›Christopher Leachman, BIM coordinator, HVAC engineer, ›COWI AS, Oslo Design team Team T3 Nordic Office Of Architecture AS Ing. Per Rasmussen AS COWI.

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Chapter 26 Legacy Systems.
Chapter 7 System Models.
Introduction to Product Family Engineering. 11 Oct 2002 Ver 2.0 ©Copyright 2002 Vortex System Concepts 2 Product Family Engineering Overview Project Engineering.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Making the System Operational
Chapter 3 Critically reviewing the literature
East Hampton High School July 2013 – July 2014 Design Phases.
Welcome 2-Day Conference – Project Management in Construction Sector 1.
Introduction to building Estimating in South Australia 1.
Introduction Lesson 1 Microsoft Office 2010 and the Internet
TECHcommunity March 2012 Collaborate, Connect, Contribute, Catch up & Customize.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
© © QA Software Pty Ltd All rights reserved 1 Project Information Management Tools Inspection and Defects Management System for Projects By QA Software.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Extending Your Autodesk® Revit® Models for BIM to Shop/Fabrication Drawings Grant Doherty.
Refurbishing an Existing Research Facility - Recent Experiences Jon Green VP Business Operations.
EXAMPLE 4 Find the minimum or maximum value Tell whether the function y = 3x 2 – 18x + 20 has a minimum value or a maximum value. Then find the minimum.
Vanderbilt Business Objects Users Group 1 Reporting Techniques & Formatting Beginning & Advanced.
Legacy Systems Older software systems that remain vital to an organisation.
1Office for the Coordination of Humanitarian Affairs (OCHA) CAP (Consolidated Appeal Process) Section Online Project System (OPS) for Consolidated / Flash.
How to commence the IT Modernization Process?
Presented by Martyn Horne – Computers Unlimited - Landscape Institute BIM Working Comittee BIM – Your Next Step 16 th July 2013.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Software processes 2.
Chapter 5 Test Review Sections 5-1 through 5-4.
They tell me that I'm a BIM Coordinator. How did that happen and what does it mean? Brett C. Gatti Design Technology Leader.
Pasewark & Pasewark Microsoft Office XP: Introductory Course 1 INTRODUCTORY MICROSOFT WORD Lesson 8 – Increasing Efficiency Using Word.
Key Stage 3 National Strategy Handling data: session 4.
25 seconds left…...
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
6.4 Logarithmic Functions
Systems Development and Documentation Techniques
Week 1.
We will resume in: 25 Minutes.
Chapter 11: Systems Development and Procurement Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter
Mikael Ekenberg, Progman Oy
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Command and Management Unit 5.
Using “BIM” Features on a real Project John McCann - Vipond UK Art Dove - Hydratec Inc.
BIMForum Academic Survey Updated July 17, Participating Academic Institutions United States Arizona State University Carnegie Mellon University.
Building Information Modeling
Computer assisted design of Sprinkler System Piping assemblies and sub-structures Hilti BU Installation Systems ¦ ¦
THE CHALLENGE TO PROVIDE EDUCATION TO THE CONSTRUCTION INDUSTRY IN A RAPIDLY CHANGING ENVIRONMENT 1 April 2010.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Introduction to BIM BIM Curriculum 01.
Emerging Trends in Electronic Design and Construction April 2013.
Design Development Drawings 1. Code analysis: examine needed changes 2. Draw accurate existing plans/model 3. Indicate demolition 4. Indicate new wall.
Fagskolen i Oslo Norway BIM education Presented by: Magnus Edvardsen and Lars Dagalid.
7 things to boost productivity of your small business team.
3D Coordination For Construction Projects. All trades must provide their shop drawings in 3d for this coordination to work efficiently Structural HVAC.
© 2012 Autodesk Successful Coordination on Actual Projects! SE2534-Roundtable Desirée Mackey, PE Structural Engineer, Martin/Martin.
© 2012 Excitech Ltd IFC for Revit Users Excitech.
© 2012 Autodesk The Devil Is In The Workflow Module 1: Successfully Plan and Implement BIM Luis Rojas Building Design Product Line Manager, Eagle Point.
Charlie Miller, Jon Revtai, Chris Stultz. Our Project Scope AE 310 Semester Project Supplement Workflow for Students and Professors Utilize Revit MEP.
© 2012 Autodesk Autodesk Structural Curriculum 2013 Unit 5: Advanced Structural Analysis & Coordination Advanced Structural Analysis & Coordination.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Geir Johansen, Manager Building & Construction department Norconsult Information Systems (NOIS)
© 2006 Bentley Systems, Inc. Bentley Building Solutions multidisciplinary, integrated design and analysis.
CAD SERVICES BIM/3-D MODELING. SUN MECHANICAL’S VIRTUAL DESIGN CONSTRUCTION STAFF HAS THE SOFTWARE AND EXPERTISE TO INTEGRATE 3-D CAD FILES AND GENERATE.
JACK OF ALL TRADES, MASTER OF…. TEAMWORK? Lessons learned by a CAD Manager with a great team Presented by: Luke Runde.
What is VisualARQ? Architectural software that adds Flexible BIM features to Rhino.
DESIGN TOOLS UPDATE.
Model Checking Tag Team
Implementing Revit and Putting ACE BIM and CAD Standards
An Introduction to Software Engineering
SMB-SE BIM Presentation REVIT CATIA exchange
Presentation transcript:

›Christopher Leachman, BIM coordinator, HVAC engineer, ›COWI AS, Oslo Design team Team T3 Nordic Office Of Architecture AS Ing. Per Rasmussen AS COWI AS Aas-Jakobsen AS Norconsult AS

Topic for discussion today Keys to a successful BIM project Practical examples of how Team T3 uses BIM

Summary of T3

Keys to a successful BIM project Technology StrategyProcess BIM Infrastructure: Software Hardware What BIM ambitions does the owner have? How will the design team meet the goals that are set?

Technology Shared model via IFC and Navisworks: Works Design software: Work in progress Technology

Strategy AVINOR: ambitions of maximal use of BIM

Process – Organising to meet the BIM goals. Process Responsibilities clearly defined. BIM manuals. Plan for use of BIM in QA process. Use of model in different types of meetings. Documentation, documentation, documentation…

T3-CAD/BIM Manager T3-New and exist. Terminals CAD/BIM Manager T3-New Terminal Discipline CAD/BIM Manager T3-New Terminal Discipline CAD/BIM Manager T3-Exist.Terminal Discipline CAD/BIM Manager T3-Exist.Terminal Discipline CAD/BIM Manager T3-Landside CAD/BIM Manager T3-Landside Discipline CAD/BIM Manager T3-Landside Discipline CAD/BIM Manager Responsibilities clearly defined

BIM Manuals define organisation structure

Plan for use of BIM in QA process

Use of model in different types of meetings ›BIM meeting (get on track, and stay there) ›Weekly ICM (TFK) meeting (Issue tracking with Solibri) ›Design, coordination, planning meetings use model (Navisworks)

Practical examples of how T3 uses BIM 16 ›Some examples of how we make use of the BIM model, now that we have one.

Ceiling coordination ›Old school: symbols in the ARCH drawings, objects in ours, coordination, changing, drawing, checking, re-drawing… ›New school: ARCH produces drawings with our objects. No symbols, or duplication. ›Coordination still required of course but no need for tedious cross-checking.

Sprinkler calculations 18 ›Sprinkler calculations via Magicad. Time savings and documentation.

Checking Fire classification 19 ›parameters from fire engineer transferred to ARCH to check fire classification of walls ›same technique for acoustical classification.

BIM model instead of 2d sections 20

BIM model instead of 2d sections 21

Coordinating with the contractor

NTI tools, Space tool 23

BIM model save us time and in…. 24 ›Builders work. Utsparinger. Provision for voids. ›Magicad system editor. Makes keeping the revit system organized way easier… ›standard connections. massive time savings, when it works.