Development of a Remotely Controlled, Mobile, Thermal Imaging Platform. Adrian Johnson Senior Operations Technician Diamond Light Source Adrian Johnson.

Slides:



Advertisements
Similar presentations
Basic Computer Vocabulary
Advertisements

1 iHome Automation System Home Automation System Team: Million Dollar Contingency Regiment Adam Doehling Chris Manning Ryan Patterson.
A new Network Concept for transporting and storing digital video…………
Presentation by: Serena, Ann & Nicole
Basic fill color R 100 G 160 B 200 Accent 1 ”Logo Blue” R 0 G 39 B 118 Yellow (highlight) R 252 G 217 B 0 Accent 2 R 118 G 118 B 118 OP300 Technical training.
Click Here to Begin. Objectives Purchasing a PC can be a difficult process full of complex questions. This Computer Based Training Module will walk you.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
HOW WELL DO YOU KNOW THE BASICS OF USING YOUR COMPUTER?
Essential Computer Concepts
The Gaze Controlled Robotic Platform creates a sensor system using a webcam. A specialized robot built upon the Arduino platform responds to the webcam.
Wireless Surveillance Vehicle Lance P. Riegert Rodrigo A. Urra Steve C. Wilson September 18, 2007Wireless Surveillance Vehicle1 of 20 Senior Design Project.
Mars Rover By: Colin Shea Dan Dunn Eric Spiller Advisors: Dr. Huggins, Dr. Malinowski.
The Alix.1c microcontroller on board the vehicle runs Fluxbuntu Linux and is connected to a g wireless card and a USB web camera. A background process.
R I T Team Members: Nandini Vemuri → Team Lead, System Testing, Motor Expert Jason Jack → GUI Design, Microcontroller Expert, Website Administrator John.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Remote Surveillance Vehicle Design Review By: Bill Burgdorf Tom Fisher Eleni Binopolus-Rumayor.
EIGHTH GRADE ROBOTICS KITTATINNY REGIONAL HIGH SCHOOL MR. SHEA Introduction to Robotics Day4.
Introduction to Computer Terminology
Introduction to Computers Essential Understanding of Computers and Computer Operations.
Features. ► Support 1 to 4 channels video input. ► Built-in GPS, G sensor ► Built-in wireless module like 3G (EVDO, HSPA, HSDPA), GPRS, WiFi ► G.726 audio.
COGAIN 2009 Petr Novák, Olga Štepánková Home and environment control.
How Computers Work. A computer is a machine f or the storage and processing of information. Computers consist of hardware (what you can touch) and software.
Welcome to Cisco Academy Chapter 1. Objectives Understand Safety Rules Provide common knowledge base –PC Hardware Build bridge between understanding of.
Ruslan Masinjila Aida Militaru.  Nature of the Problem  Our Solution: The Roaming Security Robot  Functionalities  General System View  System Design.
Engaging Undergraduate Students with Robotic Design Projects James O. Hamblen School of ECE, Georgia Tech, Atlanta, GA
Translate the following message:
The New FTC Platform (Connecting your legacy hardware)
Eng.Abed Al Ghani H. Abu Jabal Introduction to computers.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Chapter 2 Hardware. Learning Objectives Upon successful completion of this chapter, you will be able to: describe information systems hardware; identify.
Overview What is Arduino? What is it used for? How to get started Demonstration Questions are welcome at any time.
RFID Enabled Access Limited (R.E.A.L.) Security Christopher Lange, Team Leader Clinton Plaza Paul Brown David Kenney.
Phong Le (EE) Josh Haley (CPE) Brandon Reeves (EE) Jerard Jose (EE)
1 11 CHAPTER Information Technology, the Internet, and You computing ESSENTIALS.
Ewout van Bekkum Chris Gurley Nate Klein. Brief Summary Purpose of project Automated Gigapixel Panorama Acquisition Create a platform to Adjust the camera’s.
Team Members: Faculty Advisors: Christian BaldusDavid Roberts Dr. Arun Somani Isi OamenShawn Yockey Dr. Zhao Zhang Chair-Mounted Computer Workstation Iowa.
Multimedia and Computers Introduction to Computers.
Power Bot Group 2 Luke Cremerius Jerald Slatko Marcel Michael Tarik Ait El Fkih Sponsored By: Aeronix Inc.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
5 th October 2004Hardware – KS41 Hardware Objectives: Computer systems  What do they do?  Identify the hardware that makes up a computer system (PC)
PRODUCT BRIEF The Digilant ® Xtern-Solar is a small but rugged surveillance camera designed for Australia’s harsh environments. The camera is solar powered.
Parts of a Computer Created by Carmen Garzes. An electronic device that manipulates information or data. It can store, retrieve or process data. There.
Group #15 Matt Frank Russell Geschrey.  This project was chosen because of an interest in wireless communication systems, namely BAN's (body area networks)
PCs ENVIRONMENT and PERIPHERALS Lecture 4. An expansion cards: - An expansion card (expansion board) is an electronic circuit board that adds more functionality.
Wireless Bluetooth Controller For DC Motor. Introduction Wireless becoming more and more available and widely used Bluetooth is one of the major players.
Component 8/Unit 1bHealth IT Workforce Curriculum Version 1.0 Fall Installation and Maintenance of Health IT Systems Unit 1b Elements of a Typical.
The entire system was tested in a small swimming pool. The fully constructed submarine is shown in Fig. 14. The only hardware that was not on the submarine.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
© Copyright AD Group Overview Presentation. © Copyright AD Group Introduction  Entry-level Video Server to the DV-IP Range  Offers incredible price–beating.
Operation Status of the RF Systems and Taiwan Photon Source
Senior Operations Technician
Operations Machine Simulator.
VEX IQ Curriculum Smart Machines Lesson 09 Lesson Materials:
Computer Hardware Mr. Singh ICS2O.
HOW WELL DO YOU KNOW THE BASICS OF USING YOUR COMPUTER?
Computer Parts - Internal
Monitoring Robot Prepared by: Hanin Mizyed ,Abdalla Melhem
Computer Hardware and Software
Planned activities on collimator for LS1
SNS Fundamental Power Coupler History
Computer Parts - Internal
Personal Computers and Applications
Guide: Dr. Marcos Esterman
Automatic operation IR rework system Automatic Component placement 2 x K-type thermocouples IR-pyro sensor RPC-camera.
Presentation transcript:

Development of a Remotely Controlled, Mobile, Thermal Imaging Platform. Adrian Johnson Senior Operations Technician Diamond Light Source Adrian Johnson. ARW April 2011

Overview of Diamond Adrian Johnson. ARW April 2011 Opened for Users in Currently 18 operational Beamlines. 4 Beamlines currently under construction. Total of 32 Beamlines by 2017.

Overview of Diamond Accelerators Adrian Johnson. ARW April MeV Linac. 3GeV Booster. 3GeV Storage Ring. Stored Beam currently at 200mA (running in Top up). Target of 300mA (running in Top up). Stable beam to provide steady conditions for Users. Beam position to be stable and reproducible. Beam profile to stable and reproducible. Minimise beam downtime.

The Need Adrian Johnson. ARW April 2011 Assessment of beam induced heating. Assessed by calculation, but needs verifying. Entry with handheld camera after beam dropped not adequate. As we head towards 300mA beam, want to perform thermal surveys of the Storage Ring with stored beam present. To do this needs a remote control thermal imaging camera.

The Working Environment Adrian Johnson. ARW April 2011 Inside the ‘Locked up’ Vaults. Stored Beam present. Blue lighting. Smooth Flooring. Few obstacles. Trenches.

The Working Environment Adrian Johnson. ARW April 2011 Accelerator vaults divided into PSS search Zones. Zone gates at either end and on entrance. Zone gates are interlocked. Traps remote control camera in one Zone. Access only during Machine Development shifts.

Design Requirements Adrian Johnson. ARW April 2011 Capable of capturing Thermal Images. Capable of being fielded in the Accelerator Vaults with beam present. Without affecting the machine operation. Remotely Controlled from the Control Room. Stable and Controllable. Able to recharge batteries to facilitate long term use. Locked in a zone for at least 1 week. Inexpensive. Height Adjustment on Thermal Camera.

Adrian Johnson. ARW April 2011 Hardware Thermal Camera FLIR A320 Pan / Tilt Head Visible light Camera Motorised Lab Jack CoroBot ‘Robotic’ Drive unit

Network set up Adrian Johnson. ARW April 2011 Camera Platform controlled over a Wireless network. FLIR and Axis cameras connected to CoroBot LAN port via a Network switch. CoroBot LAN and WiFi connected via ‘Network Bridge’ in Windows XP. Wireless access point connected to existing ‘secondary’ network in Vault.

Software Adrian Johnson. ARW April 2011 Control Software. Microsoft Robotics Studio, written in C#. Modular Services running concurrently (i.e. each one on a separate thread). Services read from sensors or sends commands to actuators or read/write to other services. Control by communication between services. Used original CoroBot Drive, Motor Encoder control and Input / Output Board Services. New Services written: Motor Control Board (to control Height adjustment motor). Robot Drive Control. Robot Power.

Battery charging Adrian Johnson. ARW April 2011 Modifications for Battery Charging.

Height Adjustment Adrian Johnson. ARW April 2011 Addition of Camera Height adjustment. Speed controlled to accelerate / decelerate smoothly, to prevent tipping. 25cm (40cm full travel) of height adjustment, to put Thermal Camera 1m from floor level.

Control Adrian Johnson. ARW April 2011 Controlled from the Main Control Room. Driven by the on duty Operator. Two Remote desktop sessions. 1 st to the Robot PC. Control GUIs for Driving, Battery Charging and Pan/Tilt head. 2 nd to another Windows PC. FLIR camera software. Axis Camera web page (used for Navigation). Can also be controlled from any PC/Laptop connected to the Network.

Control User Interfaces Adrian Johnson. ARW April 2011

Usage. Adrian Johnson. ARW April 2011 Storage Ring Survey. Nov / Dec 2009 – started survey 250 & 275mA stored beam. High current running and surveys being carried out during Machine Development shifts. Two Zones completed. High current running delayed due to RF cavity issues Verification of correct water flow to Booster RF Cavity following adjustment and manifold modifications. Confirmation that a set of Vacuum bellows was not damaged following a Girder movement. Monitoring of new components installed, during a major lattice change.

Vacuum Vessel Bellows - Results Adrian Johnson. ARW April 2011 RF Off RF On 50kW CW 150mA 600 bunches 200mA 900 bunches

New Installation - Results Adrian Johnson. ARW April 2011 RF Off 200mA 900 bunches 200mA hybrid fill

New Installation - Results Adrian Johnson. ARW April 2011 RF Off 200mA 900 bunches 200mA hybrid fill

Adrian Johnson. ARW April 2011 ItemCost (as of 2009) FLIR A320 Thermal Camera£7500 CoroBot£3000 Axis 213 Camera£1400 Pan / tilt head£130 Motor Control Card£100 Modified Lab Jack£150 Networking Components£50 Misc.£200 Total£12530 Costs Estimated ½ man year of effort from concept to use.

Limitations Adrian Johnson. ARW April 2011 Limitations. The platform can only be used in one PSS zone at a time, due to the Zone Gates. Viewing of components on the ‘far side’ of the Storage Ring is limited to static placement. Battery life when roaming, approx. 1 hour. Radiation damage to the Axis camera. Battery life degradation.

Summary Adrian Johnson. ARW April 2011 An inexpensive Remote Control, Mobile, Thermal imaging camera platform has been developed. It has been in use in the Diamond accelerator vaults, with beam present, for over a year. It has proved to be a useful tool.

End of Presentation Adrian Johnson. ARW April 2011

Hardware Details (appendix) Adrian Johnson. ARW April 2011 FLIR A320 Thermal Camera. 320x240 pixel, uncooled microbolometer. -20ºC to +120ºC or 0ºC to +350ºC temperature range, ± 2ºC accuracy. TCP/IP communication. Hague Pan/tilt camera mount. USB controlled. CoroBot ‘robotic’ drive unit. 1.5GHz PC, 512MB RAM, 802.1g WiFi card, 80GB Hard drive, Windows XP. 4 wheel motorised drive, with differential speed steering controlled via a Lynx motion SSC-23 servo control board. A Phidgets 8/8/8 Interface card to provide 8 Analogue and 8 Digital inputs and 8 Digital Outputs. 10AHr 12V rechargeable batteries, ~2.5hours of run time. Axis 213 PTZ camera. TCP/IP camera. ±170º Pan, -10º to +90º tilt. Low Light mode, with built in Infra Red LED light.

Timescales (appendix) Adrian Johnson. ARW April 2011 Oct Project initiated. Dec 2008 – Specification issued. Jan 2009 – Orders placed. Apr 2009 – All Hardware delivered. June 2009 – First test fielding in Linac (no charging). Hardware and Software Modifications made to facilitate charging. Nov & Dec Survey of Storage Ring started, 250 and 275mA stored beam. High current running and surveys being carried out during Machine Development shifts. High current running delayed due to RF cavity issues.

Timescales (appendix) Adrian Johnson. ARW April 2011 Jan to May 2010 – Modifying Robot to fit Height adjustment and write software. Jun 2010 – Monitoring of Booster RF Cavity water temperatures after flow adjustment. – Monitoring suspect set of bellows in the Storage Ring (150mA 900 bunches). July 2010 – Monitoring Booster RF Cavity water temperatures with increasing power. Aug 2010 – Monitoring suspect set of bellows in the Storage Ring (150mA & 200mA 600 bunches). Sept to Nov 2010 – Monitoring of new ‘Mini Beta’ components in Storage Ring (200mA, 900 & 600 bunches and hybrid fills) Apr Monitoring of second installation of ‘Mini Beta’ components in Storage Ring.

Booster RF Cavity Cooling – Results (appendix) Adrian Johnson. ARW April 2011 RF Off RF On normal ramp RF On 50kW CW

Remote desktop set up (appendix) Adrian Johnson. ARW April 2011