CERN IT Department CH-1211 Genève 23 Switzerland www.cern.ch/i t The Wigner Data Centre An Extension to the CERN Data Centre.

Slides:



Advertisements
Similar presentations
IT Service Continuity Management
Advertisements

1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
ELECTRONIC DATA COLLECTION SYSTEM Howard Hamilton.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 Introducing the Specifications of the Metro Ethernet Forum.
International Telecommunication Union Accra, Ghana, June 2009 Conformance and Interoperability Testing: (WTSA-08) Resolution 76 Joshua Peprah Director,
FORUM ON NEXT GENERATION STANDARDIZATION (Colombo, Sri Lanka, 7-10 April 2009) A Pilot Implementation of an NGN Dual Stack IPv4/IPv6 network for MEWC,
CURRENT SITUATION OF E-HEALTH IN MYANMAR Nang Kham Oo Leik Central Womens Hospital
Copyright © 2012 California Department of Education, Child Development Division with WestEd Center for Child & Family Studies, Desired Results T&TA Project.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 Child Care Resource and Referral (CCR&R): FY 13 Contract Renewal Proposal Summary Presentation January 2012.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Data & Storage Services CERN IT Department CH-1211 Genève 23 Switzerland t DSS CASTOR Status Alberto Pace.
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
ZMQS ZMQS
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
Ukraine, Кyiv, 2013 Presentation of LLC SERVICE-NS: Reliable and uninterrupted technical service of filling stations and petroleum storage depots, providing.
Data & Storage Services CERN IT Department CH-1211 Genève 23 Switzerland t DSS Bit preservation cost outlook: Cost for 10, 20, 30 years archive.
Richmond House, Liverpool (1) 26 th January 2004.
Company Name PRESENTATION NAME Compilation and Dissemination of Energy Statistics International Workshop on Energy Statistics, Beijing, Sep 2012 International.
IP Phones deployment Rodrigo Sierra.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
Monitoring and tender procedures for infrastructure projects Baltic Retreat 2013 Federal Department of Foreign Affairs FDFA Swiss Agency for Development.
Effective Engineering April 2002, Burbank, CA 1. Effective Engineering April 2002, Burbank, CA 2.
Office Alterations RAF/2012/00027 Compulsory Briefing Session 01 October 2012 RAF – EcoGlades Centurion.
Dummy Dealers welcome !. euroCADcrete Step 1: General data euroCADcrete: Educational software according EC2.
Khammar Mrabit Director Office of Nuclear Security
Department of Information Technology Billing System (TUAM) Project Close Eric Aragon 22 April 2013.
Department of Information Technology SHARE New Architecture, Hardware, Disaster Recovery, and System Upgrade Project Update SHARE Service Manager – David.
Department of Information Technology Billing Project Implementation Certification Request Dave Dikitolia
The Barclays Premier League EPPP Consultations The Football Association Advanced Youth Award. ‘Long Term Player Development’ (LTPD) ‘The 4 Corners’
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Ohio Planning Conference Organizing for Reliability – A State Perspective.
RMDCN status & plan,February Agenda  RMDCN Configuration  RMDCN Next Generation  Migration.
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
In partnership with Lead Schools Induction Training Event 27 and 28 th November 2013 Pauline Marson Mark Lancett CfBT.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
Chapter 11: Systems Development and Procurement Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter
Weekly Attendance by Class w/e 6 th September 2013.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
(preliminary – demos open for discussion) Wolfgang von Rüden, CERN, Geneva July 2009 Geneva, Palexpo, 5-9 October 2009 July 20091Wolfgang.
CERN IT Department CH-1211 Genève 23 Switzerland t Options for Expanding CERN’s Computing Capacity Without A New Building Medium term plans.
IT Department 29 October 2012 LHC Resources Review Board2 LHC Resources Review Boards Frédéric Hemmer IT Department Head.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Remote Hosting First Experiences Wayne Salter (with input.
CERN IT Department CH-1211 Genève 23 Switzerland t The new (remote) Tier 0 What is it, and how will it be used? The new (remote) Tier 0 What.
THE WAY TO YOUR OWN INDEPENDENT OPEN-FIBRE NETWORK.
CERN IT Department CH-1211 Genève 23 Switzerland t 24x7 Service Support Tony Cass LCG GDB, 24 th November 2009.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
CERN - IT Department CH-1211 Genève 23 Switzerland t High Availability Databases based on Oracle 10g RAC on Linux WLCG Tier2 Tutorials, CERN,
CERN - IT Department CH-1211 Genève 23 Switzerland t IT Dept Presentation [September 2009] - 1 User Support - Future Changes in Policy and.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter HEPiX May 2011.
CERN IT Department CH-1211 Genève 23 Switzerland t SL(C) 5 Migration at CERN CHEP 2009, Prague Ulrich SCHWICKERATH Ricardo SILVA CERN, IT-FIO-FS.
CERN - IT Department CH-1211 Genève 23 Switzerland CERN - IT Department CH-1211 Genève 23 Switzerland Request and Incident.
CERN Data Centre ‘Building 513 on the Meyrin Site’
HSE rules & regulations
Remote Hosting Project
Presentation transcript:

CERN IT Department CH-1211 Genève 23 Switzerland t The Wigner Data Centre An Extension to the CERN Data Centre

CERN IT Department CH-1211 Genève 23 Switzerland t CERN Open Days Why is an Extension Needed? To meet the ever increasing needs of the experiments, CERN needs to augment the resources available in its own Data Centre. Furthermore, the addition of a remote centre allows CERN to implement critical services at both sites, allowing to provide these services even in the case of a major incident at one or other of the sites.

CERN IT Department CH-1211 Genève 23 Switzerland t Where is it Located? CERN Open Days At the Wigner Research Centre for Physics in Budapest, Hungary. Budapest airport Central Budapest Budapest

CERN IT Department CH-1211 Genève 23 Switzerland t Why was Wigner Chosen? The Wigner Data Centre was chosen after a tender open to all 20 CERN Member States. 17 responses were received from 9 different countries. The Wigner Data Centre bid was evaluated to be the most competitive compliant offer. The contract was adjudicated by CERN in favour of the Wigner Data Centre in March CERN Open Days

CERN IT Department CH-1211 Genève 23 Switzerland t How is it Operated? The Wigner Data Centre is being operated as a logical extension of the CERN Data Centre. The servers belong to CERN and are being operated by CERN. All software installation, configuration and monitoring is being done remotely from CERN. The Data Centre facilities are being operated by Wigner. The Wigner Data Centre staff are responsible for physical installation and repairs. CERN Open Days

CERN IT Department CH-1211 Genève 23 Switzerland t How are the 2 sites connected? The sites are connected by 2 independent 100 Gbps circuits. CERN Open Days

CERN IT Department CH-1211 Genève 23 Switzerland t What is its Capacity? Currently the installed capacity at the Wigner Data Centre is a bit less than 10% of that installed at CERN. Over the potential 7 year contract, the installed capacity at the Wigner Data Centre will be gradually increased to a level similar to that of the CERN Data Centre. The majority of the capacity will be used for physics data processing with about 15% of the capacity used for critical services and business continuity purposes. CERN Open Days

CERN IT Department CH-1211 Genève 23 Switzerland t Brief History Contract signed in early May Construction started in late May First IT equipment installed in January Wigner Data Centre officially inaugurated in June 2013 by the Prime Minister of Hungary in the presence of the Director General of CERN. CERN Open Days

Construction Video CERN Open Days

CERN IT Department CH-1211 Genève 23 Switzerland t The Completed Wigner Data Centre CERN Open Days

CERN IT Department CH-1211 Genève 23 Switzerland t The Completed Wigner Data Centre CERN Open Days

CERN IT Department CH-1211 Genève 23 Switzerland t Acknowledgements CERN IT would like to thank: The Wigner Research Centre for Physics and Persecutor Systems for their help in producing this presentation. CERN Open Days