Rand Water TARIFF CONSULTATION PROCESS 1. 2 PROCESS AND IMPORTANT TIMELINES DWS / TCTA raw water pricing9 th October 2014 Customer consultation and information.

Slides:



Advertisements
Similar presentations
Chapter 4 Sampling Distributions and Data Descriptions.
Advertisements

3rd Annual Plex/2E Worldwide Users Conference 13A Batch Processing in 2E Jeffrey A. Welsh, STAR BASE Consulting, Inc. September 20, 2007.
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Wants.
Year 6 mental test 10 second questions
1 Discreteness and the Welfare Cost of Labour Supply Tax Distortions Keshab Bhattarai University of Hull and John Whalley Universities of Warwick and Western.
B2B Solutions Study Summary Charts June – September 2013.
Break Time Remaining 10:00.
Rand Water TARIFF CONSULTATION PROCESS 10 TH OCTOBER
2013 Water Rate Study and Proposed Multi-Year Water Rate Adjustments 1.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
TCTA A new word for water 2012/2013 Bulk potable water tariffs setting forum October 2011.
Draft decision Access Arrangements for Envestra (SA) Andrew Reeves Chairman, AER 2 March 2011 Public forum.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 8 Capital Budgeting Cash Flows.
Capacity Planning For Products and Services
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 18 April 2013.
BEEF & VEAL MARKET SITUATION Committee for the Common Organisation of the Agricultural Markets 20 March 2014.
VOORBLAD.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Chapter 7 Review Economics.
SUOMEN PANKKI | FINLANDS BANK | BANK OF FINLAND Growth rates high, but GDP not yet at its 2008 level 1Erkki Liikanen
1..
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
City Council Meeting Agenda Items October 28, 2013.
1 Impact Assessment. 2 Demographics 3 Sex and Age.
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 10 A Monetary Intertemporal Model: Money, Prices, and Monetary Policy.
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
PSSA Preparation.
FISCAL CONSTRAINTS & CHALLENGES PRESENTED TO THE BOARD OF EDUCATION DECEMBER 9, Rye City School District.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Globalization and International Trade Lecture 8 – academic year 2014/15 Introduction to Economics Fabio Landini.
Rand Water TARIFF CONSULTATION OCTOBER DWS / TCTA raw water pricing30 th September 2016 Customer consultation and information sharing Consultation.
TARIFF CONSULTATION PROCESS
COMMENTS ON THE DEBT OWED BY MUNICIPALITIES TO WATER BOARDS SALGA INPUT 20 MARCH 2007 BY WILLIAM MORAKA.
Rand Water TARIFF CONSULTATION OCTOBER 2016.
Presentation transcript:

Rand Water TARIFF CONSULTATION PROCESS 1

2 PROCESS AND IMPORTANT TIMELINES DWS / TCTA raw water pricing9 th October 2014 Customer consultation and information sharing14 th October 2014 Submission to Treasury and SALGA for input14 th October 2014 Customer notification8 th December 2014 Submission to DWS for Parliamentary approval25 th January 2015 Parliamentary approval15 th March 2015

DRIVERS 3 Municipal Finance Management Act: 6 months advance notice National Treasury & SALGA: 40 days for consideration Bulk Water Supply Contract: prior consultation and information sharing DWS must table tariff increases to Parliament on or before 15 th March 2015 Implementation on 1 st July 2015

OVERALL INTERNAL INFLATION 4 The projections provided by the Bureau for Economic Research (BER) show that CPI will remain very close to the upper limit of the key CPI range of 3 per cent – 6 per cent. In 2014, CPI is projected at 5.9 per cent and 5.7 per cent in 2015, both very close to the upper limit.

RAW WATER TARIFF INCREMENT 5 Rand Water received an effective raw water tariff increment of 8.77 per cent. This is an increment from R cents per kilolitre to R cents per kilolitre for the financial year beginning 1 st April This is composed of the TCTA component which is decreasing by 1% from R2.32 to R2.29. The DWS component introduces a new element, i.e. AMD. Therefore this is an increase from R0.5 cents per kilolitre to R0.77 cents per kilolitre, an effective 55% increment. The raw water charge is 23 cents as shown in the table below.

RAW WATER TARIFF INCREMENT These projections place a challenging consultation process in front of Rand Water. The effective tariff increment of 8.77% is way above the inflation range of 3 – 6%. It is important to remember that raw water constitutes above 47% of Rand Water’s cost structure. The additional challenge is that over the years, this has varied wildly, as shown below. This makes any multi-year tariff exercise extremely difficult. 6

CHEMICAL COSTS An important component of chemical costs is that some of the chemicals are imported. Therefore, the strength of the Rand with regards to chemical cost projections is important. There is an expectation that as the US economy continues to recover, this will put more pressure on the Rand. If the Rand devalues, this will increase chemical costs. Taking into consideration CPI, chemical costs are expected to increase by 13%. BER Forecast Exchange rates R/$ LABOUR COSTS The increasing capital expenditure requires that Rand Water’s labour pool matches this increasing crucial requirement. Rand Water is proud that it continues to meet its annual capital expenditure (in Rand terms and actual work undertaken). Rand Water and the water sector are represented by the same organised unions. 7

Tariff Versus Input Cost Inflation 8

9

COMPARISON BETWEEN RAND WATER AND SALGA PROPOSED TARIFFS 10 In the previous tariff cycle, Rand Water noted that there were no differences. This can be attributed to two important points; Continuous cycle of engagements This year, SALGA attended the assessment of water boards session held on 3 rd – 5 th September 2013

Proposed Tariff 11

OVERALL INTERNAL INFLATION 12 Rand Water is also expected to enter capital markets to raise at least R1.340 billion. The proposed 2015/16 potable water tariff will thus be as follows:

THE WATER DEMAND MANAGEMENT FUND Non revenue water among Rand Water’s municipal customers has continued to worsen rather than improve. In 2005, the national average stood at approximately 27%. In Gauteng, the challenge was to improve these water losses to 15%. However, the national average now stands at 36.8%. The table below shows that non revenue water in Gauteng has worsened from 21.8% in 2005 to 35.9% in the Name Joburg Metro20.6%38.2% Ekurhuleni Metro23.8%39.8% Tshwane Metro14.0%26.5% Emfuleni47.6%44.4% Mogale18.2%26.0% Metsimaholo35.2%17.2% Rustenburg32.3%39.0% Midvaal23.0%26.2% Merafong25.9%26.0% Randfontein12.5%21.9% Westonaria10.3%29.7% Lesedi14.9%8.2% Ngwathe1.2%24.9% Kungwini28.7%43.0% Gauteng21.80%35.90% 13

THE WATER DEMAND MANAGEMENT FUND 14 However, this fund will only be applicable if all municipalities agree to it. If one of the municipalities do not agree to the continuation of this fund then it does not apply at all. This is because of the inter- connectedness, economies of scale and financial implications that Rand Water will face by charging different tariffs to different municipalities. The challenges of any municipality that will not be part of this fund will be incorrectly associated with this fund. The 2014 figures are subject to final audit process. Centralised revenue collection by Rand Water This has a huge impact on project finance, given that Smaller municipalities struggle to raise capital Most municipalities have qualified audits Most municipalities do not have a positive record with regards to repaying such funds Available project finance is typically lower than available commercial paper The Water Management Demand alternatives that have been utilised by municipalities have not been sustainable, given a number of competing needs.

15 In line with a well-established approach, Rand Water’s internal inflation is 13.5 per cent. Rand Water therefore proposes a 13.5 per cent tariff increment for the 2015 / 16 financial year with another 1 per cent allocated to the establishment of a Water Demand Management Fund. In total Rand Water proposes a 14.5 per cent tariff increment. CONCLUSION – PROPOSED TARIFF A new approach to tariff setting is crucial Stepped tariff based on volumes Stepped tariff based on non revenue water

16 Thank You