ASSESMENT Of TRANSITION From ‘QUALITY In a PROJECT ENVIRONMENT’- COMPONENT Of PRINCE 2 To ‘PROCESS & PODUCT QUALITY ASSURANCE’- PROCESS AREA Of CMMI 1.1.

Slides:



Advertisements
Similar presentations
Kai H. Chang COMP 6710 Course NotesSlide CMMI-1 Auburn University Computer Science and Software Engineering Capability Maturity Model Integration - CMMI.
Advertisements

How ISO9001 Compares with CMM Mark C. Paulk JAN,1995 CMM version 1.1 ISO9001 July 1994 presented by Zhilan Zhou.
Pittsburgh, PA CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This.
Lero© 2010 Software Process & Quality Improvement Dr. Ita Richardson Lero – the Irish Software Engineering Research Centre and Department of Computer Science.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
Organizational Project Management Maturity Organizational Project Management Maturity Model (OPM3) PMI-MN Breakfast sessions Process Management.
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
Planning a measurement program What is a metrics plan? A metrics plan must describe the who, what, where, when, how, and why of metrics. It begins with.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
SE 470 Software Development Processes James Nowotarski 12 May 2003.
SE 450 Software Processes & Product Metrics 1 Quality Systems Frameworks.
Capability Maturity Model (CMM) in SW design
CMMI Overview Quality Frameworks.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Organizational Project Management Maturity: Roadmap to Success
How can projects be controlled?
Capability Maturity Model Integration (CMMI) COMP Group Assignment #1 Ario Nejad, Davit Stepanyan, Ian Jackman, Sebastian Henneberg, Wan Chi Chio.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 28 Slide 1 Process Improvement 2.
Project Management Methodology More about Quality Control.
Chapter : Software Process
CMMI Course Summary CMMI course Module 9..
Type author names here © Oxford University Press, All rights reserved. Operations Management Chapter 11 Planning for Projects, Crises and Business.
Integrated Capability Maturity Model (CMMI)
Chapter 2 Introduction to Requirements Management
Capability Maturity Model. Reflection Have you ever been a part of, or observed, a “difficult” software development effort? How did the difficulty surface?
Comparing CMMI® and OPM3®
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
Introduction to Software Engineering LECTURE 2 By Umm-e-Laila 1Compiled by: Umm-e-Laila.
Chapter 2 Process: A Generic View
Module 4: Systems Development Chapter 12: (IS) Project Management.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
IIL’s International Project Management Day, 2007 The Power of the Profession: A Lesson Learned and Solution Implemented Becomes a Best Practice in Project.
University of Sunderland CIFM03Lecture 2 1 Quality Management of IT CIFM03 Lecture 2.
Quality Concepts within CMM and PMI G.C.Reddy
Lecture Topics covered CMMI- - Continuous model -Staged model PROCESS PATTERNS- -Generic Process pattern elements.
1 ISO 9001:2000 ISO 9001 is the creation of the International Organisation for Standardisation (ISO), a Swiss-based federation of national standards bodies.ISO.
Application of the CMMI SM to Plan and Control Life Cycle Costs Dr. Mary Anne Herndon Science Applications International Corporation (SAIC) November, 2003.
SEI CMM Robert Johnson Bobby Kolski Rafi Seddiqi Kumeel Alsmail.
SWEN 5130 Requirements Engineering 1 Dr Jim Helm SWEN 5130 Requirements Engineering Requirements Management Under the CMM.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
CSE4002CMMI Capability Maturity Model Integration (CMMI) CMMI is replacing the well established CMM rating for software developers and systems engineers.
Process: A Generic View
CMMI FRAMEWORK SRIKANTH DEVINENI. Process failure is recognised when Project is delivered late Too much redundancy Customer complaints after delivery.
COBIT®. COBIT® - Control Objectives for Information and related Technology. C OBI T was initially created by the Information Systems Audit & Control Foundation.
MITM743 Advanced Project Management
1 SEI Capability Maturity Model Advanced Software Engineering COM360 University of Sunderland © 2000.
Risk Community of Practice (CoP) Status from Defense Acquisition University (DAU) Project Risk Symposium 2004 May 04 By: John Driessnack
SOFTWARE PROCESS IMPROVEMENT
CMMI. Reference CMMI: Guidelines For Process Integration And Product Improvement by Mary Beth Chrissis, Mike Konrad, Sandy Schrum ISBN Copyright.
Middle East Community of Practice Dubai, 19 th January 2009 Project Management, Programme Management, Portfolio Management Corporate Governance to Project.
UNIT 5.
CMMI Overview Quality Frameworks. Slide 2 of 146 Outline Introduction High level overview of CMMI Questions and comments.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
© 2004 Tangram Hi-Tech Solutions Project Management According to the CMMI1 Project Management according to the Capability Maturity Model (CMMI)
Tanner James… Enhancing your programme and project management capability P3 Management – Directions in Government for 2011 John Howarth Managing Director,
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
By Oliver Arnold. WHAT IS A PROJECT? WHAT IS PROJECT MANAGEMENT?  Projects are anything which involve change.  Projects have a beginning and an end.
Enterprise Solution Services Assessing the IT environment Oversaw 2014 Texas Legacy System Study report (HB 2738, 83R) Identified 4,130 business applications.
Summer – Fall 2006 Internship Nick DiBuono Intern Presentation.
1 Integration of Process Initiatives And Assessments Common Process Framework Integration of Management System Standards and Initiatives (QMS/CMMI/Lean/PMBP)
Lecture 20 Revision class.
Compliance and Audit Block 17 Block 17.
CMMI Overview Quality Frameworks.
Introduction to Software Engineering: Second Edition
د. حنان الداقيز خريف /28/2016 Software Quality Assurance ضمان جودة البرمجيات ITSE421 5 – The components of the SQA.
CMMI Overview.
Lockheed Martin Canada’s SMB Mentoring Program
U.S. Small Business Enterprise Certificate P
‘Delivering better value from professional services’
Presentation transcript:

ASSESMENT Of TRANSITION From ‘QUALITY In a PROJECT ENVIRONMENT’- COMPONENT Of PRINCE 2 To ‘PROCESS & PODUCT QUALITY ASSURANCE’- PROCESS AREA Of CMMI 1.1 Ahmad Luqman

2 Presentation Layout Introduction (PRINCE, CMMI) Literature Review Mapping Conclusion Future Enhancement(s) References & Bibliography Q & A

3 Objective Develop an assessment of transformation from OGC- PRINCE 2 to SEI-CMMI 1.1

4 PRINCE PRoject IN Controlled Environment [1] Developed by Central Computer and Telecommunications Agency (CCTA) in 1989 United Kingdom Government’s de facto standard for IT Project Management PRINCE 2 launched in 1990 Now operated by the Office of Government Commerce (OGC), England

5 PRINCE ® 2

6 CMMI Capability Maturity Model Integration [2] An integrated framework for maturity models and associated products that integrate the two key disciplines that are inseparable in a systems development activity; software engineering and systems engineering Developed in Aug 2001, by SEI, CMU, Pittsburgh Pennsylvania USA. SEI is being financed by DoD

7 CMMI ® 1.1 Structure

8 Literature Review How ISO 9001 Compares with the CMM; Marck C. Paulk, SEI, CMU; /94/$04.00 © 1994 IEEE; Jan 1995 [3]. –The main difference between these two: is the explicit emphasis of the CMM on continuous process improvement. ISO 9001 addresses only the minimum criteria for an acceptable quality system

9 Literature Review (Cont…) The Frameworks Quagmire; Sheard, Sarah; Crosstalk, Volume 10, No. 9; Sept 1997 [5]. –Many companies have begun documenting processes in response to ISO 9000 in 1994 on of the various capability maturity models, or perhaps to other standards

10 Literature Review (Cont…) Project management & business development Integrating strategy, structure, processes and projects; AP Van Der Merwe; 5 th International Symposium of PM YUPMA 2001; Yugoslavia; 28 to 30 May 2001 [6]. –Project close out is not normally seen as part of the project, neither is commercial operation

11 Literature Review (Cont…) Capability Maturity Model Integration 1.1 Continuous Representation; SEI, CMU; CMU/SEI-2002-TR-028 ESC-TR Aug 2002 [7]. –The continuous representation uses capability levels to measure process improvement

12 Literature Review (Cont…) Managing Successful Projects with PRINCE 2; Bob Assirati, The Stationery Office, OGC, London, UK; 2004 [8]. –There are certain aspects of Project Management that are well covered by existing and proven methods and are therefore excluded from PRINCE 2. Examples of these aspects are: People management techniques, Generic planning techniques

13 Problem Definition PRINCE 2 is not intended to cover all aspects relevant to Project Management & Product Development, e.g. –People management techniques such as motivation, delegation and team leadership –Generic planning techniques such as Gantt Chart and Critical Path Analysis –The creation of corporate Quality management & Quality assurance mechanisms –Contract and procurement issues –Allocation of risk ownership This is the job of other methods, although PRINCE must interface with them to enable information on such areas  Organizations concerned with PRINCE 2 certification often question its overlap with the CMMI. As such; there was no transformation mechanism available between these concerned standards in the contemporary market

14 Solution OGC PRINCE 2 Processes map to most appropriate different Practices of SEI CMMI 1.1 analysis provides answer to some common questions about the mapping of these standards

15 Work Performed Research is primarily based upon two features; –Leading Case Studies across the world –Incorporation of real time data through questionnaires Case Studies are; 1.PRINCE2 Case study (with CMM), Ericsson Services Ireland, Oct PRINCE2 Case study, Registers of Scotland Executive Agency, Sept PRINCE2 Case study, Enterprise Risk Management, Fleet Information Management Unit, UK, Oct PRINCE2 Case study, Electricity Supply Board Ireland, April PRINCE2 Case study, PRINCE2 & PMI/PMBoK, A combined Approach at Getronics, The APM Group Limited, Buckinghamshire, UK, PRINCE2 Case Study, National Health Service, Bucks, UK, July CMMI Case Study, United Space Alliance (Boeing Company / Lockheed Martin Corporation), NASA, LLC, Australian Experiences with CMMI, Terry Rout, David Marshall, Angela Tuffley & Adrian Pitman, Software Quality Institute, Griffith University, Australian Defense Material Organization, Australia

16 Mapping Approach Divide the Standard to the lowest level Compare the Typical Artifact & Work Product Based upon Case studies & Questionnaire, assign weights i.e. Strong, Medium and Weak to one-to-one mapping

17 PRINCE 2 ® Breakup

18 CMMI 1.1 ® Breakup

19 Achievement Map serve as an indicator of correspondence between the PRINCE 2 to CMMI 1.1, rather than as an implementation guideline

20 Conclusion

21 Future Research  Risk Management (RM) component of PRINCE 2 can be mapped to RM of in CMMI 1.1

22 References & Bibliography 1. Managing Successful Projects with PRINCE 2; Bob Assirati, OGC- London-UK; CMMI Guidelines for Process Integration & Product Improvement; Mary Beth Chrissis, Mike Konarad, Sandy Shrum; ISBN ; SEI-CMU-USA; How ISO 9001 Compares with the CMM; Marck C. Paulk, SEI, CMU; /94/$04.00 © 1994 IEEE; Jan SEI & Enterprise Process Improvement Collaboration, Systems Engineering Capability Assessment Model An IPD CMM; International Council on Systems Engineering vol 1, v0.9. CMU; 28 Oct The Frameworks Quagmire; Sheard, Sarah; Crosstalk, Volume 10, No. 9; Sept 1997

23 References & Bibliography (Cont…) 6. Project management & business development Integrating strategy, structure, processes and projects; AP Van Der Merwe; 5 th International Symposium of PM YUPMA 2001; Yugoslavia; 28 to 30 May Capability Maturity Model Integration 1.1 Continuous Representation; SEI, CMU; CMU/SEI-2002-TR-028 ESC-TR Aug Managing Successful Projects with PRINCE 2; Bob Assirati, The Stationery Office, OGC, London, UK; 2004

Q & AQ & A Ahmad Luqman