#3224 Sat 17 th November Restored an “AP” set-up with some measurement of Twiss. – The idea was to take some BPM data with a known twiss set-up to see.

Slides:



Advertisements
Similar presentations
1 Collimation Simulations and Optimisation Frank Jackson ASTeC, Daresbury Laboratory.
Advertisements

Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
AR1 BPM Calibration (for new electronics) Before any TOA measurements we attempted to look at the BPM calibration (AR2-BPM-03) Turn off quads (Q1,Q2) and.
Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
PS wirescanner calibration Student Meeting 10/03/2014 Carolina Bianchini BE-BI-BL.
#3271 Sat 08-Dec-12. R56 Injector – BC2 GS calibration First calibrate BC2 1. Start with beam in centre of screen INJ-5. Read INJ-DIP-01 current and convert.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
UNRELIABLE DATA, SEE FIRST SLIDE WARNING!!! Data taken on these shifts had attenuation factors set incorrectly and problems with faraday cup bunch charge.
Time Of Arrival/R56 measurements Period 13. Background Dave Newton’s Parameter scans \\Dlfiles03\alice\Simulations\R56 AR1 (parameter scan).pdf Deepa’s.
ALICE Commissioning Part II : Injector Yuri Saveliev Seminar on 14-15/07/2008 Gun to Booster Booster to FCUP-01 The rest of the Injector.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
#Injector Twiss Measurement #3212 Sat 10 th November.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
U. IrisoECLOUD’04 – 21 April ECLOUD’04 April , Napa, CA Use of Maps for exploration of Electron Cloud parameter space Ubaldo Iriso and.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
3281, 13 th December 2012 Combined fast-MCT, AR2-BPM-01, and TOA measurements. All data at \\srofs1\PSD\Alice\Work Temp\2012\12\13\Shift 3 Different parameter.
3243 Fri 23 Nov Summary INJ-BPM-01: took 1 shot of data, just a reference to compare with previous recent shifts – Did not see a strong dominant 100 kHz.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
CLIC CTF3: Phase Feed Forward Comparing the effect of the phase feed forward system on beam phase stability with various theoretical predictions. CLIC.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
BPMs period General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.
Beam Dynamics Meeting Bolko Beutner, DESY Summary of new FLASH CSR studies Bolko Beutner, DESY Beam Dynamics Meeting
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
March-May 2012 AP Projects 1.Beam substructure. 2.Bunch length/energy spread in pre- compressed bunch using RF techniques with 325 kV gun voltage 3.TOA.
SLAC SD0/QD0 Cryomodule Jitter Tolerance Glen White SLAC March 27 th 2007.
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
, Dan Peterson Apparent inconsistencies and other issues in the xBSM measurements of IBS Scans We have studied the pinhole and CodedAperture.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Optics studies for the LHC beam in the TT2-TT10 line and effect of the QKE58 suppression E.Benedetto, A.Franchi Thanks: G.Arduini, D.Jacquet, O.Berrig,
LCLS Energy Jitter Status in 2012 Franz-Josef Decker 24-Oct-2012 thanks to: J. Turner, R. Akre, J. Craft, A. Krasnykh, M. Nguyen, W. Colocho, … for helping.
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
Beam-Beam simulation and experiments in RHIC By Vahid Ranjbar and Tanaji Sen FNAL.
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
Beam-Based Calibration Screen calibration. Two screens with BPM in between. Scan beam position with upstream dipole/corrector. Absolute calibration. One.
1 Bunch length measurement with the luminous region Z distribution : evolution since 03/04 B. VIAUD, C. O’Grady B. VIAUD, C. O’Grady Origin of the discrepancies.
11/18/2004 FNAL Advanced Optics Measurements at Tevatron Vadim Sajaev ANL V. Lebedev, V. Nagaslaev, A. Valishev FNAL.
A Possible Source of the Tune Drift on the Front Porch in the Tevatron.
Wakefield effect in ATF2 Kiyoshi Kubo
Emittance Growth in the SPPS Chicane P. Emma, P. Krejcik, C. O’Connell, M. Woodley; SLAC, H. Schlarb, F. Stulle; DESY.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
SABER Longitudinal Tracking Studies P. Emma, K. Bane Mar. 1, 2006
Measurements and analysis of beam parameters at post-IP wire-scanner
Further Tracking Studies and March Trip Plan
Emittance Dilution and Preservation in the ILC RTML
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Low Emittance Tuning Tests at the Diamond Light Source (Rutherford Labs) Dec R. Bartolini, S. Liuzzo, P. Raimondi SuperB XV Meeting Caltech, CA,
Progress on the ILC-BDS (250GeV CoM)
DFS Simulations on ILC bunch compressor
Adaptive Alignment & Ground Motion
ATF2 Recent Wakefield (Beam size Intensity dependence) Studies
Beam Optics Set-Up at SLAC End Station A
Yuhui Li How to edit the title slide
Relaxing Quads Roll Alignment tolerance
Progress activities in short bunch compressors
Time-Resolved Images of Coherent Synchrotron Radiation Effects
High Level Physics Applications for LCLS Commissioning
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
COMB beam: TSTEP simulations up to THz station
Linac Diagnostics Commissioning Experience
Sawtooth effect in CEPC APDR
Presentation transcript:

#3224 Sat 17 th November Restored an “AP” set-up with some measurement of Twiss. – The idea was to take some BPM data with a known twiss set-up to see how the bunch-to- bunch position variation correlates with the Twiss. Took BPM data in AR1. Scanned AR1-Q1/4 to close dispersion Scanned AR1-Q1/4 to make isochronous.

#3224 Twiss AP set up from #3139 See \\Dlfiles03\alice\Analysis\Period 14 data\AP_period13and14\transversemodel\31 39\\Dlfiles03\alice\Analysis\Period 14 data\AP_period13and14\transversemodel\31 39 Repeated the same scans to compare Twiss repeatability. ST1-Q1 scan Q2 = 0.6 A Q3/4 = 0 A ST1-Q2 scan (0-1.4A) with Q1 = 0.40A.

ST1-Q1 scan Q2 = 0.6 A Q3/4 = 0 A, beamsize measured on ST1-4 Yuri original meas’t on #3139 #3224. Position of minimum looks similar but curve much shallower My analysis of #3139

ST1-Q2 scan (0-1.4A) with Q1 = 0.40A. beamsize measured on ST1-4 No plot available from Yuri’s file My analysis of #3139 My analysis of #3224

Twiss Calculation γ.εx (μm) αx(m)βx (m)γ.εy (μm) αy(m)βy(m) #3149 YMS evaluation #3149 My evaluation Not done #3224 My Evaluation Not done Uses parabolic fit to σ^2 vs k.l Constrain parabola vertical offset to smallest beamsize measurement

Twiss Conclusions NB: I didn’t go to divisor 20 like Yuri did. But I would expect the result (if any) of this would be to make my beamsizes on #3224 larger due to increased beam loading. However, my beamsizes are smaller. I set up phases “accurately” to match # pC; BC=-10/+15deg; Lc = crests. Pb=1.2kW. Comparison of the quad scan data suggests optics are not highly repeatable. Two months gap between measurements being compared. Maybe this is too long a gap.

Model vs Measure #3224 ST1-3 AR2-1 ST2-1 ST2-2 Model/measure agreement not too bad

Bunch intra-train variation/jitter compared with β function x-plane AR1-BPM-01 AR1-BPM-03 AR1-BPM-04AR1-BPM-06 Plot sqrt(β) (~ beamsize) vs rms x position with the train, for each BPM trace. The β at each BPM comes from model on previous slide. There does seem to be strong correlation, perhaps expected. AR1-BPM-06 AR1-BPM-01 AR1-BPM-03 AR1-BPM-04

AR1 STUDIES After Twiss evaluation, restore the #3139 “AP” set up and study dispersion and R56 of AR1

AR1 Dispersion Measured on AR1- BPM-06 Each plot is BPM x position vs beam energy Vary AR1-Q1/4 from 1.9 to 2.4 in 8 steps Dispersion (mm) vs AR1-Q1/4 current

AR1 R56 measured on AR1-BPM-06 Each plot is BPM relative path length vs beam energy Vary AR1-Q1/4 from 1.9 to 2.4 in 8 steps R56 (mm) vs AR1-Q1/4 current AR1-Q1/4 current

Summary R16 R56 Isochronous + zero dispersion condition at AR1-Q1/4 = 2.18 A AR1-Q1/4 current