold Images around Application virtualization and performance.
Copyright © 2012 AirWatch, LLC. All rights reserved. Proprietary & Confidential. Mobile Content Strategies and Deployment Best Practices.
Customer Strategic Presentation March 2010
2  Industry trends and challenges  Windows Server 2012: Modern workstyle, enabled  Access from virtually anywhere, any device  Full Windows experience.
2  Industry trends and challenges  Windows Server 2012: Modern workstyle, enabled  Access from virtually anywhere, any device  Full Windows experience.
Unified. Simplified. Unified Communications Launch 2007.
© 2013 VMware Inc. All rights reserved Addressing Windows XP Migrations VMware End-User Computing Peter von Oven Senior SE & Pre Sales Lead, End-User Computing,
1 Chapter 11: Data Centre Administration Objectives Data Centre Structure Data Centre Structure Data Centre Administration Data Centre Administration Data.
Addition 1’s to 20.
Week 1.
1. 2 Easy-to-Use Administrator Features 3 Customisable Screen Cutoff Scores.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 30 Slide 1 Security Engineering 2.
 What Is Desktop Virtualization?  How Does Application Virtualization Help?  How does V3 Systems help?  Getting Started AGENDA.
Which server is right for you? Get in Contact with us
Building the case for Windows 8.1 Flexible Workstyle deployment Windows 8.1 Business Value Workshop Microsoft Consulting Services can help you build the.
Protect Your Business and Simplify IT with Symantec and VMware Presenter, Title, Company Date.
The future of Desktops Transform Your Desktop with Virtualization.
1 Storage Today Victor Hatridge – CIO Nashville Electric Service (615)
1 Disk Based Disaster Recovery & Data Replication Solutions Gavin Cole Storage Consultant SEE.
CLEARPATH SOLUTIONS GROUP We Speak Cloud.. About Clearpath Solutions Group VMware Premier Partner & Technology Integrator established in 2006 Inc 500/5000,
Experience, Technology and Focus in Mid Market CRM Soffront Asset management: An Overview.
-How To leverage Virtual Desktop for Manageability & Security -Desktop Computing “as a service” Andreas Tsangaris CTO, PERFORMANCE
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
Citrix Partner Update The Citrix Delivery Centre.
Services Flexible Workstyle and People-Centric IT Windows Accelerate: Deployment Windows 8.1 Proof of Concept (Window 8.1 PoC) will demonstrate how the.
Software Asset Management
Copyright © 2005 VMware, Inc. All rights reserved. VMware Virtualization Phil Anthony Virtual Systems Engineer
by Evolve IP Managed Services
Client Management. Introduction In a typical organization there are a lot of client machines used for day to day operations Client management is a necessary.
1 Managed Security. 2 Managed Security provides a comprehensive suite of security services to manage and protect your network assets –Managed Firewall.
CredoGov VDI Introduction James Gunn
About the Presentations The presentations cover the objectives found in the opening of each chapter. All chapter objectives are listed in the beginning.
1. Windows Vista Enterprise And Mid-Market User Scenarios 2. Customer Profiling And Segmentation Tools 3. Windows Vista Business Value And Infrastructure.
Product Manager, Windows Client Robert Geller. Need to differentiate from competitors Customer complexity driving cost Need new growth strategies Difficult.
The Citrix Delivery Center. 2 © 2008 Citrix Systems, Inc. — All rights reserved Every Day, IT Gets More Complex EMPLOYEES PARTNERS CUSTOMERS.
Successful Deployment and Solid Management … Close Relatives Tim Sinclair, General Manager, Windows Enterprise Management.
Chapter Fourteen Windows XP Professional Fault Tolerance.
Windows ® User State Virtualization Infrastructure Planning and Design Published: August 2010.
Copyright © 2011 EMC Corporation. All Rights Reserved. MODULE – 6 VIRTUALIZED DATA CENTER – DESKTOP AND APPLICATION 1.
What is Driving the Virtual Desktop? VMware View 4: Built for Desktops VMware View 4: Deployment References…Q&A Agenda.
SAM for Virtualizatio n Presenter Name. Virtualization: a key priority for business decision makers Technavio forecasts that the global virtualization.
1 Evolution and Revolution: Windows 7 and Desktop Virtualization How to Accelerate Migration to Windows 7 Miguel Sian, Sr. Enterprise Solutions Consultant.
Project Portfolio Management Business Priorities Presentation.
Microsoft Desktop Virtualization Kiran N R Optimized Desktop – TSP Microsoft Corporation.
Jurgen Van Duvel Business Manager Windows Client Microsoft
Practical IT Research that Drives Measurable Results Leverage Server Virtualization for DR Affordability and Agility 1Info-Tech Research Group.
Practical IT Research that Drives Measurable Results 1Info-Tech Research Group Get Moving with Server Virtualization.
VMware Mirage Desktop Deployment and Case Studies.
 Remote monitoring and management (RMM), also known as network management or remote service software, is a built on application to help managed IT service.
Azure Site Recovery For Hyper-V, VMware, and Physical Environments
Agenda The current Windows XP and Windows XP Desktop situation
Presentation transcript:

1 Making a Seamless Move to Windows ® 7 Imagine a migration that went so well, nobody noticed.

Process/Timeline PHASE I Benchmark Gather user data Define success Create project plan PHASE II Image Deployment Create one Master Image Deploy remotely Restore with personalizations PHASE III Validate and Measure Success ID and fix performance issues Disaster recovery and repair, as needed Quantify success 2

PHASE I Stratusphere ™ FIT Gather user data Define success Create project plan 3

PHASE IIPHASE I Horizon Mirage ™ Create one Master Image Deploy remotely Restore with personalizations 4

PHASE IIIPHASE IIPHASE I Stratusphere ™ UX ID and fix performance issues Disaster recovery and repair, as needed Quantify success 5

6 Process / Timeline PHASE I Benchmark Gather user data Define success Create project plan PHASE II Image Deployment Create one Master Image Deploy remotely Restore with personalizations PHASE III Validate and Measure Success ID and fix performance issues Disaster recovery and repair, as needed Quantify success

PHASE I Benchmark with Stratusphere™ FIT Assess and quantify machine, user, and infrastructure metrics. Provide visibility into user persona and authored data. Access applications for usage and master image strategy. Define the baseline user experience. Design base image on actual usage metrics. Group users into appropriate tiers based on consumption. 7

PHASE I Visibility Throughout Is Key 8 Workers’ Desktops Target Image How are users spending their time? What are they consuming? What is the baseline user experience? Are image resources adequate and available? Are problems developing? Constraints and/or avoidable crashes ahead?

PHASE I Summary of Benefits Collect data automatically. Accurate data — no lost work time for users. Reduce migration labor costs. Accurate metrics lead to accurate planning. Save on licensing costs. Identify apps that users have but never use. 9

Process / Timeline 10 PHASE I Benchmark Gather user data Define success Create project plan PHASE II Image Deployment Create one Master Image Deploy remotely Restore with personalizations PHASE III Validate and Measure Success ID and fix performance issues Disaster recovery and repair, as needed Quantify success

PHASE IIPHASE I Mirage™ Server Centralized Images Network-Optimized Synchronization and Streaming Windows ® 7 Image Desktops/Laptops with Mirage Client Local Copies Migrate Image Centrally and In-Place 11

PHASE IIPHASE I Windows 7 Reference Machine Reference CVD Base Image CVD 2 CVD 1 Base Image is captured from the Reference CVD. Horizon Mirage™ Server CVD 3 Branch Reflector The BI is downloaded to one or more Branch Reflectors. 12 Endpoints leverage Reflector to load new Base Image.

PHASE IIPHASE I Summary of Benefits Better manage and optimize image creation. Manage one Master Image vs Achieve more migrations per day. Centralized migration operations eliminate most or all PC visits. Avoid loss of user files. Quickly revert to original Windows XP, preserving user personalizations and data. 13

Process / Timeline 14 PHASE I Benchmark Gather user data Define success Create project plan PHASE II Image Deployment Create one Master Image Deploy remotely Restore with personalizations PHASE III Validate and Measure Success ID and fix performance issues Disaster recovery and repair, as needed Quantify success

PHASE IIIPHASE IIPHASE I Validate with Stratusphere™ UX Ongoing and proactive monitoring—the ability to quantify UX. Validate image changes to ensure optimal performance. Identify rogue entities and/or bottlenecks to quickly remediate issues. Enable "what-if" scenarios to plan for growth and changes. Get support for mixed VMware Mirage and VMware View environments with single pane-of-glass monitoring. 15

PHASE IIIPHASE IIPHASE I Measure for Success 16 Reporting to ensure equal-to-better user experience At-a-glance comparison of physical machines to Mirage-managed machines Easy to see results to quickly determine if users are reaping the benefits of the transformation

PHASE IIIPHASE IIPHASE I Summary of Benefits Prevent unplanned downtime. Get fewer post-migration calls to the Help Desk. Track system performance. See from the desktop to the data center, and across all networks. Measure success. Built-in reports provide accurate ROI and TCO data. 17

What a migration looks like when you simplify the process: Save money. Reduce migration labor costs; save on licensing costs. Save time. Reduce user downtime during migration; manage one image instead of 300. Use fewer resources. Centralize migration operations; manage fewer post-migration calls. Monitor proactively. Alert administrators to issues; prevent unplanned downtime. Keep end-users productive. Optimize performance; provision resources quickly. 18

Simplify the migration process — and execute it with speed and confidence. Migration Timeline T-3T-2T-1T-0Post-Migration Monitor and measure all hardware, operating systems, and applications. Easily discover all the metrics you need before the move. Define what migration success will mean to you. Define baseline of usage and user experience. Produce reports and use them to put a project plan together. Create a master image. Create and deploy a mirror-perfect image (and manage one image instead of 300). Conduct phased image deployment. Set triggers to let you know when post-migration performance is less than ideal — and drill down to see where the problem really is. Fix it before anyone reports it as an issue. Monitor and compare. Validate that migration worked properly. Generate reports that quantify success. Disaster recovery. Use pre-migration snapshot for recovery and repair, as needed. Recover systems due to lost, stolen, or broken PCs. 19

Imagine this: You controlled your migration instead of it controlling you. You migrated on time and on budget — with minimal downtime and optimum performance during and after the migration. 20