SMED principles applied to Formula 1 racing

Slides:



Advertisements
Similar presentations
Chapter 8 Setup Reduction.
Advertisements

Changeover Improvement: SMED and beyond …
Setup reduction / quick changeover
WAREHOUSING MANAGEMENT
Chapter 24 ECONOMIC AND PRODUCT DESIGN CONSIDERATIONS IN MACHINING
02 | Define an Effective End-to-End Software Development Lifecycle Steven Borg | Co-founder & Strategist, Northwest Cadence Anthony Borton | ALM Consultant,
Freeleansite.com The Lean Enterprise Set-up Reduction/ Quick Changeover Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement.
Process Improvement (Lean Concepts) References (sources of graphics): (1)Fiore, Clifford, Accelerated Product Development: Combining Lean and Six Sigma.
Productive Maintenance
Lean Manufacturing Cellular Manufacturing One Piece Flow for Workteams
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
An-najah National University
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment,
1/32 Equipment Efficiency: Quality and Poka-Yoke (Mistake- Proof, 防錯法 ) Operations Analysis and Improvement 2010 Fall Dr. Tai-Yue Wang Industrial and Information.
Equipment Efficiency: Availability, Quality and SMED
Just-In-Time “Eliminate Waste”.
Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
In today’s world technological advances are taking place at a rapid pace. One of the goals of everyone is working towards is to satisfy customer needs.
How to Effectively Implement Set-up Reduction in Any Organization.
Setup Reduction Module
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Quick Changeovers & SMED
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Chapter 8 Setup Reduction.
Value Analysis/ Flow Analysis
Lean Basics Dewey Warden.
Copyright © Six Sigma Academy International LLC All Rights Reserved Setup Reduction.
LEAN system.
JIT and Lean Operations
Single Minute Exchange of Dies
© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name What Lean Means to Printers Young.
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Single Minute Exchange of Die OR Quick Changeover
Lean Manufacturing Chapter 15 pp June 29, 2012.
“Without the Cost of Waste …”
TEAM #9 MEMBERS Ryan Gerst Jared Glatz Kate Gilland Figure 1 (above): Stages of SMED Improvement Figure 2 (left): Reduction of Changeover time at each.
Lean Training Quick Changeover.
Review of Lean Topics Dewey Warden.
Project Chiron SMU TEAM ALCON
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Changeover Plan & Tools Hancor Changeover Team Notes for Discussion December 2, 2004.
In Progress Queensland. Upcoming Events March 13thCIWG – OH&S at Bluescope; (920 Nudgee Rd. Banyo) Free to members and guests 13&14 th RCA problem solving;
QUALITY MANAGEMENT SYSTEM MOHAMMAD FIRDAUS BIN RAMLAN PB13073 MOHAMAD HAFIZ BIN RAMLI PB13066 NORAIN BINTI AB RAHMAN PB13008 NUR ‘AMIRAH BINTI MOHD MUSTAFA.
“Japanese Manufacturing Techniques” & “Uprooting the Toyota Production System” PRESENTED BY: SLAVIK DEMIN & ALON SIMCHONI Based on the articles by xxxxxx.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
LEAN OPERATIONS PROVIDE PRODUCTS OR SERVICES IN RIGHT QUANTITY OF RIGHT QUALITY AND AT RIGHT TIME.
Objectives What is Changeover?
Mel Wendell – Mountain Pointe High School
Equipment Efficiency: Availability, Quality and SMED
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Improving Productivity-When to Consider Automation
Quick Changeover Single Minute Exchange of Dies
Equipment Efficiency: Quality and Poka-Yoke (Mistake-Proof, 防錯法)
Introduction to Lean Emily Varnado.
Quick Changeover.
Total Productive Maintenance and Quick Changeover
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Industrial Engineering Department, Dokuz Eylul University, Turkey
Just-In-Time and Lean Production
Project Chiron SMU TEAM ALCON
Quick Changeovers Definitions Analysis and Methods GEOP 4316.
Visual Factory Three reasons for using visual management tools:
Quick Changeover Techniques
Project Chiron SMU TEAM ALCON
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Production Preparation Process (3P)
Quick Set-Up Technique
Quick Set-Up Technique
Presentation transcript:

SMED principles applied to Formula 1 racing MGMT 6650 8 August 2013

2013 Malaysian Grand Prix pit-stop1 http://www.youtube.com/watch?v=iAHn6W1S1DU

What is SMED? Single-Minute Exchange of Die is one of the many lean production methods for reducing waste in a manufacturing process. It provides a rapid and efficient way of converting a manufacturing process from running the current product to running the next product.2

SMED value to business3 Economic Order Quantity Historically maximize production count to keep unit overhead cost low. High production counts create inefficiencies in other areas. SMED allows smaller production runs while retaining low unit cost. SMED supports just-in-time inventory.

Toyota background4 Shigeo Shingo - Toyota Production System, SMED Changing multi-ton precision dies on vehicle body transfer-stamping machines took anywhere from 12 to 36 hours to complete. By applying SMED Principles Toyota reduced changeover time to less than 10 minutes. Creating an EOQ of less than 1 car.

SMED 8 techniques for consideration5 Separate internal from external operations Convert internal items to external items Standardize the function, not the shape Eliminate fasteners or use functional clamps Use intermediate jigs Adopt parallel operations Eliminate adjustments Use mechanization

SMED 7 Reduction steps6 Observation (A) Separation (B) Conversion (C) Simplification on internal (D) focus on fixings Standardization of external activities (D) similar scale to internal Documentation Repetition

Key observations for improvement7 shortages, mistakes, inadequate verification of equipment causing delays and can be avoided by check tables, especially visual ones, and setup on an intermediary jig inadequate or incomplete repairs to equipment causing rework and delays optimization for least work as opposed to least delay unheated molds which require several wasted 'tests' before operating temperature to work using slow precise adjustment equipment for the large coarse part of adjustment lack of visual lines or benchmarks for part placement on the equipment forcing a changeover between different raw materials when a continuous feed, or near equivalent, is possible lack of functional standardization, that is standardization of only the parts necessary for setup e.g. all bolts use same size spanner, die grip points are in the same place on all dies significant operator movement around the equipment during setup more attachment points than actually required for the forces to be constrained attachment points that take more than one turn to fasten any adjustments after initial setup any use of experts during setup any adjustments of assisting tools such as guides or switches

SMED Techniques in action Separate internal from external operations Tools, tires, crew ready to go Convert internal items to external items Captive wheel-nut Standardize the function, not the shape Each crew has specialized task Eliminate fasteners or Use functional clamps Single wheel-nut Minimal threads Use intermediate jigs Alignment tape with position marks Adopt parallel operations 4 teams – 4 tires, other activities Eliminate adjustments Pre-calibrated air guns Use Mechanization Air guns with backup Jacks

2011 Monaco Grand Prix8 http://www.youtube.com/watch?v=RHUTYpIpBg8

Timing: 00:00:02.05 Art of Pit stop9 By Infiniti Red Bull Racing http://www.youtube.com/watch?v=lfAIvXzRXPc Timing: 00:00:02.05

Record Breaking Pit-stop team

Q & A

Appendix

2012 Championship prize

Sources 1 Anonymous, “F1 2013 – Pit Stop Record at Malaysian GP by Red Bull and Webber,” AutostradaTV http://www.youtube.com/watch?v=iAHn6W1S1DU 2 Anonymous, “Single-Minute Exchange of Die” http://en.wikipedia.org/wiki/Single-Minute_Exchange_of_Die 3 Ibid. 4 5 6 7 8 Max Halliwell, “Red Bull Double Pit Stop Monaco 2011 – Unique Footage – Webber not amused…” http://www.youtube.com/watch?v=RHUTYpIpBg8 9 Anonymous, “Art of Pit Stop,” Infiniti Red Bull Racing http://www.youtube.com/watch?v=lfAIvXzRXPc 10 Anonymous, “The Shingo Prize” http://www.shingoprize.org/the-shingo-prize.html