H. Sterner E. Thurow Energiewerke Nord GmbH

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
EPSON STAMPING ISO REV 1 2/10/2000.
Contractor Safety Management
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
Project Cost Management Estimation Budget Cost Control
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
The Fundamentals of Enterprise Resource Planning Olayele Adelakun (Ph.D) Assistant Professor CTI Office: Room 735 CTI 7th Floor Phone: Fax:
Quality Management System
INDUSTRIAL & SYSTEMS ENGINEERING
Managing the Information Technology Resource Jerry N. Luftman
Software Project Transition Planning
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
1 Preparing a decommissioning project H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 1.
TRP Chapter Chapter 4.2 Waste minimisation.
MODULE “STRATEGY DEVELOPMENT”
EM15 – Contractors COST MANAGEMENT
Process Engineer’s Role in Project Management Dr Abdullah Malik.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Logistic Management of investment-construction project TRANSMARKET GROUP.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
CONTROL & BUDGETING Dr.M. Thenmozhi Professor Department of Management Studies Indian Institute of Technology Madras Chennai
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
1 Preparing a decommissioning project (part III) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3.
From Research Prototype to Production
Project implementation under DIS PRESENTATIONby Mr. Gábor Rónaszéki CFCU Hungary 30 November 2006.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
Tom MAZOUR IAEA, Division of Nuclear Power
PLANNING AND SCHEDULING
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Page 1 Social aspects of decommisioning Workforce redeployment for decommissioning __Experiences from decommissioning of the Greifswald NPP _______________________________________________.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Marketing Planning.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
The Business Plan: Creating and Starting the Venture
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Needles Powers Crosson Principles of Accounting 12e The Budgeting Process 22 C H A P T E R ©human/iStockphoto.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Planning and Realisation of Wind Farms
Roles and responsibilities PM
ISO/IEC
Purchasing supplies at CERN
Systems Analysis and Design in a Changing World, 4th Edition
Systems Implementation,
Purchasing supplies at CERN
Quality Management Systems – Requirements
Product Development Scenario Overview
RCF Plenary Session 21 September 2018
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Presentation transcript:

H. Sterner E. Thurow Energiewerke Nord GmbH PROJECT MANAGEMENT H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner, E. Thurow, EWN, chapter 4

Project management € PROJECT INFORMATION SYSTEM System analysis of company Decommissioning Project structure plan Working package strategy and personnel development concept planning approval Decision tree Project yes no Capacities Cost Time limits Technical Part project Responsibilities concept yes no Working packages KKR KKR Plant KGR Contamination PROJECT KGR inventory unit 1-5 INFORMATION unit 1-5 atlas SYSTEM Time schedule / Personnel capacity Cost / Mass flow / Critical path plan Money flow Disposal Dose application €

Project management Boundary conditions Establishment of project strategy Project structure Project planning/calculation Project realisation Project controlling Summary

1. Boundary conditions political: technical: financial: social: acceptance by authority and public legal/licensing constrictions specific local conditions political: technical: plant and site conditions plant design availability of fuel storages waste management possibilities and disposal options financial: availability of budget cash flow personnel age and competence personnel strategy integration in project privatisation strategy social:

2. Establishment of project strategy Basis Plant inventorization - activity - material and masses - documentation Plant condition - necessary backfitting - presence of fuel and waste - buildings Company objectives

Inventory (mass flow) Overall plant KGR 1 800 000 Mg Radiologically unrestricted material (buildings and facilities) 1 235 000 Mg Other radioactive residuals 565 000 Mg Dismantling plant parts 68 000 Mg Concrete as radioactive waste or fro decay storage 26 000 Mg Package production, sorting according to material and radiology Air locks, buffer storages, treatment stations Controlled reuse and utilization in nuclear facilities (Class E) 4 000 Mg Decay storage (Class D) 28 000 Mg Unrestricted release (Class A) 511 100 Mg Disposal as conventional waste (Class C) 3 500 Mg Restricted reuse and utilization (Class B) 2 500 Mg radioactive waste (Class F) 16 000 Mg Remaining building structures for free classing 471 000 Mg

Key issues personnel licensing project management dismantling waste management site reuse

Basics for the project analysis fresh and spent fuel management waste management dismantling strategy mass flow logistic post operation personnel strategy site reuse options define main dependencies between activities define mile stones and overall project life time prepare key decision plan (with arguments)

Project analysis - overview

Key decisions by EWN direct dismantling instead of safe enclosure necessity of a new dry spent fuel storage necessity of an interim storage with treatment capabilities for radioactive material from dismantling due to lack of final disposal capacities project realisation by own staff instead of contractors site reuse for industrial and energetic uses instead of green field

3. Project structure definition of main project parts technical concept basic time schedule work break down

Work break down structure EWN

Basic time schedule No Activity 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 1 Decommissionig license 2 License for operation of the interim storage north 3 Buildings free of activity 4 Site free release measurement terminated 5 Exemption from atomic law 6 Greenfield 7 Backfitting 8 Conditioning operational waste 9 Loading of fuel into interim storage 10 Dismantling monitored area 11 Remote dismantling test 12 Dismantling controlled area 1-5 13 Remote dismantling unit 1-4 14 Building decontamination 15 Building demolition

Organisational issues organigram main responsibilities basic handling structure

Organigram of EWN GmbH 2000

Organisation principles – main responsibilities legend: PM - project management OD - operational departments responsible assistance what to do PM OD when to do PM OD capacity planning PM OD (how much where) how to do OD PM who is doing OD -

Organisation principles – basic handling structure PM - responsibility OD - responsibility

Project structure list - Work breakdown (extract) A Megaproject A1 Decommissioning KGR A16 Demolition buildings A1601 Demolition planning buildings A1603 Demolition reactor hall unit 3 and 4 A160301 Dismantling floor liner A1607 Demolition waste buildings A1613 Demolition wet fuel storage

Project structure list - Work breakdown (extract) Megaproject Megaproject A1 A1 Decommissioning KGR Decommissioning KGR A11 A11 Dismantling monitored area units 1 Dismantling monitored area units 1 - - 4 4 A1101 Dismantling planning A1101 Dismantling planning A110104 Dismantling planning generator A110104 Dismantling planning generator A1103 Dismantling monitored area (rooms) A1103 Dismantling monitored area (rooms) A110304 Dismantling facilities turbine hall unit 1 A110304 Dismantling facilities turbine hall unit 1 A110304 Dismantling facilities turbine hall unit 1 A11030404 Dismantling generator 2 A11030404 Dismantling generator 2

Project structure list - Work breakdown (extract) A Megaproject A5 Waste management A51 KGR (Greifswald) A5101 Planning waste management A5102 Radioactive waste A5103 Conventional waste A5107 Containers A52 Waste management fuel elements (KGR) A5201 Fuel elements units 1-5 A5202 Sale of fuel elements A5203 Fuel elements wet storage

Interrelated project structures (1) Work breakdown structure Responsibility structure V R Project Project leader Part project Project engineer Program Technical responsible Object structure O Site Plant Building Building part

Interrelated project structures (2) Type of work T Main category Detailed category Phase structure P Main phase Sub phase

Project information system (Master Planning Tool–MPT) The IT-tool has to support the whole process of the project management with - precise planning data, - precise cost calculation data as well as to realize a careful and complete - mass flow supervision, - activity flow supervision, - project supervision.

Master Planning Tool (MPT)

Master Planning Tool – modules A registration modules A1 project structure/object structure (inputs) responsibilities, budget, project live time, connections/conditions A2 inventory 1) mass 2) description 3) geometry 4) origin (room, building) A3 dose rate/contamination 1) dose rate catalogue of rooms 2) contamination catalogue of inventory

Master Planning Tool – modules B planning/calculation B1 work estimates (mh), work preparation modules B2 personnel planning (departments) B3 cost estimation (calculation, planning) B4 scheduling/mile stones/dismantling planning

Master Planning Tool – modules C supervision modules C1 mass flow C2 demands on manpower (within) and contracting (outside), claim of deliveries and performed work per activities C3 comparison - nominal/actual 1) time (%) 2) cost (€) 3) manpower (mh)

Master Planning Tool – modules D information modules D1 documentation D2 reports (data concentration, actual situation, estimation for future)

4. Project planning/calculation 29

Cost structure and calculation principle Cost package groups 1 Planning 2 Execution 3 New installation 4 Waste disposal 5 Operation / Overhead Cost packages for preparation and execution: 1 Dismantling in the monitored area 2 Manual dismantling in the controlled area 3 Remote dismantling in the controlled area Masses 4 System decontamination or other 5 Dismantling of contaminated building parts plant specific data 6 Demolition of building parts Specific cost factors for 1 Personnel expenditures 2 Material costs Manpower / 3 Auxiliary costs Costs

Cost package list (extract) Cost package groups CPG 1: Planning 1.1 Dismantling planning 1.3 Demolition planning CPG 2: Execution 2.1 Dismantling monitored area 2.2 Dismantling controlled area 2.3 Remote dismantling 2.4 Decontamination CPG 4: Waste management 4.1 Radioactive waste 4.3 Containers, transport and handling equipment 4.4 Free release / conventional dump

Calculation and planning steps primary process of calculation dismantling mass cost specific dismantling capacity X Mh [kg] factor needed [Mh] kg secondary process of calculation specific factor [%] capacity needed [Mh] dismantling capacity needed [Mh] X

Cost calculation-specific factors example 1 Monitored area Correction factor name size name size 1. manpower preparation VPU1 2% preparation VPU2 5% execution VPU1 2% working place preparation 2% removal of insulation 0,05 Mh/kg dismantling (execution VPU2) 0,022 Mh/kg dismounting, i.e. no dismantling 0,86 lack of space 1,20 internal transport 7% radiation protection 6% documentation 2% 2. direct costs consumables 0,08 €/kg contractor 0,03 €/kg tools 0,03 €/kg special tools case by case

Cost calculation-specific factors example 2 Controlled area Correction factor name size name size 1. manpower preparation VPU1 3% preparation VPU2 10% execution VPU1 10% working place preparation 4% r e m o v a l o f insulation 0,16 Mh/kg dismantling unit 5 0,026 Mh/kg dismounting, i.e. no dismantling 0,86 (execution VPU2) dismantling unit 1-4 0,036 Mh/kg lack of space 1,1 - 1,2 internal transport 12% radiation protection 12% documentation 2% 2. direct costs consumables 0,11 €/kg contractor 0,04 €/kg tools 0,18 €/kg special tools case by case

Project management – calculation step: example for manpower 12050224 - Dismantling reactor hall unit 1/2 - room group 04 - 2 CPG 2.2 Dismantling mass: components/facilities: 500 Mg isolation: 50 Mg step 1: dismantling - components/facilities 500 000 kg x 0,036 Mh/kg = 18 000 Mh removal of isolation 50 000 kg x 0,16 Mh/kg = 8 000 Mh 26 000 Mh step 2: preparation VPU1 26 000 Mh x 3 % = 780 Mh preparation VPU2 26 000 Mh x 10 % = 2 600 Mh internal transport 26 000 Mh x 12 % = 3 120 Mh radiation protection 26 000 Mh x 12 % = 3 120 Mh documentation 26 000 Mh x 2 % = 520 Mh 10 140 Mh å = 36 140 Mh

Project management – calculation step: example for direct costs 12050224 - Dismantling reactor hall unit 1/2 - room group 04 - 2 CPG 2.2 Dismantling mass: components/facilities: 500 Mg isolation: 50 Mg 1. consumables 550 000 kg x 0,15 €/kg = 84 363 € 2. contractor 550 000 kg x 0,04 €/kg = 19 684 € 3. tools 550 000 kg x 0,26 €/kg = 140 605 € 4. special tools å = 244 653 €

Development of specific factors - example

5. Project realisation – key position of working packages Project calculation Working package Detailed project planning Project Part project Program Activity Action Task Basic time schedule Detailed time schedule Time Costs estimated costs planned costs top down bottom up

Project realisation - approval procedure for performing of working packages check of (by PM) - meeting the starting conditions - budget control - availability of own personnel capacities commitment for realization by PM PM orders: - subcontractors - investments (through the commercial department) PM releases: - manpower and life time/mile stones (to the operational departments)

Project realisation I T S Y S T E M purchase order [contractor; hardware] contract/ order realisation invoice payment direct costs working package approval budget I T S Y S T E M analysis own work (EWN) work order sub work order time sheets realisation

Project realisation - registration of actual data claiming of working orders registration of dismantled material (mass flow supervision) invoice of contractors (services) time consumption used manpower kg direct costs schedule/ mile stones checking period: bi-weekly / monthly checking level: activities OD MPT PM

6. Project management - controlling tasks assessment of differences between actual and nominal data adaptation of cost specific factors and correction factors control of the exploitation of manpower capacity (mh) and dismantling productivity (kg/mh) feedback of correlated factors into the planning tool of the MPT (project information system) shifting of working packages outside the critical path on time (smoothing of capacity peaks)

Project management -controlling: time schedule Licensing time schedule Basic time schedule EWN Execution planning Dismantling ... A 1305 Activity . Action A 130503 mile stone license issued License 1 License 2 License 3 G l o b a ( t p ) c n r i g D e d detailed time schedules basic time schedules

Basic cost controlling - example EWN - long term cost complete project time medium term costs 5 year yearly costs 1 year Ministry of Finance estimated actual costs medium term planning project licensing yearly planning yearly budget update each 2 years yearly update yearly update monthly update C H A N G E S I N P R O J E C T (time schedule, costs, capacities)

Basic time schedule (extract) EWN

Yearly project costs

Project management – controlling: personnel capacities and categories – 1st calculation + 2 3 4 w e f o b h y c x p v

Project management – controlling: personnel capacities and categories – 2nd calculation 1 + 2 3 4 w e f o b h y c x p v

Project controlling; meeting basics Category Frequency PL-meeting daily operative issues Project Leader, Project Engineer PM-meeting weekly operative issues Project Manager, Project Leaders Time schedule bi-weekly critical path issues PM, PL, Techn. Dept., purchase Cost-meeting monthly costs > 50,000 € PM, PL, TD, purchase, finance Company-meeting semi-annually strategical issues as above + costs, personnel and directors

Quality Assurance Programme Instructions 1 Organisation 2 Planning 3 Procurement and storage 4 manufacturing, installation 5 Post operation 6 Maintenance commissioning site operation decommissioning waste management 7 Treatment of deficiencies 8 Documentation 9 Audits

Procurement Systematic executing of procedures for purchasing material, equipment and services needed for the project, in time and cost effective. Establishing procurement criteria and procedures Interaction with the project scheduling and budgeting activities Pre-qualification procedures Standard documents for proposals, tender calls, contract conditions and purchase orders Assessment of bids Administration of contracts QA System

Reporting / documentation by PM preparation of management decisions (to change the project strategy) reports on actual status of project performance estimation of project performance (forecast) preparation / justification and issue of a new revision of the project performance (each two years)

7. Summary of main issues decommissioning plan and inventory project analysis for key decisions - spent fuel and operational waste management - mass flow logistic from dismantling - plant adaptation for operational cost reduction / investments clarify operational and decommissioning modus with licensing authority project work break down - clear and easy structures, connections and conditions project planning - necessity of project manual project controlling - continuous registration of actual data and feed back