Tracker Hardware Update Aron Fish 25/01/06 Aron Fish 25/01/06.

Slides:



Advertisements
Similar presentations
Table de multiplication, division, addition et soustraction.
Advertisements

Artificial Intelligence 11. Decision Tree Learning Course V231 Department of Computing Imperial College, London © Simon Colton.
10.1 Si23_03 SI23 Introduction to Computer Graphics Lecture 10 – Introduction to 3D Graphics.
1GR2-00 GR2 Advanced Computer Graphics AGR Lecture 2 Basic Modelling.
Order and Chaos In this lesson, you will learn how to use the order of operations and some numbers to create an expression with a result that you want.
PROLOG MORE PROBLEMS.
1 Machine Learning: Lecture 1 Overview of Machine Learning (Based on Chapter 1 of Mitchell T.., Machine Learning, 1997)
The Dating Game With Our Host, Welcome to the Dating Game, the game where we find the greatest common factors between different numbers. Hopefully well.
Basic Laws of Electric Circuits Kirchhoff’s Voltage Law
Patterns to help you learn your times tables!
Outcome: Determine the square root of perfect squares.
1Computer Graphics Building Models John Shearer Culture Lab – space 2
Backward Checking Search BT, BM, BJ, CBJ. An example problem Colour each of the 5 nodes, such that if they are adjacent, they take different colours 12.
1 On c-Vertex Ranking of Graphs Yung-Ling Lai & Yi-Ming Chen National Chiayi University Taiwan.
Fc. Consider the following problem (csp5) variables V[1] to V[10] uniform domains D[1] to D[10] = {1,2,3} constraints V[1] = V[4] V[4] > V[7] V[7] = V[10]
WASH Cluster – Emergency Training W W0 1 Water in Emergencies Opening session Introductions and the Cluster Approach.
2 x0 0 12/13/2014 Know Your Facts!. 2 x1 2 12/13/2014 Know Your Facts!
2 x /18/2014 Know Your Facts!. 11 x /18/2014 Know Your Facts!
2 x /10/2015 Know Your Facts!. 8 x /10/2015 Know Your Facts!
Strategies – Multiplication and Division
Instructor: Shengyu Zhang 1. Content Two problems  Minimum Spanning Tree  Huffman encoding One approach: greedy algorithms 2.
5 x4. 10 x2 9 x3 10 x9 10 x4 10 x8 9 x2 9 x4.
1 The Restaurant Domain Will they wait, or not?. 2 Decision Trees Patrons? NoYesWaitEst? No Alternate?Hungry?Yes Reservation?Fri/Sat?Alternate?Yes NoYesBar?Yes.
The Problem of K Maximum Sums and its VLSI Implementation Sung Eun Bae, Tadao Takaoka University of Canterbury Christchurch New Zealand.
Multiplication Facts Practice
Shannon Expansion Given Boolean expression F = w 2 ’ + w 1 ’w 3 ’ + w 1 w 3 Shannon Expansion of F on a variable, say w 2, is to write F as two parts:
Graeme Henchel Multiples Graeme Henchel
1.Print and cut round outside of cootie catcher 2.Fold in half and in half again 3.Open out, turn over so.
The Project Problem formulation (one page) Literature review –“Related work" section of final paper, –Go to writing center, –Present paper(s) to class.
0 x x2 0 0 x1 0 0 x3 0 1 x7 7 2 x0 0 9 x0 0.
Count to 20. Count reliably at least 10 objects. Use ‘more’ and ‘less’ to compare two numbers. Count reliably at least 10 objects. Estimate number of objects.
7x7=.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Optical Astronomy Imaging Chain: Telescopes & CCDs.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
Reflection in Plane Mirrors Reflection in Plane Mirrors Objectives: Investigate reflection in plane mirrors Verify the “1st Law of Reflection” Compare.
MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
QA for the Fibre Tracker 28 October 2004Brunel QA for fibre bundling Dr Paul Kyberd and Dr Peter Hobson School of Engineering & Design Brunel University,
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Reflection in Plane Mirrors Objectives: Investigate reflection in plane mirrors Verify the “1st Law of Reflection” Compare image location to object and.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
Camera Parts. 1. Body - Made of high grade plastic or metal, this holds all the other parts together as well as provide protection to the delicate.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
4th Station Waveguide Test Roger Hare & Aron Fish.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
Light Loss Tests Update Aron Fish 22/02/06 Mice Tracker Phone Conference.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
Sight Words.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Transmission test for waveguide Hideyuki Sakamoto Tracker Phone Meeting, 25 th May,2006 Contents Method Measured luminosity Results and next step.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
Detector building Notes of our discussion
Aron Fish Imperial College Mice Video Conference 01/02/06
Introduction To Computing
Presentation transcript:

Tracker Hardware Update Aron Fish 25/01/06 Aron Fish 25/01/06

Contents  Disassembly  Waveguide Mapping  Waveguide Check  Mirroring  Bulkhead Connector Alignment  Hardware Equipment  Disassembly  Waveguide Mapping  Waveguide Check  Mirroring  Bulkhead Connector Alignment  Hardware Equipment

Waveguide (Stays the same) D0 End (old) Bulkhead End(old)New Labels (for DO and Bulkhead ends) Comments D5D E1E101Boot is loose DO end- fibres exposed F22F102DO connector had no cover CC103Boot loose - not as bad as AA104 15B12 12 Existing & New Labels on Waveguides

Bulkhead (external)Bulkhead (internal)Comments 1055Bulkhead connector screwed in but not tight 1011Bulkhead connector screwed in tight 1022Bulkhead connector screwed in tight 1044Bulkhead connector screwed in but not tight 1033Bulkhead connector screwed in but not tight Disassembly continued…..

V W X V1 V12 W1 W12 X1 X12 Station Connector Numbering Stations A, B, C Viewed from waveguide end V W X C10 C1 C30 C21 C20 C11 V W X V1 V10 W1 W10 X1 X10 Station D (old)Station D (new version, so same format & direction as A, B & C ) UP RIGHT UP RIGHT UP

Station Connector PositionWaveguideD0 Connector X2,X3,X4,X5,X6,X7,X813 X9,X10,X11,X12,V1,V2,V342 V4,V5,V6,V7,V8,V9,V1077 Waveguide Mapping Station A X1, V11, V12 all unused station connectors positions

Station Connector PositionWaveguideD0 Connector W2,W3,W4,W5,W6,W7,W8118 W9,W10,W11,W12,X1,X2,X31512 X4,X5,X6,X7,X8,X9,X10211 X11,X12,V1,V2,V3,V4,V5514 V6,V7,V8,V9,V10,V11,V1286 Waveguide Mapping Station B W1 is the only unused station connector position

Station Connector PositionWaveguideD0 Connector W3,W4,W5,W6,W7,W8,W9101 W10,W11,W12,X1,X2,X3,X4134 X5,X6,X7,X8,X9,X10,X11149 Waveguide Mapping Station C W1, W2, X12 all unused station connectors positions

Station Connector PositionWaveguideD0 Connector W1,W2,W3,W4,W5,W W7,W8,W9,W10,X1,X X3,X4,X5,X6,X7,X83103 X9,X10,V1,V2,V3,V46102 V5,V6,V7,V8,V9,V Waveguide Mapping Station D

Waveguide Mapping Contin….  By injecting light using the filtered LED, I have also checked the light output from the D0 --> bulkhead --> station connector.  The dead channels have been noted and the mapping information from this has also been noted. This will be put together with my other mapping information to produce a final (correct) version of the fibre and waveguide mapping.  Also, there was no light loss notable by eye. This will need to be checked again quantitively, once the CCD camera set-up arrives.  By injecting light using the filtered LED, I have also checked the light output from the D0 --> bulkhead --> station connector.  The dead channels have been noted and the mapping information from this has also been noted. This will be put together with my other mapping information to produce a final (correct) version of the fibre and waveguide mapping.  Also, there was no light loss notable by eye. This will need to be checked again quantitively, once the CCD camera set-up arrives.

Mirroring  For a first look at the mirroring on the 4th station, we used a red LED to illuminate the scintillating fibres at the station connectors.  We found that light was coming through the mirrored ends, but not for all the fibres, I’d say roughly a 1/3 of them (which Roger had predicted) and from what I can remember, Malcolm and Hideyuki’s results show a uniform 30% loss over the 4th station.  Paul Kyberd also saw a similar amount of loss for the 3 old stations, which indicates that the mirroring isn’t solely causing the 30% loss of photons, but again this was only a first look by eye, so could be misleading.  We found that light across the planes was delineated by light being scattered out? (See picture on other.ppt.)  Also, we found more loss of light near the sharp edge of the station carbon fibre body. Geoff believes this could be from optical contact with the glue.  For a first look at the mirroring on the 4th station, we used a red LED to illuminate the scintillating fibres at the station connectors.  We found that light was coming through the mirrored ends, but not for all the fibres, I’d say roughly a 1/3 of them (which Roger had predicted) and from what I can remember, Malcolm and Hideyuki’s results show a uniform 30% loss over the 4th station.  Paul Kyberd also saw a similar amount of loss for the 3 old stations, which indicates that the mirroring isn’t solely causing the 30% loss of photons, but again this was only a first look by eye, so could be misleading.  We found that light across the planes was delineated by light being scattered out? (See picture on other.ppt.)  Also, we found more loss of light near the sharp edge of the station carbon fibre body. Geoff believes this could be from optical contact with the glue.

 Also whilst checking the mapping of the waveguides I came across one of the drilled holes in the bulkhead connector offset by a reasonably large amount.  This leads me to the question could the dowels for example on the bulkhead connectors (only used on 4th station) be slightly misaligned, leading to an offset of a roughly a few hundred microns? I.e. 30%? Could be a stupid question, as I’m sure it was measured precisely when the holes were drilled, but it might be worth reassessing, if possible?  Also whilst checking the mapping of the waveguides I came across one of the drilled holes in the bulkhead connector offset by a reasonably large amount.  This leads me to the question could the dowels for example on the bulkhead connectors (only used on 4th station) be slightly misaligned, leading to an offset of a roughly a few hundred microns? I.e. 30%? Could be a stupid question, as I’m sure it was measured precisely when the holes were drilled, but it might be worth reassessing, if possible? Again, sorry for bad picture but you can still clearly see the offset

 Paul Kyberd has suggested when the camera arrives “ we make a holder for the UV laser with a collimation hole at the front to allow a controllable amount of light through and that we hold this against the plane (or very close to), this solves the problem of imaging the light, which we need to do for the QA, but not for this measurement. Then we can take the camera and hold it up against the output of the fibres and make an integrated measurement, which again removes the need to worry about focus. It may be we need to do proper focusing to get a good enough measurement, but we should be able to do a good first look ”.  Geoff is currently designing a way of doing this, while Roger has already built a stand so that we can test each station carefully and without the station frame intact, so we have more room for maneuver.  Paul Kyberd has suggested when the camera arrives “ we make a holder for the UV laser with a collimation hole at the front to allow a controllable amount of light through and that we hold this against the plane (or very close to), this solves the problem of imaging the light, which we need to do for the QA, but not for this measurement. Then we can take the camera and hold it up against the output of the fibres and make an integrated measurement, which again removes the need to worry about focus. It may be we need to do proper focusing to get a good enough measurement, but we should be able to do a good first look ”.  Geoff is currently designing a way of doing this, while Roger has already built a stand so that we can test each station carefully and without the station frame intact, so we have more room for maneuver. Next Step….

Hardware equipment  CCD Cameras now ordered, expected at Imperial on Friday (27th Jan), worst case Monday (30th Jan).  Lenses ordered, 1-2 weeks expected for delivery, work on light loss can start without these, so least important.  Video capture card ordered and expected to arrive sometime early next week (31st Jan or 1st Feb).  Bill Cameron is currently organizing a PC for me to set-up in the tracker room at Imperial.  CCD Cameras now ordered, expected at Imperial on Friday (27th Jan), worst case Monday (30th Jan).  Lenses ordered, 1-2 weeks expected for delivery, work on light loss can start without these, so least important.  Video capture card ordered and expected to arrive sometime early next week (31st Jan or 1st Feb).  Bill Cameron is currently organizing a PC for me to set-up in the tracker room at Imperial.