Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.

Slides:



Advertisements
Similar presentations
BEAMS (FLEXURE) BEAM- COLUMNS SHEAR / CONC. LOADS
Advertisements

Bracing Configurations
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Reinforced Concrete Design-8
Commercial Framing C D Prints Unit 13.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Connections and Bracing Configurations
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
Chapter 5 Fatigue.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Final Report Terminal X McCarran International Airport.
Reinforced Concrete VS Steel
Chapter 11 Flange splice.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Chapter 19 Floors.
Steel Building Apartment- Design and Build
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
Lake Washington Road project
FLORIDA TECH COMMONS PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Reading Structural Drawings
1 HVACR116 – Trade Skills Structural Drawings. 2.
WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Chapter 2 Introduction to Construction Procedures
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
Moment Connection Requires Bolts Outside the Flanges
1 FRENCH RED CROSS in Grenada CONSTRUCTION OF WOODEN HOUSES ACCORDING TO STANDARDS Tel: / Sugar Mill, St George’s.
Chapter 43 Common Commercial Construction Materials.
Brad Oliver – Structural Option Advisor – Professor Memari.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Private Sector  Buildings and structures built for ordinary people.
IN MODULAR CONSTRUCTIONS
The four basic types of structures are :
Flange Plates to be Welded to Beam Flanges.
Composite Construction
Established in 1955 in Dunaújváros Produce m3 of concrete per year.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Practical Design of PT Buildings
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Structural Systems Design for a Laramie Office Building
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Steel Fabrication & Erection of Belle Chase Primary School Proposal – Fall 2015 ET 494 – Senior Design II Derek Duhon Instructor: Dr. Koutsougeras Advisor:
Design of Bracing Connections in Concentrically Braced Frames
Structural Steel Construction
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
AHSANULLAH UNIVERSITY OF SCIENCE & TECHNOLOGY DEPT
Pearl Condominiums Philadelphia, PA
Structural drawing.
An-Najah National University Faculty of Engineering
Design of a Commercial Shopping Center
Designing a Commercial Shopping Center
Prepared by John R. Henry, P.E. Senior Staff Engineer
Design of a Commercial Shopping Center
Mississippi Riverbank Project (Final Presentation) May 14, 1999
1 Semester Project Design A Multi Story Office Building
BFC Structural Steel and Timber Design
CONNECTION Prepared by : Shamilah
An Najah National University Submitted to : Dr.Munther Diab .
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Multi-Family Fourplex Apartment
Presentation transcript:

Prepared for: Mr. Michael Bolch Shaw Group

Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial office building to be used as a financial institute SW corner of Babcock St. and Palm Bay Blvd. in Palm Bay, Fl Create a construction schedule using MS Project Generate an estimated probable cost Develop construction contracts and terms

Project Management Plan Divided into 3 parts Project Controls Project Scope Project Schedule Structural Design Layout Structural analysis / Member design Connections Hurricane damage mitigation Legal Aspects Contract development & terms Preparation for negotiations Regulatory Agencies

Project Size and Cost Steel structure 2 stories 12,600 s.f. Parking lot Transportation Level of service analysis Water and sewer system design Geotechnical Foundation design Total Estimated Cost: $1,895, ($150.00/s.f.)

Project Design Schedule

Structural Design Key Elements Layout Structural analysis / Member design Connections Hurricane damage mitigation

Anticipated Final Design PANTHER FINANCIAL

Second Floor Layout

Roof Layout

Structural Analysis / Member Design Two Dimensional Dr. Frame Analysis Determining Maximum Shear, Moment, and Axial Loads being less than the Design Load

Structural Elevation Drawing (Transverse View)

Structural Elevation Drawing (Longitudinal View)

Final Member Selection Second FloorDesigned Member Sizes Beam A2 - A3W16 x 45 Beam B1 - B2W18 x 65 Beam B2 - B3W18 x 65 Beam C1 - C2W18 x 65 Beam D1 - D2W18 x 65 Beam D2 - D3W18 x 65 Beam E2 - E3W16 x 45 Beam B4 - D4W12 x 53 Girder A1 - B1W16 x 77 Girder A2 - B2W16 x 77 Girder A3 - B3W16 x 77 Girder B2 - D2W12 x 53 Girder D1 - E1W16 x 77 Girder D2 - E2W16 x 77 Girder D3 - E3W16 x 77 Girder B3 - B4W14 x 38 Girder D3 - D4W14 x 38 Frames (Roof)Designed Member Sizes Beam B1 - D1W12 x 35 Beam B3 - D3W12 x 35 Girder A1 - A2W14 x 38 Girder E1 - E2W14 x 38 ColumnsW12 x 120 Frames (2nd Floor)Designed Member Sizes Beam B1 - D1W12 x 53 Beam B3 - D3W12 x 53 Girder A1 - A2W16 x 45 Girder E1 - E2W16 x 45 Stair ColumnW8 x 31 Stair BeamW8 x 58 ColumnsDesigned Member Sizes A3W8 x 31 B2W8 x 31 D2W8 x 31 E3W8 x 31 B4W8 x 31 D4W8 x 31 RoofDesigned Member Sizes Beam A2 - A3W14 x 68 Beam B1 - B2W16 x 50 Beam B2 - B3W16 x 50 Beam C1 - C2W16 x 50 Beam D1 - D2W16 x 50 Beam D2 - D3W16 x 50 Beam E2 - E3W14 x 68 Girder A1 - B1W14 x 68 Girder A2 - B2W14 x 68 Girder A3 - B3W14 x 68 Girder B2 - D2W12 x 35 Girder D1 - E1W14 x 68 Girder D2 - E2 W14 x 68 Girder D3 - E3W14 x 68

Connections / Drawings Shear Connections are bolted Moment Connections are shop-welded and bolted ConnectionBolted ConnectionWelded Connection A3 Web Shear Connection 6 - 1/2" A325 Bolts - L2 1/2 x 2 1/2 x 1/2 Angle Min Edge Distance: 0.632" Min Spacing: 1.33" A3 Flange Shear Connection 6 - 1/2" A325 Bolts - L2 1/2 x 2 1/2 x 1/2 Angle Min Edge Distance: 0.632" Min Spacing: 1.33" A2 Web Shear Connectin 4 - 1" A325 Bolts - L6 x 6x 3/8 Angle Min Edge Distance: 0.95" Min Spacing: 2.667" B1 Moment Connection 2 - 1/4" A36 Steel Plates - 2L6 x 3 1/2 x 3/8 Double Angle - 3/4" diameter A325 (X) Bolts Min Edge Spacing: 1 1/4" Web 1/8" Fillet Weld 2L6 x 3 1/2 x 3/8 Double Angle Length: 6" Location: All Around B3 Web Shear Connection /4" A325 Bolts - L3 1/2 x 3 x 5/16 Angle Min Edge Distance: 3/4" - Min Spacing: 3.33" B3 Flange Shear Connection /4" A325 Bolts - L3 1/2 x 3 x 5/16 Angle Min Edge Distance: 3/4" Min Spacing: 3.33"

A3 Web-Shear Connection 6 – A325 ½” bolts based on Slip Critical Strength L2½” x 2½” x 1/2 Double Angles based on Areas

Column Base Plate Drawings

Work Breakdown Structure GENERAL WORK BREAKDOWN DURATIONHOURS SALARYBUDGET STARTEND RESPONSIBLE ENGINEER PLANNEDACTUAL$/HRPLANNEDACTUALDONE % COMPLETE PRELIMINARY DESIGN (50% SUBMITTAL) STRUCTURAL ANALYSIS 17-Oct24-Oct 26 $ -YES100% STAIRS 17-Oct24-OctCRAIG22 $ $ YES100% COLUMNS 17-Oct24-OctCRAIG65 $ $ $ YES100% BEAM 17-Oct24-OctCRAIG66 $ $ YES100% FRAMES 17-Oct24-OctCRAIG68 $ $ $ YES100% GIRDER 17-Oct24-OctCRAIG65 $ $ $ YES100% STRUCTURAL DESIGN 17-Oct24-Oct 2012 $ -YES100% CONNECTIONS 17-Oct24-OctCRAIG10 $ $ YES100% BRACING DESIGN 17-Oct24-OctCRAIG102 $ $ $ YES100% FINAL DESIGN (95-100%) PROPOSAL STRUCTURAL DRAWINGS 31-Oct5-Dec 1215 $ -YES100% PLANS 31-Oct5-DecCRAIG46 $ $ YES100% SECTIONS 31-Oct5-DecCRAIG44 $ $ YES100% DETAILS/CONNECTIONS 31-Oct5-DecCRAIG45 $ $ $ YES100%

Hurricane Damage Mitigation Constructed on raised foundations above sea level Built upon steel, concrete, or wooden pilings or anchored to solid rock All concrete is reinforced with steel Specialized doors and windows Using shutters over doors and windows during hurricanes

Legal Aspects Contract Development Preparations for Negotiations Permits, Licenses, Agencies

Contract Development-1 Contract Development for Panther Financial Description of lands/site Contractors Responsibilities Labor Schedule Permits Owners Responsibilities Communication Payments Insurance

Contract Development-2 Change Orders Claims Tests and Inspections Dispute Resolution Good Faith Negotiations Mediation Arbitration Litigation Liquidated Damages

Negotiations Preparation for Negotiations Gather outside information Establish points of leverage Set a goal BATNA Shoot for a Win - Win conclusion

Permits, Licenses, Agencies Follow codes and regulations Acquire permits and licenses Keep in good standing with agencies and the public

Project Summary Scope Schedule Estimated Cost Structural Design Contract Development Negotiation Tactics Codes, Permits, and Licenses

Thank you for choosing The Shaw Group, Inc. Project plan will meet client’s goals We will produce a quality project We appreciate your business Your Project Manager Stephen M. Craig (412)