FUEL MIX DISCLOSURE 29 February 2012. 2 Fuel Mix Disclosure - History Article 3(6) of the Internal Market Directive (Directive 2003/54/EC) Final customers.

Slides:



Advertisements
Similar presentations
All-Island Energy Market Forum James Hutchinson Head of Electricity Markets Ofreg Drogheda 12 March 2004.
Advertisements

Potential Impact on PPA Contracts
1 The Northern Ireland Energy Agenda Regulator’s Briefing 24 April 2008.
1 Loss Adjustment When Exporting Mod 24_11 Reflection of Physical Fixity of Interconnector Flows in Operational Data Transactions hen Exporting Modifications.
CER Presentation to Joint Committee on Transport and Communications Electricity and Gas Price Drivers and Developments 18 th February 2015.
Carbon Reduction Commitment AEA is the Government adviser contracted to develop the CRC scheme Stephen Boyle, Principal Consultant, Climate Change and.
Luan Morina, Head of Department for Energy and Mining The Role of Renewable Energy Sources in Kosovo.
Mod_03_12 Alignment of TSC with Revised VAT Arrangements 29 th May 2012.
Coverage & Reporting in CRC Ian Trim Senior Policy Advisor 26 March 2009.
Russia in global energy context Remarks at the 11th Annual Global Energy Forum by Yevgeny Zvedre, Science & Technology Attaché Embassy of the Russian Federation.
UK Gas Statistics Iain MacLeay – Head Energy Balances, Prices and Publications Date 29 September 2011.
Maine Disclosure and Portfolio Requirements Workshop on Electric Imports and “Emission Leakage” In Support of the Regional Greenhouse Gas Initiative June.
The E-TRACK project is supported by Summary Slides A European Tracking System for Electricity – Phase II (E-TRACK II) April.
UK Energy Efficiency Chris Leigh Household Energy Efficiency and Fuel Poverty Climate Change Group DECC.
NATIONAL GRID Market Evolution in Ireland APEX 2004 Annual Conference Ann Scully Manager, Market Operations ESB National Grid.
Supported by The new Renewables Directive Introduction of the regulations concerning RES-H/C 2. Project Meeting London, 10/11 March.
Energy EU policies on energy efficiency and renewable energy Seminar on Energy security dimension in the EU CSDP 12–13 September 2013 Vilnius Krzysztof.
WHERE DOES OUR ENERGY COME FROM?. Energy SOURCES NON RENEWABLE Do not regenerate as fast as we consume them Risk of running out! Coal, oil, gas RENEWABLE.
©2008 PJM EIS Emissions Tracking in the Generation Attribute Tracking System (GATS) NJ RGGI Working Group Newark, NJ June 5, 2008.
Presentation to Sustainable Energy Ireland 6 May 2003 The Renewables Obligation Catherine Murray Renewables Policy Department of Trade & Industry.
Peter Styles Peter Styles Istanbul, 8 th March 2011 European Federation of Energy Traders Prospects for Integrating and Trading Renewable.
Rpsgroup.com/ireland Climatlantic Energy & Climate Forum March 13th Dublin, Ireland Renewables & Energy Policy 13 th March 2014
WIND ENERGY Is there a Latvian Master Plan? CHRISTIAN KJÆR Chief Executive Officer European Wind Energy Association SSE Riga, 4 December 2008 © EWEA/L.
David C. Schanbacher, P.E. TNRCC Air Program Coordinator Renewable Energy Credit Trading Program.
1 Implementation of the Solar RPS in New Jersey ABA Renewable Energy Panel November 16, 2005 Jan Pepper.
Future Energy Scenarios 2015 Supply Marcus Stewart Demand and Supply Manager.
1 Managing Renewables Integration Valerie Fong Utilities Director Power Association of Northern California September 17, 2013.
Market Integration Project. Background –Single Electricity Market Organisation –EU Internal Energy Market –Context for Market Design Market Integration.
Renewable Energy Credit (REC) Program ERCOT Retail 101.
Renewable Energy Target for Europe 20 % by 2020 EREC European Renewable Energy Council Energy, greenhouse gas emissions and climate change scenarios EEA,
Information - CommunicationDirectorate general for Energy and Transport European Commission The situation of the Directive on electricity from renewable.
Data interaction between the National Emission Inventory and EU ETS in Ireland Workshop on data consistency between National GHG inventories and Annual.
National Seminar Role of DER in the EU and Current Status in the Baltic States 6 March 2007 Current Status of Energy Policy on Development of Distributed.
California’s Renewable Energy Credits (REC) Market Update
Impending Audit Landscape for Data Centres John Booth Carbon3IT Ltd
EU Legislation for Geothermal Energy Luca Angelino European Geothermal Energy Council 8 TH LGA CONFERENCE, V ILNIUS, 23 M ARCH 2012.
Title of presentation and date1 Energy Essentials for Cost Reduction NIPA 4 th October 2012.
Directorate General for Energy and Transport Euroforenet Conference 20/11/2007 Brussels European Commission Kyriakos MANIATIS Biofuels & Industry DG TREN.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
CRC Energy Efficiency Scheme Complying and Reporting Requirements 2012 and rest of Phase 1 Dr Hugh McGinn NIEA ANTRIM CIVIC CENTRE Tuesday 15th May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Single Electricity Market Update Liam Ryan SEMO. Background 2 years in operation Gross Mandatory Pool All Suppliers All Generations units over 10 MW Trading.
Supervisors: Dr. Theodoros Zachariadis Dr. Georgios Martinopoulos Dr. Theodoros Dergiades Marinos Kanellakis MSc in Energy Systems – October 2011 EU Energy.
UK Gas Statistics Iain MacLeay DECC Energy Statistics May 2011.
Croatian Power System 1 The Electric Power System - Croatia -
EPA’s Proposed Federal Clean Power Plan Steve Burr AQD, SIP Section October 6, 2015.
Target: Describe each type of fossil fuel. Explain how it forms, is removed, and is processed. Discuss where it is found and the supply of the fossil fuel.
1. EXAA Trader Group Meeting Angela Puchbauer-Schnabel
Quantifying the Impacts of National Renewable Electricity Ambitions using a North-West European Electricity Market Model Fourth Annual HMRC Forum 24 th.
2007 European Renewable Energy Policy Conference Opening Session Prof. Arthouros Zervos, President of EREC.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
A sustainable approach to procurement Martin Garry Energy Services Manager.
CCL, ROCs & Other Acronyms AL GORE I. Aspects Covered Background – climate change CCL and ECAs Renewables Obligation the RO NFFO, ROCs, LECs, REGOs CRC.
Guarantees of Origin Scheme 30 th November Guarantees of Origin – a brief history EU Directive 2001/77/EC - first mentioned GOs Replaced by the.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
EU Energy R&D Funding David McAuley R&D Programme Manager, SEAI 13th June 2011 HMRC.
Customer Charge On behalf of all DNs 25 October 2010.
Analysis of 500MW of Wave Energy on the All Ireland Market Mr. Paul Deane, Dr. Gordon Dalton, Dr. Brian O’Gallachoir Economics of Ocean and Marine Renewable.
FUEL MIX DISCLOSURE 29 October Fuel Mix Disclosure - History Article 3(6) of the Internal Market Directive (Directive 2003/54/EC) Final customers.
Philippine Feed-In Tariff System Implementation 1.
Implementation of the CHP Directive - overview and outlook Talking competitiveness! New perspectives for CHP/DHC EHP Annual Conference Brussels
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Association of Issuing Bodies (AIB) Christof Timpe, Dietmar Preinstorfer AIB Task Force IRM RECS Open Seminar Verona, 10 March 2006 International Residual.
Renewable Heat Incentive Andrej Miller RHI team Department of Energy and Climate Change.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
South East Europe Regional Consultation Meeting Bucharest, Romania 6 – 7 October 2016 Session II: Opportunities and Challenges in RE Deployment in the.
PRESENTATION OF MONTENEGRO
Consultant - Energy Regulation
Wind energy & EU legislation for Nature conservation
Presentation transcript:

FUEL MIX DISCLOSURE 29 February 2012

2 Fuel Mix Disclosure - History Article 3(6) of the Internal Market Directive (Directive 2003/54/EC) Final customers must see overall Fuel Mix & Individual Mix & related Environmental Info Transposed as Regulation 25 of S.I. 60 of 2005 RES Directive 2009/28/EC No connection between National Targets & Fuel Mix Disclosure

3 Fuel Mix Disclosure – Relevant Papers Decision Paper SEM (Enduring Decision) Consultation Paper SEM Decision Paper SEM (Interim Decision) Related Papers: Decision Paper CER/11/82 Supervisory Framework for Administration of Guarantees of Origin

4 Fuel Mix Disclosure - Objectives Increase market transparency Comply with consumers’ rights Enable consumers to make informed decisions Educate consumers and stimulate electricity generation

5 FMD Label on Customer Bill

6

7 Fuel Mix Disclosure - Overview SEMO completes the calc on an annual basis Required to calculate All Island Fuel Mix Individual Supplier Mixes and Emissions Factors Suppliers submit declarations and ‘claim’ generators (Both in-market and out-of-market)

8 Fuel Mix Categories Coal Natural Gas Peat Renewables Oil Nuclear ‘Other’ Any fuel less than 1% classed as ‘Other’

9 FMD 2010 Breakdown

10 Emissions Factors SEMO calculate an emissions factor for each thermal fuel type Data is sourced from EPA (Ireland) and DOE (Northern Ireland) SEMO applies emissions factors to Supplier mixes to calculate each Supplier’s emissions factor

11 Fuel Mix Disclosure – Interim Calculation Calc based on: Bilateral contracts (in & out of market) PPAs in Ireland Relevant Arrangements in Northern Ireland Bilateral contracts for imports and related REGOs UK Residual applied to Imports not covered by Bilaterals

12 Fuel Mix Disclosure – Enduring Calculation Calc based on: Guarantees of Origin (including Imports) PSO PPAs in Ireland Generator Attributes EU Residual applied to remaining demand

13 GO Certificates – What is a GO Guarantee of Origin 1 MWh value Guarantee that electricity has been produced from a renewable source Examples of renewable sources: Wind, Solar, Ocean Energy, Biomass, Hydropower, Landfill Gas, Aerothermal, Geothermal, Hydrothermal Purpose of GO: to be used in FMD In ROI, GO scheme is administered by SEMO In NI, GO scheme is administered by Ofgem

14 GO Certificates in Fuel Mix Disclosure Legislation came into effect 28 th March 2011 S.I. 147 ROI Scheme only Currently issuing GOs for 2011 These may be used for the 2011 FMD submission May be held over until 2012 FMD submission

15 Imported GO Certificates Ensure REGOs are ‘Retired’ by 31st March 2012 Can do online through Ofgem Registry Any European GOs please inform SEMO ASAP These may not be verified on time for 2011 submission

16 Interaction Fuel Mix and GOs

17 Generator Attribute Pack In order to claim non Renewable generation: Complete the pack Generator advises which Supplier the attributes should be assigned to Done on a quarterly basis

18 Generator Attribute Pack Form

19 Supplier Declarations Supplier may present the information as an All Island Fuel Mix However, submission must be done per supplier licence Supplier must declare: Information provided is true and accurate Valid contracts/PPAs/Relevant Arrangements/Intermediary Arrangements in place Claimed GOs will only be used in this Fuel Mix Disclosure

20 Supplier Declaration Form

21 Key Differences between Interim and Enduring Interim FMDEnduring FMD Supplier ClaimsContracted energy + REGOs (where applicable)GOs (including imported GOs) + PSO PPA contracts + Generator Attributes Residual MixTotal Energy (SEM + out-of-SEM) + Net IC Flow (UK residual) - Supplier Claims Total Energy (SEM + out-of-SEM) - exported GOs - Supplier Claims (excluding imported GOs) + EU Residual Mix (as applied to unassigned energy based on movement of GOs) Overall MixResidual Mix + Supplier Claims Supplier Mix[(Metered Demand – Within SEM Claims) * Residual Mix] + Supplier Claims (including Out- of-SEM) [(Settlement Net Demand – Within SEM Claims) * Residual Mix] + Supplier Claims (including Out-of- SEM)+ Adjustment for unused PSO Generation (ROI only)

22 Key Differences between Interim and Enduring Interim FMDEnduring FMD Loss FactorsIndividual Loss Factor applied to each Generator - (adjust down) Single Loss Factor applied to all demand: representing the difference between Generation (adjusted for Net IC flow) and demand - (adjust up) Imports/ExportsActual Interconnector Flows (UK residual applied to imports) Imported GOs + Exported GOs (EU residual applied to any unassigned generation based on this movement) Other CategoryUnder 2.5% of total GenerationUnder 1% of total Generation Emissions FactorsCalculated by SEMO and applied to Supplier’s Mix

23 Key Differences between Interim and Enduring Interim FMDEnduring FMD Supplier Submission DeadlineEarly May31st of March Publication TimeframeJuly/August30 th of June Data onto billsTwo months after publication (overseen by CER)

24 FMD - Timeline