Lessons Learned Focus Areas Deployment drill design Multi-plan holder/GRP deployments Lessons Learned for Industry Initial assessment/Safety Brief Weather/other.

Slides:



Advertisements
Similar presentations
Planning Your web content
Advertisements

Implementing a Behavior Based Safety Process at Rockwell Automation
ProfessionalValues and Practice Look for differentiation. Monitor lesson plans (planning links). IEPs used Short evaluations should be encouraged (and.
Training activities administration and logistical support
SELF EVALUATION CHECKLIST The purpose of this self evaluation checklist is to help improve as a USATF or OSHAA official. Remember as you work events you.
Site Visit Review Just-in-Time Training. Pre-work and Training Judging Examiner Evaluation Process Stage 1 Independent Review Stage 2 Consensus Review.
Welcome to SIOP 2! Learning Target:
INSE - Lecture 15  SE Project Management  This lecture is a brief overview –  mainly things to remember to do!
TITLE DATE 1 Day to Discover Sailing Day. Congratulations, tomorrow you will host your Club’s Discover Sailing Day Take a walk around your club and ensure.
TITLE DATE 3 Days to Discover Sailing Day. In only three days all your consistent and careful planning over the past months will pay off. Now is the time.
Through Instructional Rounds
SAFETY OF URBAN ROOFTOP WIND SYSTEMS Bruce Lipscombe I Want Energy Pty Ltd.
ALO Planning & Assurance Requirements
Northwest Area Contingency Plan & Geographic Response Plan Presented By: Department of Ecology Linda Pilkey-Jarvis.
Geographic Response Plans (GRP) 2009 Updating the Grays Harbor GRP Harry Chichester Washington State Department of Ecology.
INCREASED CRUDE BY RAIL PART 1: ASSESSING THE RISK.
1 Recognition Assessment Questions Answered. 2 What is Recognition Assessment? It is not an exam or test. It looks at the candidate’s industry skills.
Leading Teams.
Copyright – Disaster Resistant Communities Group - How To Conduct A Fire Drill.
Drills in 2014 Elin Storey Spills Program Drill Coordinator.
Maine CACFP Website Program Information - by type Resources Forms
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
Logistics: How to Set up and Manage a Project. Logistics The aspects of an operation that deal with the procurement, distribution, maintenance, and replacement.
AFFORDABLE MULTI-FAMILY HOUSING ORGANIZATIONS CREATING A DISASTER RESPONSE STAFFING PLAN THROUGH ADOPTION OF ICS Presentation to the Learning Collaborative.
Copyright – Disaster Resistant Communities Group - Drill Overview.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Destination Research. Revision - Elements of a Tour Transportation Lodging Dining Sightseeing/guide service Attractions Shopping.
Safety Auditors Conference 2005 A Practical Approach…….
Functional Tabletop and Worst Case Drills in 2014 Commander Katie Blanchard Sector Puget Sound & Elin Storey Ecology Spills Program Drill Coordinator.
HBR Best Practices Seminar Presented by CertifiedSafety Brady’s Landing June 30, 2005.
Conducting Waste Assessments North Carolina WasteWise Program Hands-On Training May 17, 2000 Department of Correction Raleigh, NC.
Welcome 2011 California Statewide Medical and Health Exercise.
A guide to... Safe Systems of Work.
2009 Festival & Events Seminar ”Re-Invention for Changing Market Needs” Festival Operations Who, What, Where, When, How & Why? Presented by Michael Saiz.
People in Business Unit Two Unit Two 5307 ONE medium to large company to be used FIVE “themes” to be covered Avoid generic information Candidates.
UNMANNED AVIATION QUALIFICATION FLIGHT SKILLS TEST BRIEFING UAVAirways Limited | Registered in England No: | UAQ Skills Test v1.0.
Maine DEP Division of Response Services Peter Blanchard, Director Division of Response Services Maine Department of Environmental Protection MAINE DEPARTMENT.
Safe Systems of Work. Legislation w HSWA Section 2 (2) (a): Provide and maintain plant and systems of work that are, so far as is reasonably practicable,
Design and operate lighting for a stage production Unit Standard16431 Verson:2 Credits6.
Brian Parr- The University of Georgia. Lesson Planning Efficient use of time Curriculum alignment Document systematic approach to instruction.
2014 Accreditation Updates Our mission: HIPPY partners with parents to prepare their children for success in school.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
Flood awareness campaign 2006/7 – 2008/9 Sarah Junik David Faichney.
Health Safety and Preparedness.  Identify the resources required to develop and maintain a safe and prepared workplace  Understand the key roles and.
Unit 9- Conducting Diving Activities Unit 9: Conducting Diving Activities Overseeing Dives Dive briefings and debriefings Overseeing Boat Dives Overseeing.
Sally Lyon and Staff August 26, OPERATING REVENUES AND OTHER INCOME BUDGET FY 2016.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Traffic Management Rok Safety Seminar The statistics Why do accidents occur What is workplace transport The problems Possible solutions Worked examples.
UNMANNED AVIATION QUALIFICATION FLIGHT SKILLS TEST BRIEFING UAVAirways Limited | Registered in England No: | UAQ Skills Test v1.0.
Session Two March Sharing Experiences n In your team, share your experiences trying out the strategies shared in February in your own classroom.
Events Planning and Organisation Event Management.
OPRC Level 3 The Contingency Planning Process. OPRC Level 3.
Stephen M. Powell, MS Principal, Managing Partner
Site Planning & Power Supply
DESIGNING A LOGO.
How to Prepare for an Engineering Career Fair
The European CAF external feedback procedure - Webinar Lessons learned
Year Round expectations and responsibilities of the site principal
National Boating Safety Hands-On “ON-WATER” Education
Training & Exercises Testing the plan This process is scalable.
Temporary Works Co-ordination
Module 8 CD-JEV immunization campaigns
Being a Coach Practical Lesson 1.
HSE Tips for Site / Field Visit
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
CQ2 – What are the planning considerations for improving performance?
Traffic Management Rok Safety Seminar 2007.
RESAP for The Tree Minded
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

Lessons Learned Focus Areas Deployment drill design Multi-plan holder/GRP deployments Lessons Learned for Industry Initial assessment/Safety Brief Weather/other problems

Deployment Drill Design 100% of deployments designed with us 100% of plan holders had 2 deployments Plan holders need to register combined TTX and DPX each separately, within the TTX deadline (60 days). Planning with stakeholders during design was key! - Tribes, WDFW, Local Governments

Lessons Learned for Industry PRCs’ & plan holders should do outreach to prepare for deployments – tribes, landowners etc. Be aware of fishing/recreation seasons, access to beaches and properties. Still seeing forms used in drill not found in contingency plan. Use plan forms for full credit. Checklist items must be observed by an evaluator. Pre-boom drills and GRPs deployed in a location we can’t observe won’t count for credit.

Lessons Learned for Industry For larger drills we sent more than one evaluator. Sometimes extra space on boats was an issue. Industry controller/Person in Charge can coach staff but not “walk” them through the entire drill. Drills test a variety of plan holder staff knowledge and readiness. Plan holders need to direct PRC’s to perform actions, not ask evaluators if “this is done” or adequate. Plan holders that trained with PRC’s ahead of the drill had much better success.

Multi Plan-holder/GRP Deployments 2 MSRC shipper drills: Vendovi (GRP), Freshwater Bay (Skimming) 2 Harbor Island Drills (Shell, Maxum, BP, KinderMorgan Worked with industry on several ad-hoc strategies Some worked, some did not. That’s OK!

Initial Assessment/Safety Brief Theme of pushed heavily in drill design Plan holders using forms from contingency plan had more success Confusion between “logistics” safety brief and “spill” safety brief This item is cumulative, so remember to cover all items for full credit, and use them in the briefing.

Weather/Other Problems Several drills were canceled due to weather It’s okay to be safe, call drill team to reschedule Equipment maintenance – check condition before day of drill Plan holders/PRCs should bring enough equipment to deploy GRPs as written – anchors, line etc.

Ad Hoc Strategies some worked, some didn't.

Revised strategy New robust ad-hoc strategies with skimming components

Shore side Storage On water storage

New Strategies Tested

Coordinate with drill team, we’ll do site visits!