Targeting First Gold Dore Q1 2014

Slides:



Advertisements
Similar presentations
Targeting First Gold Dore Q1 2014
Advertisements

LONE STAR TECHNOLOGIES, INC. Investor Presentation 2004.
Gold Rock May 2013 Drill-Ready Gold Property Adjacent to Manitou Gold.
Photo Book: The Deer Trail Mine Story Piute County Utah Q
Murray River Project Update Coal Forum October 2013.
Mining in Latin America Ralph Lutes, Vice President, Asia, Executive Director & General Manager, Teck China October 22, 2014.
Royalties for Regions – Information Briefing 10 October 2014 Presenter:David Horton Chief Operating Officer.
HYCROFT RESOURCES & DEVELOPMENT INC. Allied Nevada Gold Corp.
May 13, TSX-V:OCO, Frankfurt:OR6, US OTC: ORRCF.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
DAUGHERTY RESOURCES, INC. IPAA Oil & Gas Investment Symposium New York April (Nasdaq: NGAS)
Brendan Flood Executive Chairman The World Leaders in Recruitment Conference London – September 24 th 2014.
district development Tanzania – Lake Victoria Greenstone Belt.
June 29, 2007 Research Capital Presentation Alex Pannu Iain Brown Jim Simpson John Braden DISCOVERY-CORP ENTERPRISES INC.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
© 2014 Focused on a World Class Discovery. © 2014 Forward Looking Information This presentation contains forward-looking statements, which represent the.
1 Mineral Enterprise Corporation Investor Presentation MINENCO.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
4.7 Billion Rand Investment In South Africa Driefontein 9 Sub-vertical Shaft Depth Extension and Kloof Extension Area Decline Shaft System 7 September.
TSX: SGR OTCQX: SGRCF 1 SAN GOLD CORPORATION CORPORATE PRESENTATION TSX: SGR OTCQX: SGRCF JUNE 2013.
PACIFIC PARADYM ENERGY INC. Investor Presentation / March 2012 TSX-PPE.
Supplemental Analyst Package First Quarter 2008 Earnings Call April 30, 2008.
NEVADO RESOURCES CORPORATION (TSX-V:VDO) Strategic Metals in Northern Quebec August 2013.
Red Rock Energy Inc. (TSX-V: RRK) May 9, This presentation may contain forward-looking information including expectations of future production,
PUBLIC PRIVATE PARTNERSHIPS (Alternate Financing and Procurement-Ontario) LARRY J. McCABE, CHIEF ADMINISTRATIVE OFFICER.
Investor Presentation
W E L C O M E to the SB 1022 Real Estate Due Diligence Training SB 1022 Real Estate Due Diligence Training.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
Silver Shield Resources Corp. A MEXICO PRECIOUS METALS DEVELOPER TSX Venture: SSR.
FLOW-THROUGH FINANCING Q Safe Harbour Statement Safe Harbour Statement This presentation contains certain forward looking statements, which are.
Doing Business in Central Asia – Kyrgyz Republic and Mongolia John Pearson, Vice President Investor Relations.
Todd Creek (25% Interest) May 2013 An Advanced Exploration Project in B.C.’s Golden Triangle.
Municipal Tax Increment Financing
Align Corporation Building success for our clients. Align™ Strategic Analysis Process Align™ Strategic Analysis Process.
TSX-V: OCO Frankfurt: OR6
Corriente Resources Inc. Copper Growth Story Corriente Resources Inc. Copper Growth Story November 2006.
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
Commodity Hedging Overview May 10, 2012 The following information is current as of May 10, Memorial Production Partners LP (MEMP) intends to provide.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
Natural Resource Partners L.P. Platts Coal Properties Conference February 2007.
Presentation to MineAfrica’s Investing In Africa Seminar March 4, 2008 By Don Willoughby, VP Corporate Development All financial.
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
Ramping-up to Full Capacity Investor Presentation February 2009.
SMALL BUSINESS MANAGEMENT
Corporate Governance at CDS Ian A. Gilhooley President and CEO.
100% ownership (subject to gov’t 10% carried interest) in 2 contiguous prospecting licenses covering 161 sq km on the Ashanti Shear. Right to acquire.
October 2009 Enerchem International Inc.
2 2 Cautionary Statement This presentation contains “forward-looking information” which may include, but is not limited to, statements with respect to.
Symbol: DCY Exchange: TSX-V Current Price $ week Hi-Low $0.37-$0.07 Total Shares Outstanding 27,237,962 Fully Diluted 32,457,962 Market Capitalization.
PEMBINA FINANCING AND DEVELOPMENT June Page 1 The following information contains forward-looking statements and graph detail. The information is.
Wachovia Capital Markets Seventh Annual Pipeline and MLP Conference New York, NY December 9, 2008.
Acquisition of NetBenefit (UK) Limited Analyst Conference Call June 6, 2012.
Investor Presentation November Forward Looking Statements This presentation may contain forward-looking statements which are subject to a number.
Sian Gold Project – Ghana BRIEF SUMMARY June 2009.
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
Balderson 7e Copyright © 2008 by McGraw-Hill Ryerson. All rights reserved. Part 2: Preparing for Small Business Ownership Chapter 4 The Business Plan.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Copper Bay Limited Presentation March Copper Bay Limited – Investor Presentation – March Overview  A Chilean-focused resources company 
THIRD QUARTER 2012 RESULTS.  Year-over-year revenue growth of 5.5% to $32.0 million, at the high end range of guidance  Adjusted fully diluted EPS of.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
Planet Microcap Showcase Chuck Cronin, VP Carbon Solutions
First Quarter 2014 Earnings Review
Developing a Canadian Gold Deposit
We are eager to assist your business
EV Battery Metals Nickel Copper Cobalt Lithium
Graham Chisholm –President & CEO
Gleichen Resources TSXV: GRL October 7th, 2009.
EL SOL PROJECT Technical Data June 25, 2019 TSX VENTURE: MMN.
TSX: OPC May 13, 2009.
Bidjovagge Mine Project
Presentation transcript:

Targeting First Gold Dore Q1 2014 DUFFERIN GOLD MINE Targeting First Gold Dore Q1 2014 Presented by: Alain Hupé – President & CEO Douglas keating – Mine Manager Nova Scotia, CANADA OU3 (FWB) / APP (TSX.V)

Forward-Looking Statements This presentation may contain certain forward-looking statements regarding (i) estimated resources and reserves, (ii) planned production and operating costs profiles, (iii) planned capital requirements and (iv) plans, strategies and corporate objectives. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Ressources Appalaches and Dufferin Resources. The forward-looking statements are inherently uncertain and may therefore differ materially from results ultimately achieved. External and other factors may impact the Company and affect the forward-looking statements in this release since its preparation. Subject to applicable law and stock exchange listing rules, the Company does not intend to publicly update any of the forward-looking statements or any assumptions on which any such forward-looking statement is made. OU3 (FWB) / APP (TSX.V)

Become the next Nova Scotian gold producer Extend resources Corporate Objectives Become the next Nova Scotian gold producer Extend resources Increase production capacity Three phase plan : Phase #1 – Restart gold production at 300 TPD by Q1-2014. Phase #2 – Production of 20,000 to 25,000 oz of gold per year. Phase #3 – Explore the anticline structure towards the East and at depth to double production capacity in 2015 OU3 (FWB) / APP (TSX.V)

Corporate Profile Direction & Gestion Experience Company Description Alain Hupé, Eng. President, CEO & Cofounder 20 years in exploration Engineer-geologist, specialising in mining exploration geology, President of Gestion LesTrois Inc. Jean-Claude Morel, M.A.DEM Executive Vice-President & COO 25 years of management experience Development and managing of multi-disciplinary teams ranging from engineering to logistics, including administrative, legal, environmental and financial components. John A. Thomas, Eng Ph.D. Director 39 years in mining industry Experienced mining engineer from process development, engineering, Management, construction and operation of mines. Jose Oro, Ph.D. Director 35 years in mining industry Ph.D. in geology, held various Senior Vice-President and Chief Operating Officer position in the mining industry, as well as Director of the Ministry of Basic Industries André Proulx, M.A. Director & Cofounder 30 years in company management Experienced manager of mining and oil exploration companies, President and CEO of Pétrolia Inc. Dominique Doucet, Eng. Director 28 years in exploration Engineer-geologist and has held senior management positions with Dios Exploration Inc., Sirios Inc. and Kalkhos Inc. Company Description Listed FWB: 2013 Listed TSX.V: 1997 Shares Outstanding: 182,661,748 Market Cap 20 000 000 $ Year Hi/Low: 0,12 / 0,05 OU3 (FWB) / APP (TSX.V)

Dufferin Mine & Surrounding Appalaches Properties Miller Lake Dufferin East Dufferin North Chocolate Lake Dufferin Mine Ecum Secum Sheet Harbour 25 kilometers (km) radius Halifax 20 kilometres Dufferin Mine Canada OU3 (FWB) / APP (TSX.V)

Dufferin Mine Existing Infrastructures Existing mining infrastructure on site: Mining lease in good standing 300 tonnes per day plant Very short distance from mine to plant (150 m) Gravity and flotation process Tailings pound Acces by decline PORTAL AND DECLINE MILL MILLING OU3 (FWB) / APP (TSX.V)

Dufferin Mine Past and Existing Facilities Ball Mill Shaking Table Flotation System Infrasructure On-site OU3 (FWB) / APP (TSX.V)

Dufferin Mine Past Operations Quartz Vein – Saddle Quartz Vein – Saddle OU3 (FWB) / APP (TSX.V)

Dufferin Mine Past Operations – Type of Veins OU3 (FWB) / APP (TSX.V)

Potential continuity in depth and toward east Saddle Reef Vein Deposit Anticline Fold Nose Dufferin Mine Gold Quartz Vein 20-100 meters D 1.4 - 8.4 km Potential continuity in depth and toward east open structure OU3 (FWB) / APP (TSX.V)

Production and Exploration Dufferin Gold Mine Mining Lease no. 94-2 Ressources Appalaches owns claims covering anticline structure over 8.4 km long Area Drilled 1,400 meters Mined Zone 450 meters Deposit Open Towards East and at Depth Portal Gold Surface Sample Wide Quartz Veins Milling OU3 (FWB) / APP (TSX.V)

Drilling Campaigns 1999-2001 2008-2009 2010-2011 OU3 (FWB) / APP (TSX.V)

Dufferin Mine Plan Mine General Layout 700 m APP-TSX-V

Dufferin Mine Plan Mine Plan Potential Resources APP-TSX-V

Latest Goals Achieved Past 6 months Milestones Achieved Latest Goals Achieved Past 6 months Mid-2013: The following works have been completed since the announcement of the loan financing of US $10M (May 2013): Mine underground dewatering & rehabilitation works Refurbished the primary and secondary underground ventilation Completed plant rehabilitation and testing of all crushing circuit components Finalised and filed mine plan with provincial authorities & filed production permit (Industrial Approval) application Acquisition and delivery of heavy equipment Started the vetting of 688 applications for the remaining approximately 70 staffing positions required to resume mining operations OU3 (FWB) / APP (TSX.V)

Portal Flooded – Water Level May 17, 2013 APP-TSX-V

Portal Rehabilitation OU3 (FWB) / APP (TSX.V)

Infrastructures OU3 (FWB) / APP (TSX.V)

Mill Refurbishment OU3 (FWB) / APP (TSX.V)

Galleries Rehabilitation OU3 (FWB) / APP (TSX.V)

Targeting First Gold Dore Q1 2014 Milestones to Achieve Path to Production Targeting First Gold Dore Q1 2014 2013: Complete development works required to restart production at 300 t/d 2014: Start of mining & milling ramp-up operations resume gold production Q1 2014 post-2014: Reinvest profits to increase resources and upgrade plant capacity OU3 (FWB) / APP (TSX.V)

Questions DUFFERIN GOLD MINE Presented by: Alain Hupé – President & CEO Douglas Keating – Mine Manager OU3 (FWB) / APP (TSX.V) October, 2013