Severn Estuary Tidal Energy 1.Call for Proposals 2.Initial Assessment of Options 3.Next Steps 19 September 2008 – Severn Estuary Partnership, Penarth Peter.

Slides:



Advertisements
Similar presentations
TIDAL POWER IN THE UK SENTHIL SUDERSHAN CV. Tidal Power Tides are caused by the gravitational attraction of the moon and sun acting upon the oceans of.
Advertisements

Hinkley Point C: Consultation on Preferred Proposals – Presentation 1 Hinkley Point C: Proposed nuclear development Nigel Knee – Head of Nuclear Policy.
Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
Managing Director, HVPD Ltd
Alternative energy Tidal power-stations. What is a Tide ? Tides are the rising and falling of Earth's ocean surface caused by the tidal forces of the.
21 st July 2014 UKELA Johanna Curran Senior Manager ENVIRON UK SEA: Avoiding the Pitfalls A Practitioners Perspective.
ENVIRONMENTAL ASSESSMENT SEA Jamie Byfield SEA Technical Officer HRA & EIA Cara Davidson Policy Manager.
Not a Bore? Issues of Tidal Power in the Severn Estuary Agenda University of the West of England 30 th June 2008.
Tidal and Wave Energy By: Patrick Blomberg Adam Womack.
Lancaster University Renewable Energy Group Students: Oliver Booth Paul Edwards Gareth McMann Leila Tavendale Supervisor: Dr George A Aggidis. February.
Barrage or What? Engineering Options Prof Colin Taylor CEng FICE Professor of Earthquake Engineering Head, Department of Civil Engineering
Tidal Energy Presented by: Courtney Winter and Quinn Foley.
Severn Tidal Energy The Cardiff/Weston Barrage – Context and Implications Peter K Jones – Environmental Policy Officer.
Turning the Severn tide Liberal Democrat Conference Clydach 11th Oct 2008 Neil Crumpton Energy campaigner Friends of the Earth Cymru.
Ocean Energy. Ocean Thermal Energy Conversion Tidal Power Wave Power.
ESPACE: Decision Testing Framework Thames Pilot Study Tim Reeder & Bill Donovan, Environment Agency Jon Wicks, Halcrow.
Joule Project JIRP106/03 Oct 2006 – Dec 2008 Investigator Team: UoL - Department of Engineering: Richard Burrows, Nick Yates, TS Hedges, DY Chen, Ming.
MTF Rail Development Forum
Severn Tidal Power – a proposal A Barrage of Issues.
Indicative Business Case
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
Investing in our common future Co-financed with the support of the European Union ERDF – Atlantic Area Programme MAREN Project What? Who? Why? What next?
COastal REsearch & POlicy INTegration Working Together for Coastal Planning around the Severn Estuary Dr Tim Stojanovic, Cardiff University/COREPOINT project.
Presentation to the Executive of the Carlisle Partnership 13 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Convection currents (wind and ocean waves), W Evaporation of water, heating of water & ice W Photosynthesis on land and sea, 98.
Marine Planning: The role of the MMO and Partnerships Steve Brooker Head of Marine Planning.
An Online Knowledge Base for Sustainable Military Facilities & Infrastructure Dr. Annie R. Pearce, Branch Head Sustainable Facilities & Infrastructure.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level I.S.393:2005 Technical Guideline.
2 nd Severn Estuary Forum, Clevedon – 7 June 2007 Public engagement with tidal power options Whose estuary is it ? Dr Mervyn Bramley OBE Engineer and Environmentalist.
Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007.
Severn Tidal Power Feasibility Study Severn Estuary Forum 2009 Juliet Austin – Environmental workstream lead, STP study, Department of Energy & Climate.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Norwich Business School Tidal Energy 1 NBSLM03E (2010) Low Carbon Technologies and Solutions: Section 17 N.K. Tovey ( 杜伟贤 ) M.A, PhD, CEng, MICE, CEnv.
T i d a l E n e r g y S a b r i n a S a n t a - C o l o m a & K e l l y O s t r u s z k a.
Hannah Burke & Steven Payne. The Severn Estuary The Severn estuary has a lot of potential for harnessing a large quantity of energy, it is one of the.
Tidal Energy Briana Carroll Kareem Belhadj. WHAT IS IT Sustainable, clean, reliable, widely distributed energy Renewable Tidal power facilities harness.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
The Severn Barrage Presentation to Severn Estuary Forum 8th June 2006
Future Projections: Tidal Power in the UK Alice Sheppard 24 th February 2005.
How Much Power can be Obtained from the Tides? Chris Garrett Dept. of Physics and Astronomy University of Victoria Patrick Cummins Institute of Ocean Sciences.
FRANCES CARR 24th February 2005
Tidal Energy. Contents : Renewable Energy : Renewable energy is generally defined as energy that comes from resources which are naturally replenished.
Investing in our common future Co-financed with the support of the European Union ERDF – Atlantic Area Programme Comparison of Hydro-environmental Impacts.
Brandi Alfaro Sheyla Gonzalez
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
New developments and their interaction in the marine and coastal zones – the developers perspective. Key problems and solutions. Tidal Lagoon Power.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Severn Estuary / Barrage
Mn Association of County Planning and Zoning Administrators
Recipient of James Watt Gold Medal Н.К.Тови М.А, д-р технических наук
IT Power HE collaborations
Severn Tidal Power Feasibility Study
The ISLES Project Bob Hanna
Sioned Evans Jim Poole Keith Williams
Tidal Energy Potential & Future Contribution to UK Energy Mix
Severn Tidal Power Sustainable Development and Severn Tidal Power
Chapter 6 Tidal Power.
A120 EconomicForum Consultation 27 September 2016.
Marco Polo – Towards a policy revision
Water scarcity and droughts
Stakeholder Engagement
Suffolk Chamber of Commerce Transport & Infrastructure Group
Presentation transcript:

Severn Estuary Tidal Energy 1.Call for Proposals 2.Initial Assessment of Options 3.Next Steps 19 September 2008 – Severn Estuary Partnership, Penarth Peter Kydd Director of Planning & Environment Parsons Brinckerhoff Severn Tidal Power Feasibility Study

Severn Estuary Tidal Energy PB BV Consortium Consortium led by Parsons Brinckerhoff appointed by BERR on 28 th April 2008 to undertake the Assessment of Options and Strategic Environment Assessment The consortium is jointly managed by Parsons Brinckerhoff (PB) and Black & Veatch (B&V) and includes over 10 different specialist engineering, cost and environmental consultancies.

Severn Estuary Tidal Energy Route Map – Assessment of Options Short-List of Potential Options SDC Report Call for Proposals Strategic Locations SEA Reasonable Alternatives Assessment Framework SEA Scoping & Early Research Long-List of Potential Options Fair Basis Estimation of Costs, Programme and Energy Yield Optimised Designs, Detailed Assessment of Costs, Programme and Energy Yield Public Consultation Preferred Option SEA Research, Consultation and Assessment Environmental Report and Appropriate Assessment SEA Scoping Report Call for Information

Severn Estuary Tidal Energy Route Map – Assessment of Options SDC Report Call for Proposals Strategic Locations Assessment Framework Long-List of Potential Options Fair Basis Estimation of Costs, Programme and Energy Yield

Severn Estuary Tidal Energy Potential Options RefOption Name B1Outer Barrage from Minehead to Aberthaw B2Middle Barrage from Hinkley to Lavernock Point (As B3 but lands at Hinkley) B3Middle Barrage from Brean Down to Lavernock Point (Cardiff to Weston Barrage) B4Inner Barrage (Shoots Barrage) B5Beachley Barrage F1Tidal Fence Proposal L2Lagoon Enclosure on the Welsh Grounds (Fleming Lagoon) L3General Tidal Lagoon Proposals R1Tidal Reef Proposal U1Severn Lake Scheme

Severn Estuary Tidal Energy Initial Options – Minehead to Aberthaw RefOption Name B1Outer Barrage – 25TWh per year (conventional Barrage) F1Tidal Fence Proposal – 3.5TWh per year (an array of tidal stream turbines proposed by Pulse Tidal)) R1Tidal Reef Proposal – 20TWh per year ( a new technology – Rotating turbine modules using 2 m head) – proposed by Evans Engineering

Severn Estuary Tidal Energy Initial Options – Cardiff to Weston (and variants) RefOption Name B3Lavernock Point to Brean Down – 17TWh per year (conventional Barrage) F1Tidal Fence Proposal – 3.5TWh per year (an array of tidal stream turbines) B2Variant of B3 that runs to Hinkley Point rather tha Brean Down (improved flood defence and grid connections) – proposed by Shawater U1Variant of B3 that employs a 1km wide causeway and adds land, leisure and wave energy developments – Severn Lakes proposal

Severn Estuary Tidal Energy Initial Options – Upper Estuary Options RefOption Name B4Shoots Barrage – 2.77TWh per year (conventional Barrage) B5Beachley Barrage – smaller than B4 but avoids blocking the Wye L2Welsh Grounds – 3TWh/a Tidal Impoundment proposed by Fleming Energy L3Tidal Lagoons – various onshore and offshore locations including options proposed by Tidal Electric extending throughout the estuary.

Severn Estuary Tidal Energy Initial Options – Combinations and Modes of Operation Potential Combinations Tidal Lagoons + Smaller Barrage Multiple Tidal Lagoons Tidal Fence + Smaller Barrage Others subject to further study Modes of Operation Ebb only Ebb and Flood Pump Assisted Multiple Basins

Severn Estuary Tidal Energy Fair Basis Cost and Energy Estimates Application of same principles to all options Costs Breaks each option down into a set of Principal Quantities Applies consistent rates to principal quantities across all options Energy Yield Applies a consistent energy yield methodology across all options Construction Programme Applies the same start date to each option and common assumptions on programme length Operations Common approach to operational costs, maintenance costs and “outage” assumptions.

Severn Estuary Tidal Energy Assessment Framework for Initial Options Initial Screen Technical Feasibility Quantitative Energy Outputs and CO2 savings Levelised Costs Qualitative Environmental Effects Social / Regional and Economic Effects Sensitivity Testing Iterative Approach Review and Updating of Options during assessment

Severn Estuary Tidal Energy Next Steps To confirm short-list of options: Continued dialogue with Proposers to confirm technical data Conclusion of technical analysis Application of Assessment Framework Submission of Conclusions for review by BERR Ministerial Review and Public Consultation on Proposed Short-List