Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.

Slides:



Advertisements
Similar presentations
Geneva, 28 May 2010 Q13 Activities on Time Synchronization Jean-Loup Ferrant, Calnex, Q13 Rapporteur Stefano Ruffini Ericsson, Q13 Associated Rapporteur.
Advertisements

1 3GPP TSG T1 #3 T Proposal for Document Structure TSG T1 #3, Miami, th June, 1999.
1 Femto Cell System Overview S.P Status Update to CDG and Femto Forum Fukuoka, Japan, September 2010.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 1 1 All you always wanted to know about.
Way forward for LTE DL 4Rx AP SI on RF
© NOKIAProduced as informative material for 3GPP RAN WG1 meeting No. 2 Downlink Shared Channel - DSCH DSCH associated with a dedicated channel (DCH) Downlink.
Environmental Management System (EMS)
Telecommunications and Multimedia Unit UTRA TDD Overview Agostinho Castro Rui Sarmento Castro
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/18 CJK-IMT Activities Update from ARIB MORIWAKI, Tetsuro
Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 1 PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, 2.
3GPP TSG RAN WG 4 Meeting #1 Howard Benn Convenor Tdoc TSG R4#1(99)018.
Overview.  UMTS (Universal Mobile Telecommunication System) the third generation mobile communication systems.
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
Summarizing baseline results Nokia Networks 3GPP TSG RAN WG1 Meeting #81R Fukuoka, Japan, 25 th – 29 th May 2015 Agenda Item:
1 On the road with 3GPP 3GPP’s Long Term Evolution and System Architecture Evolution projects.
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
PROPOSALS THE REVIEW OF THE 1958 AGREEMENT AND THE INTRODUCTION OF INTERNATIONAL WHOLE VEHICLE TYPE APPROVAL (IWVTA) IWVTA Informal Group WP th Session.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
TP#13 oneM2M testing discussion TP#13 Source: Laurent Velez, ETSI, Meeting Date:
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
1 IS-2000 Release A Sync Channel Problem Resolution MotorolaNokia.
Draft progress report of GRSG informal group on Accident Emergency Call System (AECS) Transmitted by chair of IWG AECS Informal document GRSG-106-ХХ 106.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
WP5D Meeting Results Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in.
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
1 Approved Terms of Reference for HAPUA Working Group No.5-ESI Services Project 6 Bilateral Contract Benchmarking.
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
To Satisfaction of the Administration Seminar on the Implementation of measures to ensure that safety standards are “to the Satisfaction of the Administration.
LTE Introduction Tzu-chin Liu 15th March 2012.
Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation ETSI RTEGSM-R #18 ETSI & GERAN update on ER-GSM band introduction 27.
Doc.: IEEE /065r1 Submission February 2000 Tom Siep, Texas InstrumentsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Proposal for Document Structure
Way Forward on UE measurement definition and capability
CT WG6 status report to TSG CT #75
ETSI–3GPP NGN ACTIVITIES
ETSI–3GPP NGN ACTIVITIES
ETSI technical activities report for ECC March 2017
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R
3GPP PCG#2_05 Moscow, Russia, 6 October 2008
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2
Motorola Mobility, Lenovo, …
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
الوحدة 20 مهارات التواصل مع الآخرين
3GPP Status.
Sheung Li Task Group J Chairperson January 17, 2003
education and training systems (UOE)
Opportunity Driven Multiple Access
Evaluate the effectiveness of the implementation of change plans
Chapter 1: Introduction
Eurostat – Unit E2 Arturo de la Fuente
EMS Development Course for Government Agencies
Informal document GRE Rev.1
ARIB Standards Development for Broadband Wireless Access systems
ETSI–3GPP NGN ACTIVITIES
GSC IMT Task Force Report
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
Informal document GRE-80-0X
TTA Activities on IMT-Advanced standardization
ETSI TC MTS WG TST introduction
3gpp-liaison-report-may-2005
Presentation transcript:

Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception (TDD) (S4.03 System level protocol aspect) to be discussed at joint meeting S4.11 Basestation conformance testing (FDD) S4.12 Basestation conformance testing (TDD) S4.13 Basestation EMC R4.01 RF System scenarios Tdoc TSG R1#1(99)022 Tdoc TSG R4#1(99) 017

R4.00 Introduction Scope –This document introduces the specifications and technical reports written and maintained by RAN WG 4. It will contain the workplan in a temporary chapter. Editor –Mr Takami, DoCoMo

S4.01 Radio transmission and reception (FDD) Scope –This document establishes the minimum RF characteristics of the FDD mode of UTRA. Editor –Mr Fernandes, Motorola –Mr Skold, Ericsson

S4.02 Radio transmission and reception (TDD) Scope –This document establishes the minimum RF characteristics of the TDD mode of UTRA. Editor –Awaiting confirmation from candidate

S4.03 System level protocol aspect Scope Editor –Awaiting confirmation from candidate

S4.11 Base station conformance testing (FDD) Scope –Measurement methods for the RF requirements –Measurements for protocols –Approval criteria –Reporting practices –environmental tests Editor –Awaiting confirmation from candidate

S4.12 Base station conformance testing (TDD) Scope –Measurement methods for the RF requirements –Measurements for protocols –Approval criteria –Reporting practices –environmental tests Editor –Awaiting confirmation from candidate

S4.13 Basestation EMC Scope –This document defines EMC conformance requirements for the basestation necessary to meet relevant EMC regulations Editor

R4.01 RF System scenarios Scope –During the UTRA standards development, the physical layer parameters will be decided using system scenarios, together with implementation issues, reflecting the environments that UTRA will be designed to operate in. Editor –Awaiting confirmation from candidate

Meeting Schedule RAN WG 4, Feb 99, Turin RAN March 99, Dallas RAN WG 4, March, host required (Japan)