1 Gines Martinez Muon RawData v0 Ginés MARTINEZ, Subatech, Nantes.

Slides:



Advertisements
Similar presentations
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 4 December 2008 Martin Postranecky Matt Warren, Matthew Wing.
Advertisements

Latest Developments from the CCD Front End LCWS 2005 Stanford Joel Goldstein, RAL for the LCFI Collaboration.
6-April 06 by Nathan Chien. PCI System Block Diagram.
Charm and beauty with ALICE at LHC
Gated Kick Drum / Triggered Oscillator Isolate the kick using a noise gate Trigger the oscillator to follow the kick Apply the gate using the channel insert.
Outcome: Determine the square root of perfect squares.
GCT Software ESR - 10th May 2006 Jim Brooke. Jim Brooke, 10 th May 2006 HAL/CAEN Overview GCT Driver GCT GUI Trigger Supervisor Config DB Test scripts.
23-8 3x6 Double it Take Away 6 Share By 9 Double it +10 Halve it Beginner Start Answer Intermediate 70 50% of this ÷7÷7 x8 Double it Start Answer.
2 x0 0 12/13/2014 Know Your Facts!. 2 x1 2 12/13/2014 Know Your Facts!
1 JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
Literary Issues Ups and downs Inside and OUT Make sure.
RPC & LVL1 Mu Barrel Online Monitoring during LS1 M. Della Pietra.
First developments of DAQ\Trigger for RPC 30 October, 2002 General layout of OPERA DAQ\Trigger Naples activity Conclusions Adele Di Cicco Naples RPC Groups:
5 x4. 10 x2 9 x3 10 x9 10 x4 10 x8 9 x2 9 x4.
Roma, P. Camarri DAQ & on-line monitoring at X5 (G. Aielli, P. Camarri) DAQ realization and performance for RPC tests at X5-GIF. Adds and changes.
0 x x2 0 0 x1 0 0 x3 0 1 x7 7 2 x0 0 9 x0 0.
Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
7x7=.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
5 th Workshop on ALICE Installation and Commissioning April 1 rst & 3 rd, CERN Muon Tracking (MCH) Conclusion of the February/March 08 ALICE COSMIC run.
Sept TPC readoutupgade meeting, Budapest1 DAQ for new TPC readout Ervin Dénes, Zoltán Fodor KFKI, Research Institute for Particle and Nuclear Physics.
The Technion Israeli Institute of Technology Intel Inc. A cooperation of:
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
ALICE Offline week, CERN 21 February 2005 I. Hrivnacova 1 New geometry framework in MUON I.Hrivnacova IPN, Orsay ALICE Offline week, CERN 21 February 2005.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
Understanding Data Acquisition System for N- XYTER.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Javier CastilloLHC Alignment Workshop - CERN - 05/09/ Alignment of the ALICE MUON Spectrometer Javier Castillo CEA/Saclay.
ALICE Computing Model The ALICE raw data flow P. VANDE VYVRE – CERN/PH Computing Model WS – 09 Dec CERN.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
A PCI Card for Readout in High Energy Physics Experiments Michele Floris 1,2, Gianluca Usai 1,2, Davide Marras 2, André David IEEE Nuclear Science.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
QGP France sept 2010Sanjoy Pal Performances of the tracking Chambers of the ALICE MUON Spectrometer 1.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
PCI B ASED R EAD-OUT R ECEIVER C ARD IN THE ALICE DAQ S YSTEM W.Carena 1, P.Csato 2, E.Denes 2, R.Divia 1, K.Schossmaier 1, C. Soos 1, J.Sulyan 2, A.Vascotto.
Dr Pascal Dupieux, LPC Clermont, Muon Id TDR, 06/  The Muon Spectrometer needs an important upgrade in view of operating in the context of the high.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
ARCHITECTURE. PRR November x 32 PADs Up to 26 or 3 x 17 MANU BOARD. PATCH BUS Translator Board. FEE DETECTOR Up to 100 PATCH BUS per detector. MANU.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
Report from TRD on Raw Data Christoph Blume ALICE Offline Week, October, 2006.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Common Readout Unit (CRU) workshop CERN Mars 2016
Alignment of the ALICE MUON Spectrometer
Status of the Calibration of the MUON Arm
Developments of the PWG3 muon analysis code
DAQ for ATLAS SCT macro-assembly
Commissioning of the ALICE HLT, TPC and PHOS systems
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
Regional Cal. Trigger Milestone: Production & Testing Complete
Implementation of DHLT Monitoring Tool for ALICE
Presentation transcript:

1 Gines Martinez Muon RawData v0 Ginés MARTINEZ, Subatech, Nantes

2 Gines Martinez MUON spectrometer 2 subsystems: Tracking St 1 – 5 Trigger 6-7

3 Gines Martinez Status ● Indian team (mamu) developed a macro to generate rawdata for station 4 in bending plane (aliroot 3.09). ● Based on a naive read-out mapping: matrix of pads ix,iy (the only mapping-segmentation coded in aliroot). ● Macro has been adapted to aliroot 4 (mainly new IO) ● South Africa team (Bruce) adapting this macro into rawdata framework.

4 Gines Martinez Muon read-out: tracking DAQ CROCUS PRORC MUON DDL PRORC DDL x20 DC x5 Block A Block B Bus Patch MANU X64 pads x5 DSP

5 Gines Martinez Muon read-out: Tracking ● 20 DDL for muon tracking ● A DDL and crocus per half chamber or detection plane (right and left). ● 5 data concentrators per crocus, 10 bus patch each (5+5): 50 bus patch per crocus or DDL. ● Each bus patch is a read-out bus of MANU cards. ● 64 channels (pads) per manu card. 1.1 millions of channels in MUON tracking.

6 Gines Martinez MUON tracking rawdata DDL ALICE standard header Total length Type of block (A,B) | software version End of block header Total length Data length DSP number | software version End of DSP header Total length x2 Blocks x5 DC Data length Rawdata length Bus patch absolute id P|0|0|11 bits manu add|6 bits ch add|12 bits data x5 BusPatch

7 Gines Martinez Muon readout: trigger DAQ DARC PRORC MUON DDL PRORC DDL x2 DARC Global Regional controler x8 Regional controler Local controler x16 Local controler Adult x16 Adult Strip: 0,1

8 Gines Martinez Muon trigger rawdata DDL ALICE standard header DDL id|version|DarcSerialNumber|Evt type|MBZ Global output RegionalSerialNumber|Crate n|Version|MBZ Local card rawdata x4 Global input (4 regional outputs) Local card rawdata x16 Regional Input (local output) Regional Output (global input) x8 Regional Input (local output) End of trigger DDL subevent

9 Gines Martinez To be done ● Add the standard alice DDL header to rawdata muon DDL subevents. ● Extension to non-bending plane. ● 2 DDL per detection plane (or chamber) ● Extension to Stations 1, 2, 3 & 5. ● Add rawdata for trigger chambers (2 DDL for the full trigger stations). ● Rawdata alice technical note in preparation.