My School District Does Not Have PCB Fluorescent Light Ballasts

Slides:



Advertisements
Similar presentations
Florida Department of Environmental Protection October 28, 2011 | 1 What to Expect from a Hazardous Waste Inspection Central District Debby Valin, Environmental.
Advertisements

Municipal Solid Waste Landfill NSPS/EG Requirements Illinois EPA Bureau of Air Mike Davidson 217/
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
The TSCA is a United States law, passed by the United States Congress in 1976, that regulates the introduction of new or already existing chemicals. The.
Department of Environmental Protection CLEAN FILL POLICY
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Lead-Based Paint Renovation, Repair, and Painting Rule Overview of RRP Rule EPA Region 8 ************ Jim Maley.
Getting to the Source of PCBs: Fixing TSCA Presented by Rick Eichstaedt March 26, 2013.
1 What is a Universal Waste?. 2 Universal Waste is universally generated.
Environmental Compliance and Technical Assistance for Auto Service Professionals -- RCRA C Hazardous Waste Victoria North Toxic Substances Division Hazardous.
Hazardous Waste Section
FAA Office of Airports Airport Fuel Storage and Handling
Certification of Compliance By Evita Lagard
1 DELAYED LAST STATE AID - BORROWING PROCESS
HITECH ACT Privacy & Security Requirements Cathleen Casagrande Privacy Officer July 23, 2009.
Jim Rudeen Waste Reduction, Compliance and Enforcement Section Chief KDHE, Bureau of Waste Management
HAZARDOUS WASTE.
Smithfield 2012 Environmental Conference
PCB Workshop No. 2 Presented By; Oregon Department of Energy
Trisha Summerfield MiKayla Wellman Fourest Savel Rylee Treat.
PCBs in Building Materials
1 School Bus Drivers Inservice Intrastate: You are restricted to drive inside the state Interstate: You may drive outside the state Self- Certification:
Key Federal Reporting Requirements Material/ Statute RegulationsIncidentReport to/byReporting Air Emissions (Clean Air Act) 40 CFR 63.10(d)Start up, shutdown.
The Toxic Substances Control Act (TSCA)
Oregon State Department of EnergyConference Daniel Duncan, EPA Region 10 PCB Program Manager November 5, 2003.
Oil-Filled Electrical Equipment (OFEE) and Other Materials Containing
PCB - What You Need to Know Presented by:  Darren Lee  Environmental Control Corp., Project Mgr.,  Industrial Hygienist  Previous West Linn- Wilsonville.
BMPs & Bucks Preventing PCB Contaminated Used Oil Northwest NAHMMA Conference June 2014.
CE/Geol/ChE 174 Hazardous Materials Transportation of Hazardous Waste Christopher Vais
Jennifer Downey, Enforcement Officer US EPA Region IX, RCRA Enforcement Office.
WELCOME: EPA PUBLIC MEETING
Polychlorinated Biphenyls (PCBs) Toxic Substance Control Act Environmental Compliance Assistance Workshop September 13 th, 2005 Raj Aiyar (404)
UNIVERSAL WASTE SAFETY TRAINING CLASS. AGENDA Identifying Universal Waste Identifying Universal Waste Universal Waste Handlers Universal Waste Handlers.
Best Management Practices for Used Oil Collection Programs NAHMMA Conference June 2015.
Waste Management Overview & Land Disposal Restrictions.
COMMITMENT & INTEGRITY DRIVE RESULTS Risk Based Corrective Action Using site-specific risk assessment to achieve Regulatory Closure.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY A&WMA Southern Section 2007 Annual Meeting August 10, 2007.
Air & Waste Management Assoc. August 6, 2008 Region 4 RCRA Division Ken Lapierre, Deputy Director.
TCEQ Environmental Trade Fair
Environmental Regulations. Learning Objectives TLW understand the history of environmental regulations TLW be able to describe key content of environmental.
Tier I: Module 5 CERCLA 128(a): Tribal Response Program Element 4: Verification & Certification.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
PCB Ballast Workshop November 5, Sponsers Klamath Falls SD West Linn - Wilsonville SD EPA Oregon Department of Energy Clackamas ESD (host site)
HANNAH WALKER RESOURCE CONSERVATION AND RECOVERY ACT.
By Michelle Hoang Period 2 APES April 30, 2012 The Toxic Substances Control Act of 1976.
Metro Household PCBs Program Juan L. Garcia Hazardous Waste Technician Metro, Portland, OR Northwest NAHMMA Conference, 03 June 2015.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Resource Conservation and Recovery Act (RCRA) Draft Year: 1976 (drafted as an amendment to the Solid Waste Disposal Act.) Amendment years: 1984(HSWA, Hazardous.
RCRA Expert Brownbag Series: PCBs 101
Hazardous Waste Management Legislation RCRA – Resource Conservation and Recovery Act Regulate management and disposal of wastes currently being produced.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Understanding EPA RRP Presented by:. EPA has issued a final rule under the authority of Section 402(c)(3) of the Toxic Substances Control Act (TSCA) to.
Hazardous Waste Import-Export Final Rule Requirements and Implementation December 12, 2016.
Air & Waste Management Association
Missouri Department of Natural Resources
Best Management Practices for Used Oil Collection Programs
Lecture (13): Hazardous Waste Management
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
PCB Roving Training 2000 The Gas Company Sempra Energy 10/27/2000
Westbrook Contractor Safety Training April 5, 2018
Georgia Update Jeff Cown Land Protection Branch
The Toxic Substances Control Act of 1976 (TSCA)
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
Hazardous Waste Management
2018 Environmental Trade Fair Shannon Gibson
Presentation transcript:

My School District Does Not Have PCB Fluorescent Light Ballasts Things You Should Know Questions to Ask Yourself

What Does That Mean? Terms Toxic Substance Control Act TSCA We say Toss-ka Resource Conversation and Recovery Act RCRA We say Rick-rah

District Building Built Before 1980 I removed our PCB Fluorescent Light Ballasts - In the early 1990s as part of an energy upgrade Removed the ballasts after West Lynn/Wilsonville School District cried out! You read EPA’s letter to the Superintendent, dated February 15, 2000, and did not want EPA to penalize your District I just woke up one day and thought it was a good idea Other reasons

Disposal Records If You removed leaking PCB ballasts you must have - A TSCA Identification Number TSCA Form 7710-53 – Not RCRA Form 8700-12 You have hazardous waste manifests for all shipments to off-site disposal facilities You have confirmation samples to show you cleaned up all spills You disposed at an approved incinerator You have a certificate of disposal You must retain records for 3 years (from July 1 of the following year)

Disposal Records If you removed intact ballasts with PCBs in the potting compound and/or PCBs in the surface paint of the ballasts- You have a TSCA Identification Number TSCA Form 7710-53 – Not RCRA Form 8700-12 You have hazardous waste manifests for all shipments to off-site disposal facilities You disposed at an approved incinerator, or You disposed at an approved TSCA landfill You have a certificate of disposal You must retain records for 3 years (from July 1 of the following year)

Disposal Records My District does not have all of those documents Your District is in violation of the TSCA Subject to penalties up to $27,500 for each violation

Prohibitions Now that you removed your PCB ballasts, what is EPA looking for – 1) PCB spills inside light fixtures These are high risk spills to students in your schools 2) A plan to clean up these spills Remove the risk to students

40 CFR § 761.20 Prohibitions and Exceptions No persons may use any PCB, or any PCB Item regardless of concentration, in any manner other than in a totally enclosed manner within the United States unless authorized by regulation or EPA approval.

§ 761.20 Prohibitions and Exceptions There is no authorization for PCBs as a coating on light fixtures, and no authorization for PCB spills EPA wants to insure that schools do not have PCBs in the light fixtures or on any surfaces in schools

OOPS!

Spill Clean Up If you do not have proof of clean up You must do a site assessment of your buildings Must notify EPA Regional Office “Self-implementing” remediation plan (Clean-up plan 30 days prior to the clean-up project) Dispose of clean-up material at an approved incinerator (use a hazardous waste manifest) Post confirmation sampling of the fixture, or spill location Submit a closure report to the EPA

Spill Clean Up Things to look for in your site assessments Tar like material inside or outside the fixtures Smokey material on the fixtures Brown molasses-like material on the fixtures

PCBs were 125,000 ppm

PCBs were 70,000 ppm

PCBS were 270,000 ppm

OUCH!

Spill Clean Up Spills from leaking fluorescent light ballasts If you discover a spill in a fixture after 12/1998 Must notify EPA Regional Office “Self-implementing” remediation plan (Clean-up plan 30 days prior to the clean-up project) Dispose of clean-up material at an approved incinerator (use a hazardous waste manifest) Post confirmation sampling of the fixture Submit a closure report to the EPA

Reminder Your “Self-implementing” remediation plan must address – When the clean-up project will start (Notify EPA 30 days before you start) What buildings are covered by the project What level of clean up you will achieve Who will be doing the clean up

Reminder Your “Self-implementing” remediation plan must address – continued How will the clean-up material be disposed When will the project be completed

Reminder After the project is completed Submit report to EPA Map of spill locations Final or confirmation sample results of clean up Shipping documents for the disposal of the clean-up debris Hazardous waste manifest Certificates of Disposal

Questions Contact EPA Region 10 EPA Web page of forms TSCA Hotline http://www.epa.gov/pcb/data.html TSCA Hotline 202-554-1404 or E-mail at: tsca-hotline@epamail.epa.gov Region 10 1-800-424-4EPA

Questions Alaska, Idaho, Oregon, Washington Dan Duncan - Regional PCB Coordinator - phone - (206) 553-6693 Bernie Pribish - phone - (206) 553-5293 Ray Nye - phone - (206) 553-4266 Bruce Long – phone – (503) 326-3686