NA 2014-2015 YETS: schedule week by week S. Evrard.

Slides:



Advertisements
Similar presentations
EN/STI investigations during LS1 in TDC2 and TCC2 TDC2: -TCSC (collimator) to be replaced if … TCC2: -Targets Stations T2-T4-T6 *Monitors and Target equipment.
Advertisements

TDC2TCC2 Réunion de chantier In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 03/0/2011 T9 transformation Repeatability test of experimental area.
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Tests of the LH2 target at GSI 2 nd -4 th april 2014 T. Hennino, C. Commeaux (IPN Orsay) T. Heinz, E. Schwab (GSI) The LH2 target.
Friday Cyo (Thu. 22h) Point 6 – After the energy scan of yesterday afternoon, we have discovered generator B2/MKBH-A (One changed during this TS) has around.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
TDC2/TCC2 consolidation EATM 15/07/2014. EN/EL – DC and control cable identification and cut completed – Old light removal in TDC2 – New AUG installed.
YETS ACTIVITIES SPS-NA S. Girod & S. Evrard on behalf of the SBA team, EATM,
TDC2-TCC2 consolidation status report to EATM EDMS October 7 th, 2014 S. EVRARD, EN-MEF, on behalf of the TDC2/TCC2 WG.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
S. Evrard — EN/MEF IEFC Workshop, March 08, 2012 TCC2/TDC2 Shutdown Activities and Consolidation Plans On behalf of the TDC2/TCC2.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
TDC2-TCC2 consolidation status report to RSSO EDMS October 14 th, 2014 E. Harrouch, Q. Bouirek, EN-MEF, on behalf of the TDC2/TCC2 WG.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
SU ACTIVITIES PENDANT LS1 CMS ALICE. Antje Behrens | SU pendant LS1 day| | EDMS | page 2 CMS Quoi (quelles activités prévues pendant.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
NA YETS: schedule week by week S. Evrard.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
TC meeting P2 planning wks 3&4 A.Tauro
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
ABT-EC EYETS Activities 2nd reports
TS2 preparatory meeting
EYETS David Hay EN-OSS.
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EN-STI activities in LHC during EYETS
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
LHCb & EYETS
TE-MSC activities in SPS during YETS
K. Foraz on behalf of OSS members
Experimental Areas – LS2 planning
East Hall under construction
Polarized 3He target installation
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

NA YETS: schedule week by week S. Evrard

Week 51 Painting works in TA801 by Presiozo Repair work of TT84 floor by CE contractor (4/5) ED stop on 19/12 PR PA80 maintenance Light modification H2 zone 152. PPE132 shielding XEMC.516 in PPE 124 Ouverture visee geometres H6 et H8 H6/H8 alignment campaign (TT82 & EHN1)

Week 2 MCWV: Consignations Service removal Plexiglas protection removal Transport to B. 867 Light modification (and cabinet relocation, in week 3) H2 zone 142. PPE132 shielding PR PA80 maintenance MNP22 (Ship) to be moved - CANCELED Installation XTDV GIF: in progress EHN1 gallery cleaning: not started H6/H8 alignment campaign (TT82)

Week 3 Remplacement de 4 réducteurs de pression sur T2 T4 T6 et TCSC (F. Moro) S3,4,5 Repair work of TT84 floor(last section) MCWV: Transport to B. 867 PR 537 (TCC2) maintenance EHN1 gallery cleaning Light modification H2 zone 132. H2: zone 142/134 steel beam installation (with QNL500 & QNL 524 removal/reinstallation) H6/H8 alignment campaign (TT82&TCC2) magnet MBW exchange Starter exchange on TDC2 lights. Cubicle exchange in mezzanine (TCC2 led light control)

Week 4 Remplacement de 4 réducteurs de pression sur T2 T4 T6 et TCSC (F. Moro) S3,4,5 H6/H8 alignment campaign (TCC2) Target T2 T4 T6 upgrade (preparation) Slot for magnet MBW exchange(Friday) Close survey shielding at the end of and TT83 door (by Friday) Overhead crane load test (PA80 & TCC2) MDX cabling and piping installation MDX magnet installation MDX service connexion Covers on DC cable cumbs (Test + implementation) ILS tetra installation Target shielding motor exchange (Fri PM)

TCC2 new MDX S. Girod EM-MEF6

Week 5 Target T2 T4 T6 upgrade (target box, monitors) (lun – mar) MDX support installation (Mar) MDX magnet installation (Mar) MDX service connexion (Mar) Water leaks TDC2 Réparation des fuites et/ou remplacement des vannes si réparations impossible S5 (B. Bannister) Remplacement de 4 réducteurs de pression sur T2 T4 T6 et TCSC (F. Moro) S3,4,5 H6/H8 alignment campaign (TCC2) MBW reinstallation (Mer) H6 collimator exchange (Vendredi) Alignment MDX + collimator + MBW (jeu-ven) MBPL 498 magnet to be installed in H4_134 + RE21 shielding Re-Connexion of vacuum pipes, collars,.. H6 & H8. Beam line configuration for ions H2 H4 H8: Revision des coffrets pompes a vide (Jeu-Ven) Installation peignes TDC2

H4 shielding PPE134 – RE21

Peignes TDC2

MDX

Reducteur de pression

Tableaux VAC

MBW

Week 6 Contingency week RE21 shielding Re-Connexion of vacuum pipes, collars,.. H6 & H8. Beam line configuration for ions H2 H4 H8: 1.pdf 1.pdf Revision des coffrets pompes a vide (Jeu-Ven) All magnets on ! H6/H8 Magnet patrol (after survey) Retrait du materiel Fermeture puits Nettoyage TA801 (aspirateur + nettoyage humide)  mercredi Closure TCC2+TT81+TT82+TT83 on Thu 5 th 5:30 PM DSO test Fri 6 th - Mon 9 th

Week 7 Beam to TCC2: 09/02 PM Scan EHN1 !! NEXT MEETINGS on FRIDAY at 9.00 !! Later MCWV repair and reinstallation before MCWV control cable replacement restart of P+ run in April