Dauphin Island in Crisis A Proposal for Restoration of the P&BB Fishing Pier & Interim Shoreline Stabilization Working to Restore the Public Pier & the.

Slides:



Advertisements
Similar presentations
PUBLIC WORKS DEPARTMENT MILLS ROAD PAVING MSBU PUBLIC HEARING October 30, 2007 PUBLIC WORKS DEPARTMENT MILLS ROAD PAVING MSBU PUBLIC HEARING October 30,
Advertisements

MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
1. 2 PERCENTAGE FOR IACHR IN THE OAS 2009 BUDGET (US$ 3,746,100)
Westland-Ramos Fish Passage and Habitat Restoration Project BPA Project No September 23, 2004 Westland Irrigation District.
Metropolitan Transportation Authority July Financial Plan Metropolitan Transportation Authority July 27, 2005 MTA 2006 Preliminary Budget July.
Jeopardy Topic 1Topic Q 1Q 6Q 11Q 16Q 21 Q 2Q 7Q 12Q 17Q 22 Q 3Q 8Q 13Q 18Q 23 Q 4Q 9Q 14Q 19Q 24 Q 5Q 10Q 15Q 20Q 25.
0 - 0.
Waves and Wind Shape Land
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
Addition Facts
Carmel River Lagoon Update A presentation to the Carmel Point and Lagoon Preservation Association Monterey Peninsula Water Management District Status of.
Treasure Map By: Gage Gwin Haven Beagle START. Step 1 23 tiles south CONTINUE.
Hannover, 14th November 2008 UEVP GA Hungarian Veterinary Chamber From establishment…. to an active European professional body.
Copyright © 2007 Pearson Education, Inc. Slide 4-1.
Copyright © Cengage Learning. All rights reserved.
Funding, Regulatory, and Private Property Right Issues Encountered by a Small Coastal Community 1.
Coastal Erosion Planning and Response Act (CEPRA) Program
Cruz Bay Waterfront Plan
Open access policies in Norway Frode Bakken Birzeit 26th of May 2009.
Research Department 1 Global Economic Crisis and the Israeli Economy Herzliya conference Dr. Karnit Flug Research Director, Bank of Israel February 2009.
FM Area Diversion International Legislators Forum June 27, 2014 Keith Berndt PE Cass County ND Administrator.
Squares and Square Root WALK. Solve each problem REVIEW:
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
Managing Development in the Coastal Zone, Federal Policy II: Coastal Zone Management Act; Slide 29.1 Session Name: Managing Development in the Coastal.
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Addition 1’s to 20.
Name ____________________ Date ___________ Period ____.
Test B, 100 Subtraction Facts
Week 1.
Chapter 3 Mathematics of Finance Section 3 Future Value of an Annuity; Sinking Funds.
Solve an equation by multiplying by a reciprocal
Louisiana Coastal Erosion. The problem LA contains approximately 40% of the nation's wetlands and experiences 80% of the nation's coastal wetland loss.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.
Harry Williams, Geomorphology1 SHORELINE EROSION AT MAD ISLAND MARSH PRESERVE. Mad Island Marsh Preserve is a 3,148- acre tract containing the east arm.
1 The Grain Drain Boston New York Washington, DC Miami Dune areas on the continental shelf caused by breaking waves are called sand bars. Waves pile up.
A Coastal Barrier Protecting the Houston/Galveston Region from Hurricane Storm Surge Center for Texas Beaches and Shores Texas A& M University at Galveston.
Civil Works Baltimore District River and Harbor Projects.
Island County SMP Shoreline Residential Development Workshop December 5, 2011.
People Pressure on Shorelines Shorelines – The Human Factor.
1 Great Lakes Maritime Task Force 14th Annual Informational Briefing for the Great Lakes Delegation Tom Buck, C.E.O. Carmeuse Lime and Stone April 2, 2009.
Coastal erosion is the wearing away of land or the removal of beach or dune sediments by wave action, tidal currents, wave currents. Costal erosion is.
Controlling Constructive and Destructive Forces
Of An Evaluation of Performance Measures for Prefabricated Submerged Concrete Breakwaters: Section 227 Cape May Point, New Jersey Demonstration Project.
BRYSON ISD Proposed Budget and Tax Rate Prepared by David Stout, Bryson ISD Superintendent.
BRYSON ISD Adopted Budget and Tax Rate Prepared by David Stout, Bryson ISD Superintendent.
Shore Protection Act (O.C.G.A , et seq.) Karl BurgessApril 5, 2011 Photo of Choice.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
Coastal Property Damage Mitigation Risk Assessment GEOL 4093.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Sand Dollars Federal Shore Protection Appropriations
CDP Morehart 2808 Lafayette Avenue Newport Beach.
Florida Inland Navigation District (FIND) Capabilities and Potential Assistance for Muck Removal in the Indian River Lagoon (IRL) System.
Inlet Barrier Island OCEAN SHORE ZONE Estuary Beach.
Millions of dollars’ worth of real estate and the accompanying ad valorem and Accommodation taxes lost year in and year out. No protection for other existing.
Charlotte County Beach Funding Plan
Effects of Waves: Beach Erosion
Joseph T. Kelley Walter A. Anderson
Nourishment, Groins, Seawalls, Breakwaters, Jetties.
Inlet Barrier Island OCEAN SHORE ZONE Estuary Beach.
Effects of Waves: Beach Erosion
Prepared by David Stout, Bryson ISD Superintendent
Shorelines.
The Grain Drain ME Dune areas on the continental shelf caused by breaking waves are called sand bars. Boston Waves pile up large deposits of ocean sand.
Effects of Waves: Beach Erosion
Shorelines.
Shorelines.
Presentation transcript:

Dauphin Island in Crisis A Proposal for Restoration of the P&BB Fishing Pier & Interim Shoreline Stabilization Working to Restore the Public Pier & the Gulf-front Public Beaches A Presentation from the Dauphin Island Restoration Task Force

2 Problem # 1: Sand-Locked Fishing Pier

3 No more revenue from pier Pier Revenue Oct Sep 2006$97,796 Oct Sep 2007$68,514 Oct Sep 2008$3,497 Oct 2008$46 Nov Sep 2009$0

4 Problem #2: Rapidly Vanishing Shoreline app. 150 feet of beach width (app. 100 feet of that was PUBLIC BEACH) March 2009January feet of beach width left (and the erosion continues) No major hurricanes during this 9-month period. Erosion this rapid has no precedent in recent history.

5 The Solution (Part 1): Free the Pier

6 The Solution (Part 2): Stabilize the Shoreline

7 Proposed Project Dredge sand from PBB Fishing Pier and deposit it on the Gulf- side shoreline where public beach areas have eroded. Solves two problems simultaneously: 1. Removes unwanted sand from pier area –Restores the PBB fishing pier to an operative condition as a recreational fishing venue –Re-establishes lost revenue for the PBB and the Town of Dauphin Island –Restores the habitat quality of Pelican Island by eliminating foot traffic access by humans, pets and predators 2. Deposits desperately needed sand in crisis areas –Helps to mitigate the severe erosion affecting the most “in- crisis” areas on the Gulf-side shoreline –Initial steps toward restoring submerged public beach areas –Homes will be saved

8 Interim Shoreline Stabilization: Proposed Phases & Funding 1.Phase 1 –Dredge sand from under fishing pier, pump or dump onto eroded Gulf-side public beach areas –Finance with DIPOA-Corps settlement funds + GoMESA gas royalty funds (no taxpayer dollars) 2.Phase 2 –Pump/dredge sand from north shore and/or get Corps to start dumping channel-dredged sand closer to island –Finance with CIAP gas royalty funds (no taxpayer dollars) 3.Phase 3 –Dr. Douglass’ long-term plan (details unknown at present) –Funding source to be determined

9 Phase 1: Sand Source (proposed) Present Past (and Future)

10 Phase 2: Sand Source 1 (proposed) Some sand could be harvested from the West End north shore where massive overwash “sand fans” have land-locked private fishing and boating piers. Note that land ownership has not changed. The south shore submerged lots, in their original dimensions and locations (e.g., a 100 ft. x 100 ft. lot at a point 200 ft. south of the road) are still owned by the deed-holders, who continue to pay property taxes on the lots even though submerged. Likewise, the north shore lots retain their original deeded dimensions. The overwash sand has not legally increased the size of the north shore lots.

11 Phase 2: Sand Source 2 (proposed) Diagram from the 1978 Corps of Engineers report on the effects of ship channel dredging If channel-dredged sand was deposited closer to the island, sand would migrate naturally onto the beaches. This could serve as an on-going beach renourishment and maintenance program.

12 Interim Solution Implementation (proposed) 2004 tide lineFeb 2010 tide line 2009 tide line Restoration Phase 1 (sand from fishing pier) Restoration Phase 2 (sand from north shore and/or channel-dredged sand dumped closer to island) (approximations)

13 Help us bring back the public beaches for everyone

14 Help us bring back the fishing pier