CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine
Outline Cathode Strip Chambers in ALTAS CSC Principle of Operation CSC Beam Test Layout at X5 (stand alone experiment, CERN) CSC position resolution and inefficiency
ATLAS Cathode Strip Chambers CSC Electronics: 24,576 Precision Channels (X) 6,144 Transverse Channels (Y) 256 – 96 channel ASM1 (X) Boards 64 – 96 channel ASM1 (Y) Boards 160 – 192 channel ASM2 Boards 2x16 chambers
ATLAS Muon Spectrometer =2.7
Principle of Operation Determine muon position by interpolating the charge on 3 to 5 adjacent strips using ratio algorithm: Precision (x-) strip pitch ~ 5mm Measure Q 1, Q 2, Q 3 … with signal/noise=150/1 to get x ~ m. Human hire diameter ~100 m. Second set of y-strips measure transverse coordinate to ~ 1 cm. Position accuracy unaffected by gas gain or drift time variations. S = d = 2.50 mm W = mm 0.8Ar+0.2CO 2
Beam test setup layout at X5 high radiation facility P =120 GeV/C Lead absorbers of different thicknesses were used to vary the background flux intensity. ←
On-line event viewer by M. Schernau
Signal shape and fitting The bipolar function was used to fit the signal: z = (t-t 0 )/ n=12 - the parameter of amplifier integration, t 0 - signal start position - signal width signal has been digitized at 20(40)MHz Clock time distance between time slices 50(25)ns pedestal extracted
Beam profile distributions
Landau distribution Charge induced in ADC counts: Q = Q max +Q right +Q left
Position resolution and inefficiency Inefficiency: Position resolution in 2 nd and 3 rd gaps defined as (two chambers involved), where - width of the Gaussian fit of over ±0.3mm
CSC one layer resolution and inefficiency as a function of background radiation rate Run 99 Run04
Summary stand alone test beam at X5 During the beam test the chamber + electronics at 20 MHz clock showed the expected performance. One layer inefficiency is found to be 5% without radiation and 24% at the maximal expected LHC background rate (safety factor of 5) 4.2 kHz/cm 2 No calibration used. The results can be considered as conservative estimates (not worse then) for efficiency and resolution.