An overview of how LEED v4 directly impacts building materials manufacturers Operations Channel: Continuous Improvement Supply Chain Sustainability Reporting:

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
21 st Annual Conference. Delivering sustainable solutions in a more competitive world Mercury Lamps - Life Cycle Assessment for Product Stewardship Peter.
Sustainable Approaches: Industrial Ecology and Pollution Prevention Chapter 21 © 2004 Thomson Learning/South-Western.
WP4 – Task 4.4 LCA Activities
IPC 2-18, 1752 Standard for Materials Declaration
The BIFMA Sustainability Standard &. Introduction to the Standard and level Purpose and Scope of the BIFMA Furniture Sustainability Standard The Standard.
Green Building Leadership in Energy and Environmental Design (LEED)
LEED Green Building Program Version LEED Green Building Program  LEED = The Leadership in Energy and Environmental Design  “Aims to improve occupant.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
How to Know If and When It’s Time to Commission a Life Cycle Assessment.
Life Cycle Assessment (LCA)
Sustainability. Sustainability Defined Sustainability commonly refers to the characteristic of a process or state which can be maintained at a certain.
Water Sustainability December 1, 2011 NSF DWA Joint Committee.
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
………………………. A perspective of life cycle thinking We believe in decision making based life cycle thinking. It results in: -no trade-offs in life cycle phases.
GREENING SUPPLY CHAIN IN RETAIL SECTOR
Green School Design Gary A. Jerue ED 846 Spring 2010.
Life Cycle Assessment Overview of LCA and Methodology October 30, 2012.
Clara María Mollá Muñoz. PFG_T31 17-July, Introduction. Sustainable architecture The strategies are focused on energy efficiency. Reduce environmental.
Environmental Product Declarations and Product Category Rules For Businesses Rita Schenck American Center for Life Cycle Assessment January 2010.
Environmental Product Declarations and Product Category Rules For Businesses Rita Schenck American Center for Life Cycle Assessment January 2010.
Certified Green Buildings: Why and How
Life Cycle Overview & Resources. Life Cycle Management What is it? Integrated concept for managing goods and services towards more sustainable production.
Environmental Profiling and EN15804 EPDs
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
ISO EMS OVERVIEW May ISO EMS OVERVIEW TRAINING Contents What is an EMS? Why ISO & Certification? EMS Basic Elements Environmental.
SECRET Green Procurement Office of Greening Government Operations May 4, 2006.
Construction Specifications Foreman’s Development Series
The Role of Compact Storage in Green Building Design Program No.: CSGBD Provider Name: Spacesaver Corporation Provider No.: J197.
The Green Horizon What’s Next in Sustainability Tim Petersen, LEED AP Steve Farley, CSI, CDT.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Life Cycle Assessment The Science behind Environmental Product Labeling.
Sunday, October 25, Procurement of African Timber - Supporting Sustainable Forest Management and Development -
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
Overview of the NSF 375 Draft Sustainability for the Water Treatment and Distribution Industry October 30, 2012.
Life Cycle Assessment of the proposed Waste2Go approach Brussels, 14 th September 2015 Dipl.-Ing. Florian Gehring.
Principles of Sustainable Construction Chapter 10.
LIFE CYCLE ASSESSMENT (LCA). As corporations seek to improve their environmental performance they require new methods and tools. LCA is one such tool.
1 © 2015 Green Building Academy. All rights reserved. Chapter : 6 Materials and Resources.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Chapter 11 Environmental Performance of a Flowsheet.
IEEE Required – End-of-life processing requirements For all end of life equipment collected by manufacturer under :  The manufacturer.
Sustainability in the Supply Chain 5 © 2014 Pearson Education, Inc. SUPPLEMENT.
The value of environmental footprints Euro-Mediterranean Conference on Digital integration, energy and resource efficiency: opportunities in textile and.
The standard solutions to improving environmental performance Vicki Gomersall, Product Manager.
MAPA Wednesday Webinar Everything you always wanted to know about LEED* *but were afraid to ask.
Fundamentals of LEED v4 for
Siam Cement Group (SCG) Overview
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
LEEDv4 Materials Resources
Objectives of a Green Building
Renewable Cities Need Renewable Buildings
Distinguishing Green from Green-washed Building Products
(Refer to Chapter 2 of the textbook)
Environmental Product Declarations
ABB and sustainable development
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
INTD409 Interior Environmental Technology Fall 2016/17
2- INTD409 Interion Environmental Technology
ABB and sustainable development
2- INTD409 Interion Environmental Technology Fall 2014/15
LEED 2.2 for New Construction LEED 2.0 for Existing Buildings
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
Leadership in Energy and Environmental Design (LEED)
Chemicals of concern Session 3 – looking across product sectors to track and manage chemicals of concerns. A thought starter Sandra Averous and Jacqueline.
LEED Overview.
Presentation transcript:

An overview of how LEED v4 directly impacts building materials manufacturers Operations Channel: Continuous Improvement Supply Chain Sustainability Reporting: What to Expect and Why

What are the new LEED v4 requirements that impact building materials? What is going to be required by manufacturers to meet the MR credit requirements? What are all of the acronyms/definitions that need to be understood for LEED v4 as it relates to manufactured building materials? What building products are impacted? LEED v4

LEED v4 is focusing on market transformation within the manufacturing industry MARKET TRANSFORMATION

LEED v4 is accelerating 4 sustainable business trends NOTE: The MR credits are optional, but products that contribute to more of the six new LEED points possible are more likely to gain favor with building designers and owners. 1.Harnessing the power of transparency 2.Using LCA as a product differentiator 3.Responsible sourcing of (all) raw materials 4.Hazard-based ingredients reporting

Using LCA as a product differentiator Earlier versions of LEED have relied on single- attribute proxies, such as recycled, reused or bio- based content for identifying building materials with reduced environment impacts. LEED v4 is pioneering the use of verified life cycle assessment (LCA) data in an attempt to more holistically assess environmental impacts across the entire life cycle of a product. MRc1: Building Life-Cycle Impact Reduction This new credit asks manufacturers to provide Environmental Product Declarations (EPDs) or third-party verified life cycle assessments. Just having an EPD contributes to 1 point, while showing that your product's impacts are below industry averages contributes to a 2nd point. Recycled content still will contribute, but only to the credit for responsibly sourced raw materials.

MRc1: Building Life-Cycle Impact Reduction Requirements: Demonstrate reduced environmental effects during initial project decision-making by reusing existing building resources or demonstrating a reduction in materials use through life-cycle assessment. Achieve one of the following options.life-cycle assessment Option 1. historic building reuse (5 points)historic buildingreuse OR Option 2. renovation of abandoned or blighted building (5 points) OR Option 3. building and material reuse (2–4 points)reuse OR Option 4. whole-building life-cycle assessment (3 points)life-cycle assessment For new construction (buildings or portions of buildings), conduct a life-cycle assessment of the project’s structure and enclosure that demonstrates a minimum of 10% reduction, compared with a baseline building, in at least three of the six impact categories listed below, one of which must be global warming potential. No impact category assessed as part of the life-cycle assessment may increase by more than 5% compared with the baseline building. The baseline and proposed buildings must be of comparable size, function, orientation, and operating energy performance as defined in EA Prerequisite Minimum Energy Performance. The service life of the baseline and proposed buildings must be the same and at least 60 years to fully account for maintenance and replacement. Use the same life-cycle assessment software tools and data sets to evaluate both the baseline building and the proposed building, and report all listed impact categories. Data sets must be compliant with ISO structureenclosureservice life Select at least three of the following impact categories for reduction: global warming potential (greenhouse gases), in CO2e; depletion of the stratospheric ozone layer, in kg CFC-11; acidification of land and water sources, in moles H+ or kg SO2; eutrophication, in kg nitrogen or kg phosphate; formation of tropospheric ozone, in kg NOx or kg ethene; and depletion of nonrenewable energy resources, in MJ.

MRc2: Building Product Disclosure & Optimization Environmental Product Declarations Requirements: Achieve one or more of the options below, for a maximum of 2 points. Option 1. environmental product declaration (EPD) (1 point)environmental product declaration Use at least 20 different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria below. Product-specific declaration. Products with a publicly available, critically reviewed life-cycle assessment conforming to ISO that have at least a cradle to gate scope are valued as one quarter (1/4) of a product for the purposes of credit achievement calculation.life-cycle assessment Environmental Product Declarations which conform to ISO 14025, 14040, 14044, and EN or ISO and have at least a cradle to gate scope. Industry-wide (generic) EPD -- Products with third-party certification (Type III), including external verification, in which the manufacturer is explicitly recognized as a participant by the program operator are valued as one half (1/2) of a product for purposes of credit achievement calculation. Product-specific Type III EPD -- Products with third-party certification (Type III), including external verification in which the manufacturer is explicitly recognized as the participant by the program operator are valued as one whole product for purposes of credit achievement calculation. USGBC approved program – Products that comply with other USGBC approved environmental product declaration frameworks. AND/OR Option 2. Multi-attribute optimization (1 point) Use products that comply with one of the criteria below for 50%, by cost, of the total value of permanently installed products in the project. Third party certified products that demonstrate impact reduction below industry average in at least three of the following categories are valued at 100% of their cost for credit achievement calculations. global warming potential (greenhouse gases), in CO2e; depletion of the stratospheric ozone layer, in kg CFC-11; acidification of land and water sources, in moles H+ or kg SO2; eutrophication, in kg nitrogen or kg phosphate; formation of tropospheric ozone, in kg NOx or kg ethene; and depletion of nonrenewable energy resources, in MJ. USGBC approved program -- Products that comply with other USGBC approved multi-attribute frameworks. For credit achievement calculation, products sourced (extracted, manufactured, purchased) within 100 miles (160 km) of the project site are valued at 200% of their base contributing cost. Structure and enclosure materials may not constitute more than 30% of the value of compliant building products.

MRc2: Building Product Disclosure & Optimization Environmental Product Declarations

Responsible sourcing of (all) raw materials The credit requires manufacturers to report extraction locations and supplier commitments to responsible practices for 90% of a product's raw materials. MRc3: Building Product Disclosure & Optimization Sourcing of Raw Materials

Self declared reporting OR GRI Sustainability Report Organization for Economic Co-operation and Development Guidelines for Multinational Enterprises U.N. Global Compact: Communication of Progress ISO 26000: 2010 Guidance on Social Responsibility USGBC approved program: other USGBC approved programs meeting the CSR criteria OR Meet the requirements for Leadership Extraction Practices MRc3: Building Product Disclosure & Optimization Sourcing of Raw Materials

Requirements: Option 1. raw material source and extraction reporting (1 point)raw material Use at least 20 different permanently installed products from at least five different manufacturers that have publicly released a report from their raw material suppliers which include raw material supplier extraction locations, a commitment to long-term ecologically responsible land use, a commitment to reducing environmental harms from extraction and/or manufacturing processes, and a commitment to meeting applicable standards or programs voluntarily that address responsible sourcing criteria. Products sourced from manufacturers with self-declared reports are valued as one half (1/2) of a product for credit achievement. Third-party verified corporate sustainability reports (CSR) which include environmental impacts of extraction operations and activities associated with the manufacturer’s product and the product’s supply chain, are valued as one whole product for credit achievement calculation. Acceptable CSR frameworks include the following: Global Reporting Initiative (GRI) Sustainability Report Organisation for Economic Co-operation and Develoment (OECD) Guidelines for Multinational Enterprises U.N. Global Compact: Communication of Progress ISO 26000: 2010 Guidance on Social Responsibility USGBC approved program: Other USGBC approved programs meeting the CSR criteria. AND/OR Option 2. leadership extraction practices (1 point) Use products that meet at least one of the responsible extraction criteria below for at least 25%, by cost, of the total value of permanently installed building products in the project. Extended producer responsibility. Products purchased from a manufacturer (producer) that participates in an extended producer responsibility program or is directly responsible for extended producer responsibility. Products meeting extended producer responsibility criteria are valued at 50% of their cost for the purposes of credit achievement calculation.extended producer responsibility Bio-based materials. Bio-based products must meet the Sustainable Agriculture Network’s Sustainable Agriculture Standard. Bio-based raw materials must be tested using ASTM Test Method D6866 and be legally harvested, as defined by the exporting and receiving country. Exclude hide products, such as leather and other animal skin material. Products meeting bio-based materials criteria are valued at 100% of their cost for the purposes of credit achievement calculation. Wood products. Wood products must be certified by the Forest Stewardship Council or USGBC-approved equivalent. Products meeting wood products criteria are valued at 100% of their cost for the purposes of credit achievement calculation.wood Materials reuse. Reuse includes salvaged, refurbished, or reused products. Products meeting materials reuse criteria are valued at 100% of their cost for the purposes of credit achievement calculation.reuse Recycled content. Recycled content is the sum of postconsumer recycled content plus one-half the preconsumer recycled content, based on cost. Products meeting recycled content criteria are valued at 100% of their cost for the purposes of credit achievement calculationpostconsumer recycled contentpreconsumer recycled content USGBC approved program. Other USGBC approved programs meeting leadership extraction criteria. For credit achievement calculation, products sourced (extracted, manufactured, purchased) within 100 miles (160 km) of the project site are valued at 200% of their base contributing cost. For credit achievement calculation, the base contributing cost of individual products compliant with multiple responsible extraction criteria is not permitted to exceed 100% its total actual cost (before regional multipliers) and double counting of single product components compliant with multiple responsible extraction criteria is not permitted and in no case is a product permitted to contribute more than 200% of its total actual cost. Structure and enclosure materials may not constitute more than 30% of the value of compliant building products. enclosure MRc3: Building Product Disclosure & Optimization Sourcing of Raw Materials

Harnessing the power of transparency A building product can contribute to a LEED point just by disclosing information related to environmental and health impacts. Even if your product contains carcinogens & other hazardous ingredients, it theoretically could contribute to 2 LEED points just by being transparent about these unfortunate facts. This knowledge starts the internal inquiry into how questionable processes or materials could be improved before the next disclosure. MRc4: Building Product Disclosure & Optimization Material Ingredients

Hazard-based ingredients reporting LEED v4 marks USGBC's first major move into addressing the potential toxicity of building product ingredients. Products can contribute to 1 point by declaring all ingredients more than 0.1 percent by weight, and another point if companies can prove that they are avoiding some of the most hazardous chemicals as determined by several governmental lists. NGOs, corporations such as Google, and dozens of architecture firms have banded together to create the Health Product Declaration, a hazard-based standard format for reporting ingredients and health warnings, which is recognized by LEED v4.Health Product Declaration Wal-Mart's recent announcementWal-Mart's recent announcement on chemical disclosure and avoidance, could mark a turning point in making hazard-based chemical assessment is another method for weighing the "healthiness" of product ingredients. MRc4: Building Product Disclosure & Optimization Material Ingredients

Requirements Option 1. material ingredient reporting (1 point): Use at least 20 different permanently installed products from at least five different manufacturers that use any of the following programs to demonstrate the chemical inventory of the product to at least 0.1% (1000 ppm). Manufacturer Inventory. The manufacturer has published complete content inventory for the product following these guidelines: A publicly available inventory of all ingredients identified by name and Chemical Abstract Service Registration Number (CASRN) Materials defined as trade secret or intellectual property may withhold the name and/or CASRN but must disclose role, amount and GreenScreen benchmark, as defined in GreenScreen v1.2. Health Product Declaration. The end use product has a published, complete Health Product Declaration with full disclosure of known hazards in compliance with the Health Product Declaration open Standard. Cradle to Cradle. The end use product has been certified at the Cradle to Cradle v2 Basic level or Cradle to Cradle v3 Bronze level. USGBC approved program. Other USGBC approved programs meeting the material ingredient reporting criteria. AND/OR Option 2. Material ingredient optimization (1 point): Use products that document their material ingredient optimization using the paths below for at least 25%, by cost, of the total value of permanently installed products in the project. GreenScreen v1.2 Benchmark. Products that have fully inventoried chemical ingredients to 100 ppm that have no Benchmark 1 hazards: If any ingredients are assessed with the GreenScreen List Translator, value these products at 100% of cost. If all ingredients are have undergone a full GreenScreen Assessment, value these products at 150% of cost. Cradle to Cradle Certified. End use products are certified Cradle to Cradle. Products will be valued as follows: Cradle to Cradle v2 Gold: 100% of cost; Cradle to Cradle v2 Platinum: 150% of cost; Cradle to Cradle v3 Silver: 100% of cost; Cradle to Cradle v3 Gold or Platinum: 150% of cost International Alternative Compliance Path – REACH Optimization. End use products and materials that do not contain substances that meet REACH criteria for substances of very high concern. If the product contains no ingredients listed on the REACH Authorization or Candidate list, value at 100% of cost. USGBC approved program. Products that comply with USGBC approved building product optimization criteria. AND/OR Option 3. Product Manufacturer Supply Chain Optimization (1 point): Use building products for at least 25%, by cost, of the total value of permanently installed products in the project that: Are sourced from product manufacturers who engage in validated and robust safety, health, hazard, and risk programs which at a minimum document at least 99% (by weight) of the ingredients used to make the building product or building material, and Are sourced from product manufacturers with independent third party verification of their supply chain that at a minimum verifies: Processes are in place to communicate and transparently prioritize chemical ingredients along the supply chain according to available hazard, exposure and use information to identify those that require more detailed evaluation Processes are in place to identify, document, and communicate information on health, safety and environmental characteristics of chemical ingredients Processes are in place to implement measures to manage the health, safety and environmental hazard and risk of chemical ingredients Processes are in place to optimize health, safety and environmental impacts when designing and improving chemical ingredients Processes are in place to communicate, receive and evaluate chemical ingredient safety and stewardship information along the supply chain Safety and stewardship information about the chemical ingredients is publicly available from all points along the supply chain Products meeting Option 3 criteria are valued at 100% of their cost for the purposes of credit achievement calculation. For credit achievement calculation of options 2 and 3, products sourced (extracted, manufactured, purchased) within 100 miles (160 km) of the project site are valued at 200% of their base contributing cost. For credit achievement calculation, the value of individual products compliant with either option 2 or 3 can be combined to reach the 25% threshold but products compliant with both option 2 and 3 may only be counted once. Structure and enclosure materials may not constitute more than 30% of the value of compliant building products.enclosure

Acronyms and Terminology HPD EPD LCA General Emissions  CDPH SM v SCS Indoor Advantage Gold SCS Indoor Advantage FloorScore CHPS NSF-332 CASRN  GreenScreen v1.2  GreenScreen List Translator, GreenScreen Assessment Cradle to Cradle (many different levels) TPC list (for composite wood) CARB ULEF ANSI/BIFMA M  BIFMA level and or need to be achieved

What building materials are impacted? Facility Construction Subgroup Div. 02 — Existing Conditions Div. 03 — Concrete Div. 04 — Masonry Div. 05 — Metals Div. 06 — Woods, Plastics & Composites Div. 07 — Thermal & Moisture Protection Div. 08 — Openings Div. 09 — Finishes Div. 10 — Specialties Div. 11 — Equipment Div. 12 — Furnishings Div. 13 — Special Construction Div. 14 — Conveying Equipment Facility Services Subgroup: Div. 21 — Fire Suppression Div. 22 — Plumbing Div. 23 — HVAC Div. 25 — Integrated Automation Div. 26 — Electrical Div. 27 — Communications Div. 28 — Electronic Safety & Security Site and Infrastructure Subgroup: Div. 31 — Earthwork Div. 32 — Exterior Improvements Div. 33 — Utilities Div. 34 — Transportation Div. 35 — Waterways & Marine Construction Process Equipment Subgroup: Div. 40 — Process Integration Div. 41 — Material Processing & Handling Equip. Div. 42 — Process Heating, Cooling, & Drying Equipment Div. 43 — Process Gas & Liquid Handling, Purification & Storage Equipment Div. 44 — Pollution Control Equipment Div. 45 — Industry-Specific Manufacturing Equipment Div. 46 — Water & Wastewater Equipment Div. 48 — Electrical Power Generation

Where’s Waldo? - Finding products Some manufacturers are on board Some are “working on it” Some tell me they don’t know what to do; but are not interested

What do I look for? Performance 1st Happy subcontractor  Happy owner Excellent salesman/woman rep. *Willingness to work with me*

Advice Do not greenwash your marketing materials Leave the definition of LEED credits to USGBC Pick a path and stick with it Budget for change/research/IAQ testing/certifications Get involved – shape your industries future If you’re going to spend time creating a website to “help” - make sure it works

LEED v4: the “new normal” considerations Life Cycle Assessment: What is the life cycle environmental impact of your product? Supply Chain Transparency: Where and how do you get your raw materials? Chemical Hazard Assessment: What is in your product, and is any of it hazardous?

Will you contribute proactively to making your products comply with the new LEED v4 MR credit requirements, or will you sit on the bench and take on the risk of reacting as these trends move into your sector? Are you in the game or sitting on the bench?