Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.

Slides:



Advertisements
Similar presentations
Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #4 Top Ten Stormwater Ordinance Modifications February 4, 2009.
Key Requirements of the Construction General Permit
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
NPDES Boatyard Permit and Stormwater BMPs Kurt Baumgarten, Gary Bailey and Greg Stegman November 10, 2011.
Future of the Construction and Post Construction Water Quality Program
What is NPDES? “National Pollutant Discharge Elimination System”
Stormwater 101: How to stay out of trouble with TDEC.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
BEING READY FOR AN INSPECTION No matter when the inspector shows up.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
NPDES Compliance. NPDES Water Quality Issues for the Precast Concrete Industry.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Module 7: Construction Phase
Construction and State Storm Water Permits What does it all mean? February 5, 2015Casper Workshop1.
Expedited Settlement Offer Worksheet Deficiencies Form
Introduction to Construction General Permit Inspections.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Welcome to training on Best Management Practices for Erosion and Sediment Control.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
Introduction to MS4 Stormwater Requirements (2009)
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Stormwater Control & Design
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
San Rafael, California November 12, 2015
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
Bud Amorfini – R6SLT Paul Keiran – R1 Compliance Inspection Reports and Data Reporting Course Overview Introduction and Inspector Qualifications Pre-Inspection.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
2012 Industrial Stormwater General Permit Modification Presented by: Jeff Killelea Department of Ecology Moderated.
Pollution Control: For Field Office Construction Sites.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Ohio Department of Transportation
Iowa Certified Construction Site Pollution Prevention Inspector
TPDES Construction Management at the City of Laredo
EPA Public Meeting Dallas, Texas May 10, 2005
John Tinger U.S. EPA Region IX
Stormwater Pollution Prevention Plans
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology

S1. Permit Coverage  Permit required for 1+ Acre Construction Activity –Clearing, Grading, Excavation –Not required for routine maintenance  Permit does not cover –Federal/Tribal projects –Post-Construction Stormwater –Non-point silvicultural activity

S2. Application  Application Form (Notice of Intent) –SEPA –Public Notice –30 day Public Comment period  Erosivity Waiver

S3. Compliance with Standards  Discharges must not violate Water Quality Standards –Surface Water –Ground Water –Sediment

S3. Compliance with Standards Turbidity pH Phosphorus

S4. Monitoring  2 Basic Components: –Site Inspections –Discharge Sampling  Turbidity/Transparency  pH

S4. Monitoring  Site Inspections –Who? Certified inspector –What? Disturbed areas, BMPs, outfalls –When? Weekly and after storms  Site Log Book –Inspection checklists/reports –Document BMP maintenance –Document monitoring

S4. Monitoring  Sampling: Turbidity/Transparency –Weekly (If Discharging)  Less than 5 acres  Turbidity Meter or Transparency Tube  Deferred until Oct 1, 2008  5 acres or More  Turbidity Meter  Deferred until Oct 1, 2006

S4. Monitoring Transparency Tube $34 Turbidity Meter $800

S4. Monitoring  Sampling: Turbidity/Transparency  Turbidity Benchmark = 25 NTU  Transparency Benchmark = 31 cm  If Discharge Exceeds Benchmark: Actions Required to Prevent Pollution  Adaptive management

S4. Monitoring  If 25 NTU Benchmark Exceeded:  Review SWPPP and make appropriate revisions within 7 days  Implement and maintain appropriate source control and/or treatment BMPs within 10 days  Document actions in the site log book.

S4. Monitoring  If Benchmark [REALLY] Exceeded (Turbidity 250+ NTU): (Turbidity 250+ NTU):  Same steps as 25+ NTU, AND  Call Ecology within 24 hrs  Continue to sample daily until discharge is below 25 NTU or meets WQ Standards (or stops)

S4. Monitoring  Sampling: pH  Significant Concrete (1000 yds 3 )  Engineered Soils  Cement Kiln Dust (CKD)  Portland Cement Treated Base (CTB)  Fly Ash

S4. Monitoring  Sampling: pH  If pH over 8.5:  Prevent discharge  Implement treatment (neutralize pH)

S5. Reporting & Recordkeeping  Discharge Monitoring Reports –Monthly (beginning in Nov 06 or 08) –Mail or Electronic Submittal  Phone Reporting –If Turbidity is 250 NTU or greater –If Transparency is 6 cm or less

S5. Reporting & Recordkeeping  Ecology Access to Stormwater Plans –Maintained on-site –Made available upon request –14 days of written request  Public Access to Stormwater Plans –14 days of written request –May provide to Ecology for public review

S8. Impaired Waterbodies  Limits for polluted waterbodies –Impaired Waters on 303(d) list –Water Clean Up Plans (TMDLs)  Turbidity  Fine Sediment  High pH  Phosphorus

S8. Impaired Waterbodies  Monitoring/Discharge Requirements  Turbidity/Fine Sediment Impairment  Monitor turbidity  Phosphorus Impairment  Monitor turbidity  High pH Impairment  Monitor pH

S9. Stormwater Pollution Prevention Plan  General SWPPP Requirements –Narrative –Map  BMPs selected from Ecology’s Stormwater Manuals or Equivalent

S9. Stormwater Pollution Prevention Plan  SWPPP Contents Specified –12 elements of SWPPP  SWPPP Modification –If inspections show SWPPP is ineffective: additional or modified BMPs

S10. Notice of Termination  Site Eligible: –All construction stormwater discharges eliminated –All Temporary BMPs removed –Site has undergone final stabilization

Appeal Timelines  General Permit: Within 30 days of issuance or receipt  Individual Site Coverage: Within 30 days of effective date.

QUESTIONS? Jeff Killelea Department of Ecology