FRENCH PWR’S ULTIMATE HEAT SINKS THREATENED BY THEIR ENVIRONMENT

Slides:



Advertisements
Similar presentations
1 Proprietary and Confidential New Jersey Clean Air Council Public Hearing April 1, 2009 Jeff Halfinger Babcock & Wilcox.
Advertisements

NuScales Passive Safety Approach Update September 2011 Contact Information: Bruce Landrey Chief Marketing Officer Dr. Jose N.
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
WGOE Meeting – 29/31 May 2006 Sub-directorate for power reactors DGSNR – SD2 - 1 Organisation of the operating experience and incident.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
FUKUSHIMA RESPONSE George Attarian 1/21/2013. Fukushima Response Timeline: March 11: Event occurred March 18: INPO IER 11-1 issued (April 15) March 23:
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
GENERATION III AND III+ NUCLEAR POWER PLANT DESIGNS ACR-1000 (Advanced CANDU Reactor) Dr. Şule Ergün Hacettepe University Department of Nuclear Engineering.
ACADs (08-006) Covered Keywords Description Supporting Material Accident Analysis
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
Framatome ANP IP-EUROTRANS Meeting WP 1.5 Progress in safety approach development TEE, March Sophie EHSTER.
EUROTRANS - Helium cooled EFIT Probabilistic assessment of different DHR designs Karlsruhe, November Sophie EHSTER, Laurent VINCON.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Stockholm, May Sophie.
STRAGEGY FOR ENHANCING SHARE OF NUCLEAR ENERGY – Ensuring Safety & viability S.S. Bajaj Chairman, AERB 6 th Nuclear Energy Conclave, New Delhi 14 Oct 2014.
Power Stations Nuclear power stations. Introduction  A nuclear power plant is a thermal power station in which the heat source is a nuclear reactor.thermal.
From the “Le Blayais NPP” flooding in 1999 to the review of French regulation for the protection of nuclear installations against external flooding BgNS.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
Nuclear Energy General Concept. In 2001, total US generation of electricity was 3,777 billion kilowatt-hours.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
EuropeAid/131555/C/SER/RS Safety Procedures in the Chemical Industry Ernst SIMON, Styrian Regional Government, Austria Belgrade, December 2013.
SAFETY OBJECTIVES FOR GENERATION III NPP APPLIED TO EPR DESIGN OPTIONS PRESENTATION 26 – 29 September 2010, Nesebar, Bulgaria WATTELLE Emmanuel IRSN, France.
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
Cologne, Topical Conference Improving Nuclear Safety through Operating Experience Feedback.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
LEADER/ELECTRA Safety Workshop: Petten February 2013 IRSN presentation on its document “ Overview of Generation IV (Gen-IV) reactor designs Safety.
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
1 BREI Conducted Comprehensive Independent Reviews of Passive Heat Removal Systems with Ejectors-Condensers Euratom DEEPSSI Project for the design and.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Risk management and disaster preparedness
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Risk-informed On-Line Maintenance at Cofrentes NPP IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Initiating Event Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
I Overview of EU-APR1400 II Design Concept of Safety Systems III
IAEA TSO-Conference, April 2007, Aix en Provence 1 Independent technical and scientific advice for regulatory decision making L. Hahn, GRS International.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
POWER PLANT THERMAL POWER STATION.
Complementarity of deterministic and probabilistic approaches
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Review of the upgraded severe accident mitigation strategies for the generation II PWRs in France foreseen in the framework of plant life extension International.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Bringing safety performance of older plants on par with advanced reactor designs International Conference on Safety Demonstration of Advanced Water Cooled.
Session Name: Lessons Learned from Mega Projects
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
Group D4. - Nuclear fuel cycle, nuclear waste
IAEA International Conference on Topical Issues in Nuclear Installation Safety, 6-9 June, 2017 Investigation of performance of Passive heat removal system.
EQUIPMENT RELIABILITY AT KOEBERG
HAZOP Guidewords Base Set
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

FRENCH PWR’S ULTIMATE HEAT SINKS THREATENED BY THEIR ENVIRONMENT “Nuclear power for the people” Nesebar, 26-29 September, 2010 Véronique BERTRAND IRSN, France Système de management de la qualité IRSN certifié

SUMMARY Heat sink: generalities Total loss of heat sink at Cruas unit 4 in December 2009 Total loss of heat sink management from the initial design EPR Flamanville 3 pumping station’s design Conclusion Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 2

FRENCH NPPs IMPLANTATION Heat sink - generalities FRENCH NPPs IMPLANTATION 58 reactors in operation (+1 under construction–EPR at Flamanville) 19 sites :  4 coastal Flamanville (2×1300 MWe) Paluel (4×1300 MWe) Penly (2×1300 MWe) Gravelines (6×900 MWe)  1 estuarine Blayais (4×900 MWe)  14 riverside (including 11 with cooling towers) Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 3

Heat sink - generalities Pre-filtration and filtration in the pumping station 2 circuits supplied ensuring the reactor’s cooling Cooling circuit of the nuclear island including safety systems called Essential Service Water System (ESWS) Cooling circuit of the conventional island Conventional island Role of the cooling circuit The cooling circuit of the conventional island isn’t a system important to safety Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 4

Conventional heat sink Heat sink - generalities REACTORS COOLING: CASE WITH COOLING TOWER CONVENTIONAL ISLAND ALTERNATOR TURBINE HEATER CONDENSER MSS AFS FFCS CSS RHRS Conventional heat sink NUCLEAR ISLAND SIS COOLING TOWER Reactor coolant system CCWS Safety heat sink ESWS Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 5

REACTORS COOLING: A SAFETY FUNCTION Heat sink - generalities REACTORS COOLING: A SAFETY FUNCTION ESWS: cooling of an intermediate cooling system, the Component Cooling Water System (CCWS) ESWS and CCWS are systems important to safety ESWS: two redundant trains CCWS responsible for cooling of safety equipment Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 6

PROTECTION AGAINST EXTERNAL HAZARDS Heat sink - generalities PROTECTION AGAINST EXTERNAL HAZARDS External hazards considered from the initial design earthquakes external flooding cold weather snow extreme wind other phenomena External hazards underestimated freezing frazil ice high air temperatures seaweed vegetable matter external flooding with or without extreme wind Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 7

TOTAL LOSS OF HEAT SINK AT CRUAS 4 IN DECEMBER 2009 Expérience feedback in 2009 TOTAL LOSS OF HEAT SINK AT CRUAS 4 IN DECEMBER 2009 CRUAS NPP (900 MWe): 4 units Date of the incident: 1st December, 2009 Rated level 2 on the INES scale Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 8

Total loss of heat sink at Cruas 4 in December 2009 Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 9

Total loss of heat sink at Cruas 4 in December 2009 Train B Unit 1 Unit 2 Train A B Unit 4 Unit 3 Navigation Channel River Rhône Discharge basin Discharge ducts B1 A1 A2 B2 B3 B4 A3 A4 Intake channel Rhône river bed Floating dyke ESWS Galleries trains A & B of unit 1 trains A & B of unit 4 Intake coarse filtration & trash removal system (1 grid/train) – units 1&2 CCWS Building units 3&4 Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 10

Total loss of heat sink at Cruas 4 in December 2009 Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 11

WHAT HAPPENED ? Total loss of heat sink at Cruas 4 in December 2009 01/12/2009 : massive unprecedented blockage ESWS train A unavailable Reactor 4 shutdown ESWS train B unavailable Unit 4: total loss of heat sink  the first time in France concerning a PWR National Crisis Organization activated French public authorities (ASN) Technical support (IRSN) French utility (EDF) Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 12

Total loss of heat sink at Cruas 4 in December 2009 Application of the Emergency Operating Procedures (EOPs) Difficulties in the procedure Unit 4 in a safe state 3 hours later Use of the thermal inertia of the refuelling water storage tank (RWST) reserve Efficient cleaning of filtration device and ESWS/CCWS exchangers Total loss of heat sink lasted 10 hours Units 2&3 partially lost heat sink Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 13

Canadian pondweed plants Total loss of heat sink at Cruas 4 in December 2009 Canadian pondweed plants Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 14

 IRSN started an in-depth analysis of this incident Total loss of heat sink at Cruas 4 in December 2009 LESSONS LEARNT First ever occurrence on a PWR in France Partial loss of heat sink on units 2 and 3 together with the total loss on unit 4 Efficient management needs quick and reliable diagnosis of the situation and mitigation means Need to improve the emergency procedure Use of thermal inertia of RWST water proved to be effective On-site trash rack pre-filtration cleaning devices proved to be insufficient  IRSN started an in-depth analysis of this incident Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 15

OTHER EVENTS Experience feedback in 2009 Frazil ice event at Chooz B NPP in January Vegetable matter ingress in Le Blayais NPP, February and March Drum screens clogging at Fessenheim NPP in December Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 16

CONSEQUENCES Experience feedback in 2009 Action plan from the utility EDF Heat sink operating conditions and design Operating procedures Criteria for emergency organization activation IRSN analysis Characterisation of hazards Monitoring and protection of the pumping station Existing means, procedures, organization Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 17

TOTAL LOSS OF HEAT SINK MANAGEMENT FROM THE INITIAL DESIGN Incident procedure evolution Probabilistic safety assessment (PSA) contribution Loss of heat sink on all units of a NPP Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 18

INCIDENT PROCEDURE EVOLUTION Total loss of heat sink management from the initial design of French NPPs INCIDENT PROCEDURE EVOLUTION Use of the thermal inertia of the refuelling water storage tank (RWST) reserve Emergency heat sink for cooling temporarily the component cooling water system (CCWS) Throughout a containment spray system (CSS) heat exchanger Foreseen enhancement: operation of one reactor cooling pump and one charging pump Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 19

PROBABILISTIC SAFETY ASSESSMENT (PSA) CONTRIBUTION Total loss of heat sink management from the initial design of French NPPs PROBABILISTIC SAFETY ASSESSMENT (PSA) CONTRIBUTION PSA for PWR 900 MWe developed at IRSN Potential scenarios resulting from a total loss of ultimate heat sink with a high frequency Beyond the initial design Implementation of modifications Automatic disconnection of the reactor coolant letdown line Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 20

LOSS OF HEAT SINK ON ALL UNITS OF A NPP Total loss of heat sink management from the initial design of French NPPs LOSS OF HEAT SINK ON ALL UNITS OF A NPP Recently subject to particular attention in France Wide study following the partial flooding of Le Blayais NPP Analysis of the guaranteed available on-site resources Modifications: sufficient required capacities of steam generator water supply Equivalent program for next safety reviews of other series Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 21

EPR Flamanville 3 pumping station’s design Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 22

EPR Flamanville 3 pumping station’s design Improvement of the pumping station’s initial design Four independent water trains Two diversified types of filtration devices with screens and chain filters Strengthening of the cleaning means of pre-filtration and filtration devices Enhanced reliability of head loss measurements to pre- filtration trash racks and filters New system: the ultimate cooling water system (UCWS) Foreseen for cooling an intermediate cooling system, which in turn cools The containment heat removal system (CHRS) The fuel pool cooling system (FPCS) third train Normal supply for ESWS and UCWS: pumping station Diversified cooling source: connexion to the outfall structure Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 23

CONCLUSION Environmental conditions can impact the safety of nuclear reactors  Come back to the initial design 3 lines of defence Prevention: identification and knowledge of hazards  Appropriate design equipment Pumping station: monitoring, detection and protection means  To ensure a permanent ESWS flow rate Management of a total loss of heat sink  To cool the reactor until the heat sink recovery Expectation for EPR Flamanville 3 pumping station: to cope with external hazards Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 24

THANK YOU FOR YOUR ATTENTION Nuclear power for the people – 26-29 September, 2010 – Nesebar, Bulgaria – Page 25