BELAWAN PORT DEVELOPMENT PROJECT

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

The Fall Messier Marathon Guide
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
& dding ubtracting ractions.
Sequential Logic Design
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
1 When you see… Find the zeros You think…. 2 To find the zeros...
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Adding and Subtracting Decimals
27  9 =.
CHAPTER 18 The Ankle and Lower Leg
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Summative Math Test Algebra (28%) Geometry (29%)
2.11.
ASCII stands for American Standard Code for Information Interchange
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
Mental Math Math Team Skills Test 20-Question Sample.
MM4A6c: Apply the law of sines and the law of cosines.
CENSUS DATA 1.POPULATION Total population5.437 million9.856 million Female percentage Intercensal growth percentage Growth.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, DECEMBER 2010.
Progressive Aerobic Cardiovascular Endurance Run
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Addition 1’s to 20.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
1 Damietta Container & Cargo Handling Co. DCHC General overview January, 2012.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
& dding ubtracting ractions.
Select a time to count down from the clock above
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

BELAWAN PORT DEVELOPMENT PROJECT November 2008

GENERAL CONDITION LOCATION This port is very strategic because it is located in the international shipping lane and geographically it’s position in : 03 – 43’ – 00’ LU North Latitude 98 – 42’ – 08’ BT East Longitude Belawan Container Terminal is located at the mouth of Belawan River and Deli River with shipping channel that measures 13,5 km in length connecting the port to the sea in Malacca straits. The port is around 30 km away from Medan, the capital of North Sumatra province, with total area 300.200 m2 Gabion Belawan Container Terminal Situated at the north east of Sumatera island which located approximately 27 km from the centre of Medan, the provincial capital of North Sumatera facing. Malacca Strait, the port of Belawan has steadily grown and become the largest port in Sumatera and the third largest port in Indonesia after Tanjung Priok port in Jakarta and Tanjung Perak port in Surabaya. The port is an integrated international port handling all types of cargo (general cargo, container, bulk etc). Gabion Belawan Container Terminal is the biggest Container Terminal located at Belawan port. In term of total cargo throughput in 2007 GBCT handled 581.378 TEUS,

GENERAL CONDITION ACCESS CHANNEL

GENERAL CONDITION EXISTING Pertamina Jetty kapasitas : 17.000 DWT Container Terminal Tambatan : 850 M’ - Kedalaman : - 10-11 Mlws - C Y : 98.000 M2 Yards : 73.000 M2 C F S : 11.470 M2 Belawan Lama - Tambatan : 602 M’ - Kedalaman : - 5-7 Mlws Passenger Terminal - Internasional : 700 pax - Domestik : 2.450 pax Citra - Tambatan : 625 M’ + 150 M’ Kedalaman : - 5- 8 Mlws - Gudang : 3 Unit Ujung Baru - Tambatan : 1,670 M - Kedalaman : - 9.00 Mlws Pertamina Jetty kapasitas : 17.000 DWT

OPERATION SHIP CALL

OPERATION LOADING / UNLOADING

OPERATION CONTAINER TRAFFIC

PORT DEVELOPMENT CARGO FORECAST

GABION BELAWAN CONTAINER TERMINAL 3

FACILITIES 4 INTERNATIONAL DOMESTIC Berth 500 m 350 m SHIP SERVICES FACILITY INTERNATIONAL DOMESTIC Berth 500 m 350 m Basin Area : 382.500 m2 Depth : 8-10 M.L.W.S CARGO HANDLING FACILITY INTERNATIONAL DOMESTIC Container Yard 105.184 m2 81.402 m2 REEFER PLUGS : 72 Points 4

PORT DEVELOPMENT BELAWAN MASTER PLAN

PORT DEVELOPMENT PHASE SHORT TERM (2008-2012) MEDIUM TERM (2013-2022) LONG TERM (2023-2032) HUB PORT SCENARIO

DEVELOPMENT BACKGROUND Utilizing the Competitive Advantage (Geografic and Hinterland) Developing to be the hub port Growing of container throughput Anticipating the trend of containerization 12

PROJECT PROFILE Name of project : Belawan Port short term Development Project Project cost : US$ 235.758.513,83 Stage 1 : US$ 125.455.456,09 consisting of Under IDB Financing 82,28% Under GOI Financing 17,89% Stage 2 : US$ 233.331.143,69 consisting of Under IDB Financing 79,27% Under GOI Financing 20,78% Executing agency : Ministry of Transportation Location : Belawan, Nort Sumatera Province Project period : 6 (six) years, comprise of ; Stage 1 : 3 (three) years Stage 2 : 3 (three) yaers 13

PHASE OF GBCT DEVELOPMENT PROGRAM 14

GBCT FIRST EXTENSION PROJECT ESTIMATION COST STAGE-I No Description Amount (US$) Equipment 1 Gantry crane 18.183.548,39 2 Transtainer 9.096.774,19 3. Trailer 1.667.741,94 4. Chassis 1.364.516,13 5 Reach stacker 1.010.752,69 Civil Work 1. Dredging 3.732.079,84 2. Reclamation 25.394.806,45 3. Revertment 393,709,68 4. Soil improvement 7.965.204,84 5. Container yard 4.239.946,24 6. Container wharf-14 mlws 17.641.129,03 7. Drainage 107.526.88 8. Road 1.799.650,54 9. Utility 322.580,65 Engineering cost 4.646.498,37 Contigency 18.585.993,49 Value added Tax 9.292.996,75 Total 125.455.456,09 15

GBCT FIRST EXTENSION PROJECT ESTIMATION COST STAGE-II No Description Amount (US$) Equipment 1 Gantry crane 18.183.548,39 2 Transtainer 9.096.774,19 3. Trailer 1.667.741,94 4. Chassis 1.364.516,13 5 Reach stacker - Civil Work 1. Dredging 3.732.079,84 2. Reclamation 25.394.806,45 3. Revertment 393,709,68 4. Soil improvement 7.965.204,84 5. Container yard 4.239.946,24 6. Container wharf-14 mlws 17.641.129,03 7. Drainage 107.526.88 8. Road 1.799.650,54 9. Utility 322.580,65 Engineering cost 4.595.960,74 Contigency 4.595.960,74 Value added Tax 9.191.921,48 Total 110.303.057,74 16

THANK YOU