STATE RADIO IP TRANSITION Project Overview Travis Durick 12/5/2012
Deploying Zetron MAX Dispatch system Two cores for redundancy – One in Bismarck – One in another city IMPLEMENTATION
Migrating current TDM-T1 circuits to IP based circuits – “IP to the Tower” Taking place incrementally – First terminate T1’s to IP gateways in State radio IMPLEMENTATION
Utilize RoIP gateway to convert 3 or 4 wire to IP IMPLEMENTATION
State Radio DCN T1 BASED DESIGN Fargo Grand Forks Minot
Fargo State Radio STAGEnet VIPER Backup Site VIPER Backup MAX Dispatch Bismarck Grand Forks Minot IP BASED DESIGN
Bismarck 911 Origination Fargo STAGEnet Backup Grand Forks Minot RADIO + ESINET PSAP3 PSAP2 PSAP 1 State Radio
Add a radio channel from a City/County Give State Radio ability to listen and talk on the channel Transport radio over STAGEnet without any additional circuits P.O.C.