Collect the data and… Make it Pay! Presented by Andy Gaither, NV Energy Greg Dumas, DST Controls.

Slides:



Advertisements
Similar presentations
© 2006 San Diego Gas and Electric. All copyright and trademark rights reserved. How to fund your Virtualization Project SDG&E 2007 Energy Efficiency Program.
Advertisements

Energy Risk Management Seminar New York April 5, 2001.
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Scottsdale, Arizona May.
Planning for a Low-Carbon Future at San Diego Gas & Electric Rob Anderson Director of Resource Planning San Diego Gas & Electric Western Resource Planners.
Opportunities from ‘Dynamic Demand Control’
1 Providers Perspective on the Future Bill Levis President, PSEG Power Bill Levis President, PSEG Power.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Floridas economic growth owes a lot to air conditioning Population growth, and the economic growth that came with it would have been severely curtailed.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
1 Energy Efficiency and Iowa Utilities Presentation to the Energy Policy Advisory Forum, convened by Governor-Elect Chet Culver January 4, 2007 Presented.
Demand Response May 9, United States 40 Million People 8 States Canada 10 Million People 7 Provinces Cost $6.0 to 10.0 Billion.
December 1, 2003 Bill Parks Office of Electric Transmission and Distribution U.S. Department of Energy Presentation to the Federal Energy Regulatory Commission.
Helping Customers Lower TCO through Flowserves Technology Advantage Helping Customers Lower TCO through Flowserves Technology Advantage Web Portal Web.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
First Solar FuelSmart™: Powering Energy Security
Air-Driven Odor Neutralization Technology Putting dollars on your customers bottom line and giving them eco-bragging rights.
Solar Panels Continued … George Skarbek 9 th July 2014.
Canada and Florida: An Economic Impact Study Presentation to the Metro Orlando Economic Development Commission March 11, 2009.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI Maximization Strategy at Duke Energy Tim Murphy IT Manager.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
SDG&E PI-based Substation Real-Time Condition Based Maintenance System
Terry Chandler Power Quality Thailand LTD PQsynergy 2011 Chiang Mai, Thailand Sept 2011WWW.powerquality.co.th1.
PSE&G Condition-Based Maintenance
TRANSFORMERMONITORING Integrated Solutions. Christian BuchnerAREA SALES MANAGER NORTHERN EUROPE.
Constellation Heating and Cooling Building Automation Systems.
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Field Experience with Ground-Source Heat Pumps in Affordable Low Energy Housing Daniel Ellis President ClimateMaster, Inc. Oklahoma City, U.S.A.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI for Facilities and IT Infrastructure Regional Seminar Series Robert.
When DC professionals collaborate…. The daily miracle of Internet Connectivity.
© 2008 OSIsoft, Inc. | Company Confidential Asset Management, Decision Making and Counter/Condition Based Maintenance at PSE&G Richard Wernsing – PSE&G.
Voltage Management of Low voltage (LV) Busbars Plenary session B – Low voltage operation Dan Randles Quality of Supply and Technical Manager/LCNF Tier.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Optimize Asset Implementation and Availability Using Condition Based Maintenance Tom Hosea, OSIsoft.
Asset Optimization and Condition Based Maintenance
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Data Center & IT Monitoring Use Cases Regional Seminar Series Carolyn.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Regional Seminar Series Houston October 28, 2009 Flowserve’s Technology.
PSE&G Condition-Based Maintenance with OSI Technologies
TIMKEN Bearing Diagnostics and Prognostics Using PI Reducing Unplanned Downtime Rich Browner - Program Manager Reliability Solutions The Timken Company,
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
Transformer Asset Management
The Changing US Electric Sector Business Model CATEE 2013 Clean Air Through Energy Efficiency Conference San Antonio, Texas December 17, 2013.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
Information Technology Division Executive Office for Administration and Finance Springfield Data Center Program Energy Strategy Meeting 9/29/2009.
Energy Trends. 2 Trift bridge 560’ long 333’ high.
Fleet Performance and Reliability in Generation Utilities
2 © 2005 OSIsoft, Inc. – Company Confidential Paul Ireland Manager – Information Engineering, RWE npower Technology Services P I.
Condition-based Maintenance Across the Enterprise
The Smart Grid Enabling Energy Efficiency and Demand Response Clark W
Chicago One N Franklin. 2 Energy Management and Conservation Across a Nationwide Portfolio of Office Buildings Paul Saccone Vice President – Engineering.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
PI at NB Power Presented by Steve Boyko. Introduction About NB Power Our PI history Current PI status Specific PI applications Future PI applications.
Real Time Financial Analysis in Process Plants (Energy and Performance Information System)
BI Marketing Analyst input into report marketing Report TitleElectricity in California Report Subtitle State profile of power sector, market trends and.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Utility Engineers, PC.  Generation  Transmission  Distribution.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
PJM: Managing Grid Evolution Through Markets
HYBRID SYSTEMS renewable energy resources and environment (itec 211)
A Future Oriented Data Platform for the Electric Power Grids
HYBRID SYSTEMS renewable energy resources and environment (itec 211)
Goals of GAMAD Tool for: Minimize Maintenance costs
Electrical Energy Supply System
Presentation transcript:

Collect the data and… Make it Pay! Presented by Andy Gaither, NV Energy Greg Dumas, DST Controls

NV Energy at a Glance Serves 90% of all residences and businesses in Nevada 3.8% Customer CAGR ( ) 54,500 square mile service territory 3,833 line miles of transmission line 5,558 MW of generation (2008) 2008 Consolidated peak demand: 7,151 MW A 14-megawatt solar photovoltaic facility at Nellis Air Force Base. The PV arrays rotate as the sun moves.

Nevada’s Renewable Portfolio Standard Nevada Solar One, a 64-megawatt, solar thermal plant developed by Acciona Energy A Renewable Portfolio Standard is 12% of KW-hour sales increasing to 20 percent by 2015.

NV Energy didn’t ask for a PI system… In today's competitive energy supply market, fundamental business questions are how to: – Obtain maximum performance and best return on investments – Monitor transformer performance under rapidly-changing loads – Safely overload transformer to react to market opportunities – Schedule maintenance based on incipient problem indicators – Optimize transformer remaining useful life and life-cycle costs

NV Energy asked for valuable data ! What they said was.. We want real time monitoring ! – Transformers are crucial to our operation – Periodic inspections & tests are not enough – Oil analysis alone cannot cover many failure modes Show us the data!

Monitoring H and C in real time

H and C signature- Overheating

Opportunity: Real time Gas Analysis Hydran Technology Continuously monitors the evolution of hydrogen and carbon Dissolved gas Level, Temperature Dissolved gas Level Hourly Trend Dissolved gas Level Daily Trend Relative Humidity H2O PPM Level H2O PPM Hourly Average Dissolved gas Sensor Temp Baseplate Temperature Heater Power System Fault Alarm

Data Too Much PI with DNP 3 Collecting the data Buchholz Gas Accumulation Reserve Tank Level Top Oil Temperature Cooling Fan/Pumps Condition OLTC Tap Position OLTC Temperature Humidity and Dissolved Gas Bottom Oil Temperature Power Supply Hydran + M2 Load Current & Voltage Bushing Leakage Current Ambient Temperature

Implementing Real time monitoring Before we arrived: Transformer oil measurements recorded on paper forms, stacked high on engineer’s desk After four days: Plant operator glanced at screen to check transformers

Two weeks later… Plant operator noticed Hydran gas level was not stabilizing The step jump reflects scaling correction.

Three Months later… Plant operator noticed Hydran gas level was not stabilizing Continued Rising Gas Level

Stepped up Lab Testing… Validated gassing behavior observed with Hydran

Eight Months later… Deployed online gas purifier Mini-Outage

What Value did we produce? A month later: – One transformer showed a constant slow rise in Hydran reading – Data eliminated load fluctuations and weather related causes – We discovered a transformer with a problem ! Repair performed while transformer operational – Power outage avoided – Payback time for PI system: 45 days

Cleaning oil AND producing power !

Transformer Incident converted to preventive maintenance action Replaced “management by spreadsheets” with real-time, user generated reports Converted a potentially large and costly IT project into several inexpensive integration projects. What Changed at NV Energy

Where to from here… Equipment Age Profile Transformers, Breakers, Relays What do you do when you have:  Aging assets  Expected to be in service all the time  Can’t be replaced at will You increase service life ! You implement Conditions Based Maintenance

CBM - one user’s estimate of saving $264,600 – 9 LTC ’ s and 2 GCB ’ s $800,000 – 5 Transformers 2005 & 2006 > $1M Notification $300,000 – Oil Diagnostics targeted 16 LTC ’ s, 5 had contact problems $1.2M – 5 Transformers were targeted and 2 were identified to have major issues – 10 LTC ’ s were targeted and 1 had the potential to create major damage & 2006 > $2M Assessment Note: Data courtesy of PSE&G

Real Time Asset Monitoring – Phase 1

Phase 2: CBM Platform Real-time Rule Assessment (PI ACE) Alert Notification (RtAlerts) Work Order Generation (RLINK) Asset Reliability (PI OLEDB and RtReports) Integrated Asset Information (RtWeb Parts) Asset Information Structure (PI and RDB) Improve Reliability

Asset Monitoring Result Corrective Maintenance Failures Projected Savings

Transformer Incidents converted to preventive maintenance actions Plant engineers can assess operating situations without becoming computer experts. Replaced “management by spreadsheets” with real-time, user generated reports Conclusions:

What surprised us… Many small CBM projects are Easier to justify and purchase Less specification cost Less cost to vendor to learn site specifics- i.e. “on-the-job” training. Easier to execute than a single big CBM project

Thanks GE Energy PSE&G provided the Aging Asset Economic Analysis. PSE&G currently serves about ¾ of the population of New Jersey across a 2,600 square mile service area. SDG&E San Diego Gas & Electric Leaders in OSIsoft RtCBM Architecture

Questions?

CBM Architecture Maintenance Overview Site Detail Site Detail Asset Detail Rule Detail Asset Detail Site Detail Level 1 Level 2 Level 3 Level 4

CBM Overview – Level 1 Screens

Site Detail – Level 2

Asset Detail – Level 3

Rule Detail (PI) – Level 4

Asset Reliability Report

Questions?