Low material budget microfabricated cooling devices for particle detectors P. PETAGNA and A. MAPELLI On behalf of: CERN PH/DT The NA62 Collaboration EPFL.

Slides:



Advertisements
Similar presentations
Development of super module structures at Glasgow Calum I. Torrie 20 th April 2007.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
Design and Simulation of a MEMS Piezoelectric Micropump Alarbi Elhashmi, Salah Al-Zghoul, Advisor: Prof. Xingguo Xiong Department of Biomedical Engineering,
John D. Williams, Wanjun Wang Dept. of Mechanical Engineering Louisiana State University 2508 CEBA Baton Rouge, LA Producing Ultra High Aspect Ratio.
Figure 7 Design and Simulation of a MEMS Thermal Actuated Micropump Shiang-Yu Lin, Huaning Zhao, Advisor Prof. Xingguo Xiong Department of Biomedical Engineering,
Thermo Fluid Design Analysis of TBM cooling schemes M. Narula with A. Ying, R. Hunt, S. Park ITER-TBM Meeting UCLA Feb 14-15, 2007.
GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 1/9 PH-DT Status of Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
MEMs Fabrication Alek Mintz 22 April 2015 Abstract
– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
DISTRIBUTED CRYOGENIC COOLING WITH MINIATURIZED FLUID CIRCUITS Steffen Grohmann, ETT/TT RD39 Collaboration ST Workshop 2003 CERN, April 01-03, 2003.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
Pressure Tests Results 13/03/2013Collaboration meeting CERN - CSEM1.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Update on Thermal Performance of the Gas- Cooled.
Micro-channel CO 2 cooling for the LHCb VELO upgrade. R. Dumps, J. Buytaert, A. Mapelli, P. Petagna, B. Verlaat CERN A. Nomerotski Oxford University September.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
NA62-GTK special meeting on cooling options
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
1 R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
INTEGRATED CIRCUITS Dr. Esam Yosry Lec. #3. Diffusion  Introduction  Diffusion Process  Diffusion Mechanisms  Why Diffusion?  Diffusion Technology.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
Top Down Manufacturing
CLIC Prototype Test Module 0 Super Accelerating Structure Thermal Simulation Introduction Theoretical background on water and air cooling FEA Model Conclusions.
Convection: Internal Flow ( )
Low Mass Rui de Oliveira (CERN) July
ADVANCED HIGH DENSITY INTERCONNECT MATERIALS AND TECHNIQUES DIVYA CHALLA.
FREE CONVECTION 7.1 Introduction Solar collectors Pipes Ducts Electronic packages Walls and windows 7.2 Features and Parameters of Free Convection (1)
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
CO 2 Cooling: Overview over CMS activities Jennifer Merz RWTH Aachen University, 1. Physikalisches Institut B May CEC General Meeting, Karlsruhe.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
Microfluidic Cooling for Detector and Electronic OUTLINE: Motivations for micro-channel cooling in HEP Micro-technologies involved First possible HEP cases:the.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Microchannel Cooling D. Bouit, J. Daguin, A. Jilg, L. Kottelat, A. Mapelli, J. Noel, P. Petagna, G. Romagnoli – CERN PH-DT K. Howell – Georges Mason University.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 11 Heat Exchangers.
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 8 Internal flow.
Utah Nanofab Design Review Meeting Device Architecture (Top View Layout and Layer Cross Section) Recipes & Settings Standard Concept Equipment & Tools.
Date of download: 9/26/2017 Copyright © ASME. All rights reserved.
For the CMS Pixel detector
Microchannel cooling - Update
BCP Analysis Update Thomas Jones 22/7/16.
Date of download: 10/14/2017 Copyright © ASME. All rights reserved.
Micro-channel Cooling
Hybrid Pixel R&D and Interconnect Technologies
SILICON PIXELS DETECTOR
Update on WG4 A.Tauro - R.Santoro 11/10/11 ITS upgrade meeting.
ALICE PD group meeting Andrea Francescon.
Microfluidic devices for thermal management
WG4 – Progress report R. Santoro and A. Tauro.
Phase II Collimators : design status
For the CMS Pixel detector
Presentation transcript:

Low material budget microfabricated cooling devices for particle detectors P. PETAGNA and A. MAPELLI On behalf of: CERN PH/DT The NA62 Collaboration EPFL – LMIS4 EPFL – LTCM UCL – ELEC/DICE (SOI & MEMS) 30 Sep 20101P. Petagna & A. Mapelli

Outline of the talk 30 Sep 20102P. Petagna & A. Mapelli Why micro-channel cooling for HEP? A first application: local cooling for the NA62 GTK Proposed solution and approach to the problem Micro-fabrication process Structural analysis Thermo-fluid dynamics simulations First tests on a full-scale prototype Layout optimization Next steps and beyond

Why  -channel cooling? 30 Sep 20103P. Petagna & A. Mapelli Radiation length (X 0 ): mean distance over which the energy of a high-energy electron is reduced to 1/e (0.37) by bremsstrahlung 1 – Minimization of material budget (Dahl, PDG) More readily usable quantity: X 0 = X 0 /  [cm] Cu: cm Steel: ~1.7 cm Al alloy: ~8.9 cm Ti: 3.56 cm Si: 9.37 cm C 6 F -20  C : cm K13D2U 70% vf: 23 cm CO  C: cm Minimize material budget Minimize x[cm] / X 0 [cm] (i.e. use material with high X 0 and minimize thickness)  -channel cooling naturally addresses this issue through the use of Si cooling plate and tiny (PEEK?) pipes in extremely reduced thickness Additional advantage: no CTE mismatch

Why  -channel cooling? 30 Sep 20104P. Petagna & A. Mapelli Material budget of the CMS Si-strip tracker (10 layers)Material budget of the CMS Si-Pixel tracker (2 layers) Present LHC large Si trackers (ATLAS and CMS) ~ 2% X 0 per layer SLHC “phase II” upgrade: “significant” reduction needed Future trackers at ILC ~ 0.1 ÷ 0.2% X 0 per layer

Why  -channel cooling? 30 Sep 20105P. Petagna & A. Mapelli 2 – Cooling power enhancement Newton’s law for convective heat flux: Heat transfer coefficient for m-channel system: Hydraulic diameter ~ m or less Nusselt number = 3.66 ÷ 4.36 for fully developed laminar flow Fluid thermal conductivity = 0.05 ÷ 0.11 W/mK for low temperature fluids ~10 3 W/m 2 K  -channel cooling: very high heat transfer coefficients (very small D h possible) and very high heat flux (large S available)

Why  -channel cooling? 30 Sep 20106P. Petagna & A. Mapelli 3 – Reduction of  T between heat source and heat sink With a standard cooling approach, the  T between the module and the fluid ranges between 10 and 20  C (small contact surface + long chain of thermal resistances) With an integrated  -channel cooling approach, the large surface available for the heat exchange (cold plate vs. cold pipe) and the natural minimization of the thermal resistance between the source and the sink effectively address the issue of the  T between the fluid and the element to be cooled Lower temperatures are envisaged for the future Si-trackers at SHLC. This has non-negligible technical impacts on the cooling plants

An example of future potential use 30 Sep 20107P. Petagna & A. Mapelli Concept of module for a “level-0 trigger” SHLC (courtesy of A. Marchioro) Sensor RO chips  -channel cooling plate Manifolds Interconnect

A first application: the NA62 GTK 30 Sep 20108P. Petagna & A. Mapelli

A first application: the NA62 GTK 30 Sep 20109P. Petagna & A. Mapelli

A first application: the NA62 GTK 30 Sep P. Petagna & A. Mapelli Vacuum tank Mag2Mag3 Mag4Mag1 GTK1 GTK3 GTK2 Cedar selects particles with 75 GeV/c sees kaons only Achromat 250 m beam: hadrons, only 6% kaons-> only 20% decay in the vacuum tank into a pion and 2 neutrinos -> out of which only decays are of interest straw chambersRICH hit correlation via matching of arrival times – 100 ps RICH identifies pions straw chambers measure position GTK sees all particles

A first application: the NA62 GTK 30 Sep P. Petagna & A. Mapelli Sensor & bonds: 0.24% X 0 (~200 µm Silicon) RO chip: 0.11% X 0 (~100 µm Silicon) Passive or active cooling plate Final target: 0.10 – 0.15 % X 0 Priority: minimize X 0 Acceptable DT over sensing area ~ 5 °C Dimension of sensing area: ~ 60 x 40 mm Max heat dissipation: ~ 2 W/cm 2 Target T on Si sensor ~ -10 °C Support structure outside acceptance region: ~ FREE Pixels / station (300 x 300  m, 200  m thick) 10 ASICS chips bump-bonded to the sensor

Proposed solution 30 Sep P. Petagna & A. Mapelli Schematic of the layout of the proposed  -channel cooling plate the coolant will enter and exit the straight channels via manifolds positioned on top and bottom. The channels, distribution manifold and openings for the inlet and outlet connectors are etched into a silicon wafer, which is then coupled to a second wafer closing the hydraulic circuit. The final goal is to have both wafers in silicon bonded together by fusion bonding to produce a monolithic cooling element An alternative design, in case of technical difficulties with the fusion bonding process, relies on a flat Pyrex cover 50 µm thick anodic-bonded to the silicon wafer carrying the hydraulic circuit. On top of this flat plate, an additional silicon frame (surrounding the beam area) will be again anodic-bonded. In this way the global structure of the cooling wafer will be symmetric, the effects of coefficient of thermal expansion (CTE) mismatching between silicon and Pyrex will be minimized and the same resistance to pressure and manipulation as in the baseline case will be attained

Approach to the problem 30 Sep P. Petagna & A. Mapelli Take advantage of recent results obtained in two different fields of development:  -channel cooling devices have started to be actively studied for future applications for high power computing chips or 3D architectures. Thin and light  -fluidic devices in silicon are largely in development for bio- chemical applications. Anyway for the first case, where the power densities are extreme, the mass of the device (hence its material budget) is an irrelevant parameter. In the second case the typical values of the flow rate and pressure are much lower. Furthermore, the presence of a low temperature fluid and possibly of a high radiation level is unique to the HEP detector case. dedicated R&D is nevertheless unavoidable for the specific application under study.

Approach to the problem 30 Sep P. Petagna & A. Mapelli The procedure followed to tackle the different challenges and to converge in a limited time on a single device satisfying all the requirements is to move in parallel along different lines of R&D in a “matrix” approach, where the intermediate results of one line are used to steer the parallel developments. Fabrication technique studies Thermo-fluid dynamic simulations Numerical structural simulations Experimental tests Common specs Possible layouts Optimal layout Pressure limits

 -fabrication process 30 Sep P. Petagna & A. Mapelli START: Czochralski silicon wafer polished on both sides (4′′ diameter, 380 μm thick, ohm-cm p-type). (a)A layer of 1 µm of oxide (SiO 2 ) is grown on both sides of the wafer (b)Clariant AZ-1512HS photoresist is spin coated on one side of the wafer at 2000 rpm and lithography is performed to obtain an image of the channels in the photoresist (c)Dry etching of the top layer oxide is used to transfer the micro-channels pattern (d)A second lithography is performed with frontside alignment to image two fluid transfer holes, 1.4 mm diameter, for fluid injection and collection from the two manifolds. (e)Deep Reactive Ion Etching (DRIE) is used to partially etch the access holes down to 280 µm (f)The photoresist is stripped in Microposit Remover 1165 at 70°C (g)and DRIE is used to anisotropically etch 100 μm deep channels separated by 25 µm wide structures in silicon (h)Subsequently the oxide layers are removed by wet etching in BHF 7:1 for 20 min at 20°C (i)At present, the processed Si wafer and an unprocessed Pyrex wafer (4” diameter and 525 µm thick) are then cleaned in a Piranha bath (H 2 SO 4 + H 2 O 2 ) at 100°C and anodic bonding is performed to close the channels with the Pyrex wafer

 -fabrication process 30 Sep P. Petagna & A. Mapelli Scanning Electron Microscope image of the cross-section of 50 x 50  m channels etched in silicon bonded to a Pyrex wafer Finally, PEEK connectors (NanoPort® assemblies from Upchurch Scientific) are aligned, together with a gasket and a preformed adhesive ring to the inlet and outlet on the silicon and clamped. They undergo a thermal treatment at 180°C for 2 hours to develop a complete bond between the connectors and the silicon substrate. The anodic bonding is performed at ambient pressure and T is raised to 350°C then lowered to 320°C. At this stage a constant voltage of 800 V is applied between the Si and Pyrex wafer. In the final production both the processed and the unprocessed wafers will be in 525 µm thick silicon. The bonded wafer undergoes a further processing: this includes a final local etching to obtain a thinner region in the beam acceptance area The resulting wafer is diced according to alignment marks previously etched in Si to obtain a cooling plate with precise external references for integration into the electromechanical assembly 1 mm mm

Structural analysis 30 Sep P. Petagna & A. Mapelli “Sacrificial” samples with different manifold width are produced and brought to collapse by gradually increasing pressure under a high speed camera in order to determine the limit pressure and the exact breaking mechanics varying width 1 – Experiments

Structural analysis 30 Sep P. Petagna & A. Mapelli 2 – Numerical simulations vs. tests Yield stress ~25 MPa [ICES 2009] A simplified ANSYS 2D parametric model has been developed and calculations are checked against experimental results in order to validate the model for further forecasts, including the effect of wall thinning or of geometrical variations

Structural analysis 30 Sep P. Petagna & A. Mapelli 3 – Extrapolations

Thermo-fluid dynamics simulations 30 Sep P. Petagna & A. Mapelli The choice of the cooling fluid circulating in the micro-channels has naturally been oriented towards perfluorocarbon fluids (C n F 2n+2 ), which are widely used as coolant medium in LHC detectors. They exhibit interesting properties for cooling applications in high radiation environment such as thermal and chemical stability, non-flammability and good dielectric behaviour. In particular C 6 F 14 is liquid at room temperature and is used as single phase cooling fluid in the inner tracking detectors of CMS. Properties C 6 F -25°C Density r [kg/m 3 ]1805 Viscosity n [10 -7 m 2 /s]8.2 Heat capacity c p [J/(kg K)]975 Thermal conductivity l [10 -2 W/(m K)]6.275 Based on the properties of C 6 F 14, a mass flow of 7.325*10 -3 kg/s is required to extract the heat dissipated by the readout chips (~32 W) with a temperature difference of 5K between the inlet and outlet temperature of the coolant The results from the analytical calculations performed indicate that the suited range of the micro channel geometry is the following: Width: between 100  m and 150  m Height: between 80  m and 120  m Fin width: between 25  m and 75  m Between 300 and 500 channels to cover the area Flow rate attained with 2 bar  p vs. channel width for a fixed height of 90  m

First tests on a full-scale prototype 30 Sep P. Petagna & A. Mapelli 1mm Inlet Outlet manifold depth 100  m Channel cross section 100  m x 100  m Power density 1 W/cm 2 (50% nominal) Mass flow 3,66 x kg/s (50% nominal) Inlet temperature 18  C Outlet pressure 1bar Laminar flow Channel cross section 100  m x 100  m Power density 1 W/cm 2 (50% nominal) Mass flow 3,66 x kg/s (50% nominal) Inlet temperature 18  C Outlet pressure 1bar Laminar flow Test sample and numerical model

First tests on a full-scale prototype 30 Sep P. Petagna & A. Mapelli Simulated vs. experimental pressure drop

First tests on a full-scale prototype 30 Sep P. Petagna & A. Mapelli Thermal visualization IN OUT Thermograph before injection Thermograph at injection IN OUT Thermograph after few seconds of coolant circulation Heat load simulated by a Kapton heater of suited resistance and geometrical dimension

First tests on a full-scale prototype 30 Sep P. Petagna & A. Mapelli Steady state  T between inlet and surface probes

Layout optimization 30 Sep P. Petagna & A. Mapelli Outlet Wedged manifold, depth 150  m, 280  m and 400  m Optimized geometry for uniform and minimal  P CFD models of the geometry presently under tests have been successfully validated. Further optimization of the manifold geometry and of the channel cross section can then be performed through CFD analysis in order to reduce the amount of samples to be produced for testing purposes Inlet

Layout optimization 30 Sep 2010P. Petagna & A. Mapelli26 Effect of inlet manifold geometry on  P Rectangular manifold, 1 mm wide, 100  m thick, central inlet & outlet Wedged manifold, 1.6 mm Max width, 150  m thick, opposed inlet & outlet Wedged manifold, 1.6 mm Max width, 280  m thick, opposed inlet & outlet Wedged manifold, 1.6 mm Max width, 400  m thick, opposed inlet & outlet

Layout optimization 30 Sep P. Petagna & A. Mapelli

Layout optimization 30 Sep P. Petagna & A. Mapelli two inlets Summary table

Next steps and beyond 30 Sep P. Petagna & A. Mapelli Immediate future 1.Perform full-scale thermal tests in cold (vacuum vessel) 2.Define the details and properties of the Si-Si fusion bonding process (industrial partnership), fix the final thickness and verify with a new series of tests 3.Complete the detailed study of the integration in the GTK module

1.Study  -channels in combination with CO 2 evaporative cooling 2.Challenge the system aspects for larger and more complex detectors (e.g. ATLAS IBL? CMS PIX? LHCb VeLo?) Next steps and beyond 30 Sep P. Petagna & A. Mapelli Next year Two-phase CO 2 vs. single phase C 6 F 14 :  P and  T in a 50 x 50  m channel Two-phase flows comparison:  P and  T in a 50 x 50  m channel plate under the same heat and mass flow for CO 2, C 3 F 8 and C 2 F 6

Next steps and beyond 30 Sep P. Petagna & A. Mapelli Sensor Chips Embedded  -channels! A long-term dream?