Heat Exchanger Network Retrofit

Slides:



Advertisements
Similar presentations
PRESENTERS NDENGA D.L,ASSOCIATED BATTERY MANUFACTURERS,NAIROBI AND KILONZI F.M,MOI UNIVERSITY,ELDORET. APPLICATION OF PINCH TECHNOLOGY IN MINIMISATION.
Advertisements

Design of the fast-pick area Based on Bartholdi & Hackman, Chpt. 7.
Tier III: Optimization Design Problems Derek McCormack Section 1: Sample Problems.
Jeff Jenneman James Phan Quang Nguyen Miguel Bagajewicz.
CARBERY MILK PRODUCTS BALLINEEN Co. Cork Energy Saving Programme Application of “Pinch” Technology.
Chapter 4 Mass and Energy Analysis of Control Volumes (Open Systems)
Chapter 9 S,S&L T&S Section 3.5 Terry Ring University of Utah
Truls Gundersen Ass.TopicSupervisedDeadline 1Sequence of Distillation Columns Minimum Energy Requirements and Pinch Design.
Miscellaneous CHEN 4470 – Process Design Practice Dr. Mario Richard Eden Department of Chemical Engineering Auburn University Lecture No. 17 – Equipment.
1 Single-cycle mixed-fluid LNG (PRICO) process Part I: Optimal design Sigurd Skogestad & Jørgen Bauck Jensen Quatar, January 2009.
Heat Exchanger Theory and Design
Heat and Power Integration CHEN 4460 – Process Synthesis, Simulation and Optimization Dr. Mario Richard Eden Department of Chemical Engineering Auburn.
EGR 334 Thermodynamics Chapter 4: Section 9-10
Chapter 3.1: Heat Exchanger Analysis Using LMTD method
© 2014 Carl Lund, all rights reserved A First Course on Kinetics and Reaction Engineering Class 22.
ISAT Module V: Industrial Systems
Heat Exchange Network Optimization by Thermal Pinch Analysis
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
CHAPTER II PROCESS DYNAMICS AND MATHEMATICAL MODELING
Heat Exchanger Effectiveness Maximum and Minimum Heat Capacity Rates Number of Transfer Units Maximum Temperature Difference.
ME421 Heat Exchanger and Steam Generator Design Lecture Notes 6 Double-Pipe Heat Exchangers.
Thermodynamics Chapter 15. Expectations After this chapter, students will:  Recognize and apply the four laws of thermodynamics  Understand what is.
University of Texas at AustinMichigan Technological University 1 Module 5: Process Integration of Heat and Mass Chapter 10 David R. Shonnard Department.
Chapter 6 Production. ©2005 Pearson Education, Inc. Chapter 62 Topics to be Discussed The Technology of Production Production with One Variable Input.
8 - Heat & Power Integration1 Heat Exchanger Network Synthesis, Part III Ref: Seider, Seader and Lewin (2004), Chapter 10.
Flow rates : Known Obtain : heat capacities (Cp) heat of vaporization/condensation Estimate : vapor loads in the column (design) Obtain heat loads of all.
Chapter 15 - Heat Exchange Networks
CHAPTER 5: Mass and Energy Analysis of Control Volumes
Heat Exchanger Network Design one aspect of process integration J. M. Shaw Instructor CHE 465 I would happily credit the authors who provided the example.
Pinch technology series
GAS TURBINE POWER PLANT
6 - Intro HEN Synthesis1 Heat Exchanger Network Synthesis Part I: Introduction Ref: Seider, Seader and Lewin (2004), Chapter 10.
Heat Integration Chapt. 10. Costs Heat Exchanger Purchase Cost – C P =K(Area) 0.6 Annual Cost –C A =i m [ΣC p,i + ΣC P,A,j ]+sF s +(cw)F cw i m =return.
© 2014 Carl Lund, all rights reserved A First Course on Kinetics and Reaction Engineering Class 29.
Part 6 Synthesis of Heat Exchanger Networks. 6.1 Sequential Synthesis Minimum Utility Cost.
Alex Gee Jon Locke Joe Cooper Kylie Rhoades Clara Echavarria Ice Energy Extraction.
A transportation problem.  Let c ik be cold stream i in interval k and h jl be hot stream j in the interval l.  Define a ik as the heat.
Area Target Section Stream Population j k Cold Streams Hot Streams H T QjQj enthalpy interval.
Heat Integration Chapter 9 S,S&L T&S Section 3.5 Terry Ring University of Utah.
Optimization & Fleshing Out the Design Optimizing for capital and/or operating costs More detailed look at specific equipment.
Pinch Technology. Pinch technology 개요 Pinch technology systematic methodology for energy saving in processes and total sites Energy target Cross pinch.
Process design and integration Timo Laukkanen. The main objectives of this course To learn how to use tools that can be used to design heat recovery systems.
CIBSE HCNW 28 August 2014 Modular boilers. Traditional or low-tech replacement boiler installation; Multiple boilers eg 2 no 66% of load for security.
Lecture 5 Multiobjective optimization GAMS-Nimbus integration SUMMARY Timo Laukkanen.
Pinch Technology and optimization of the use of utilities – part two Maurizio Fermeglia
LECTURE DAY 2 Timo Laukkanen. What was important in Lecture 1 Process Integration/Heat Exchanger Network Synthesis (HENS) is an important step in process.
1 Chapter 5 Mass and Energy Analysis of Control Volumes.
Pinch Technology and optimization of the use of utilities – part two
Chapter 6 Production.
BRAYTON CYCLE AND EFFECT OF INTERCOOLING , REHEAT AND REGENRATION
Synthesis of Heat Exchanger Networks
LECTURE DAY 3 Timo Laukkanen.
HEAT EXCHANGER.
Process design and integration
Euler’s network theorem
Multiobjective optimization GAMS-Nimbus integration SUMMARY
Pinch Technology and optimization of the use of utilities – part one
Chapter 5 The First Law of Thermodynamics for Opened Systems
Process design, process integration and energy system optimization
Sieder, Chapter 11 Terry Ring University of Utah
CH EN 5253 – Process Design II
Pinch Technology and optimization of the use of utilities – part one
Heat Exchange Networks
LECTURE DAY 2 Timo Laukkanen.
Synthesis of Heat Exchanger Networks
Tier III: Optimization Design Problems
Hierarchy of Decisions
Synthesis of Heat Exchanger Networks
CH EN 5253 – Process Design II
Miscellaneous CHEN 4470 – Process Design Practice
Presentation transcript:

Heat Exchanger Network Retrofit Trevor Hallberg Sarah Scribner

Heat Exchanger Network (HEN) Retrofit Outline Mixed Integer Linear Programming (MILP) Pinch Technology Theory for Retrofit Improvements on Pinch Technology Crude Distillation Unit Example Discussion

Heat Exchanger Network (HEN) Retrofit Small Conceptual Example H1 C1 C2 1 5 4 HU CU 170°C 200°C 10 kW/°C 9 kW/°C 11 kW/°C 200˚C 30˚C 25˚C 2 3 55 kW 1000 kW 925 kW 420 kW 1110 kW 109.1˚C 76.7˚C 128˚C 35.5˚C Retrofit Options : Adjust existing area Relocate existing exchangers Add new exchangers Introduce stream splits Optimal Results : Reduce utility usage Increase process-process exchange Maintain network integrity

Mixed Integer Linear Programming (MILP) Based on transportation-transshipment model Hot stream, i Cold stream, j 3 4 5 6 7 8 Heat transfer Zones Temperature Intervals Energy and flow balances

Mixed Integer Linear Programming (MILP) Heat Transfer Zones Two Zones Pinch Technology (Above and Below the Pinch) One Zone Find minimum total cost, even if cross-pinch transfer occurs

MILP Sophisticated cost analysis Model parameters Area adjustment Existing heat exchangers New heat exchangers Re-piping Ability to tailor-fit model for a variety of HEN scenarios

Area Adjustments Area Reduction Area Addition Plug Tubes By-pass fluid Enforce realistic area adjustments Area reduction ≤ 50% Area Addition Existing Exchangers Increase area of existing shell Install a new, larger shell New Exchangers Limit number of new exchangers Limit area (size) of new exchangers Enforce realistic area adjustments Area addition ≤ 20%

Re-piping Re-piping scenarios Re-piping cost assignments Exchanger relocation Stream splitting Exchanger by-pass Re-piping cost assignments Model compares number of split streams in retrofitted network to original network Assigns user-defined fixed cost to number of new splits

MILP Objective Functions Maximize value of savings Value of Savings = Utility Cost Savings – Annual Capital Cost Maximize net present value NPV = ∑(DiscountFactori * Utility Cost Savingsi ) – Capital Cost Maximize return on investment ROI = Annual Utility Cost Savings / Capital Cost

MILP INPUT Parameters OUTPUT Data Stream data (F·Cp) Stream temperatures (Inlet & Target) Cost functions OUTPUT Data Optimized objective function Exchanger locations Cost requirements Utility savings

Pinch Technology The root of heat integration technology Systematic methodology for retrofitting Identifies locations where process change will reduce the overall energy consumption Allows us to set these energy targets Allows us to set total cost targets

Pinch Technology Based on thermodynamic principles Uses Temperature vs. Enthalpy diagrams Called composite curves HCC profiles the heat availability in the process CCC profiles the heat demands in the process combinations of straight line representations of the hot and cold streams based on the heat capacity flow rate (CP = FCp)

Pinch Technology Composite Curves - Combined Displays the process minimum approach temperature (ΔTmin) Displays maximum process-to-process heat recovery Displays minimum utility requirements Minimum hot utility = QH,MIN Minimum cold utility = QC,MIN

Pinch Technology The pinch (ΔTmin) Splits the process into 2 regions that are analyzed separately “Heat Sink” region above the pinch “Heat Source” region below the pinch Quantifies how close the composite curves can be without violating the second law of thermodynamics 2nd Law: no temperature crossover within any of the enthalpy intervals

Pinch Technology 3 Pinch Rules No heat transfer across the pinch No external cooling above the pinch (only HU) No external heating below the pinch (only CU) Violating these results in cross-pinch heat transfer Increases heat requirements

Pinch Technology Total Network Area - Aideal Q = U•Ainterval•ΔTLM “Vertical Heat Transfer”- vertical enthalpy regions Assumes equal area of each exchanger Vary ΔTmin Aideal = A1+A2+…+Ai Q = heat transferred U = overall heat transfer coefficient ΔTLM = log mean temperature difference of the enthalpy intervals A1 and A5 represent the areas of the utility exchangers These will change as our process utility requirements change Provides the minimum total

Pinch Technology Retrofitting Energy vs. Area diagram Blue curve = Aideal for various ΔTmin values Want to improve ineffective use of area Want to decrease energy requirements Optimum grassroots design curve assumes vertical heat transfer for the HEN Total network area is calculated using the vertical heat transfer method described earlier We have a few options for retrofitting from our existing design

Pinch Technology Retrofitting continued Why would we increase area and energy? Could theoretically work but the point is to use area better and decrease energy Pinch recommends not decreasing area in which we have already invested - ??? For now we will assume this is our retrofit path If we are going to increase area, why not try to decrease the energy at the same time? (blue) Do not want to decrease area because we have already invested in it (pink) Limitation but we will assume it is correct for now and will look into it more later (green)

Pinch Technology Need a way to compare energy and area Want a curve similar to the optimum design curve Need a way to determine the most economical solution on the new curve We use something called area efficiency Need a way to compare energy and area Which path do we choose?

Pinch Technology Area Efficiency (α) Based on utilities of current process Agrassroots = optimal area for current process Assume new design has αnew ≥ αcurrent The best α can be is 1 (cannot be better than ideal) Agrassroots is calculated using the vertical heat transfer method as described earlier for the current process The higher αcurrent, the closer Aexisting is to Agrassroots

Pinch Technology Area Efficiency Assume α = β and Aexisting Aretrofit Aideal Agrassroots Can now calculate Aretrofit based on constant curve Process: ΔTmin Qu,min Aideal Aretrofit

Pinch Technology Which α do we use? Infinite amount of α values At least want αcurrent The best is α = 1 Larger α = smaller Aretrfit Assume value of 1

Pinch Technology Now that we have Aretrofit? We need the optimum ΔTmin value Total Annualized Cost (TAC) vs. ΔTmin diagram for constant α Optimum ΔTmin value corresponds to the minimum

Pinch Technology TAC vs. ΔTmin Nmin = [Nh+Nc+Nu-1]AP + [Nh+Nc+Nu-1]BP Still assuming that the total area of the network is distributed evenly among the exchangers

Pinch Technology Now we need to design the HEN Eliminate cross-pinch heat exchangers (E2) Reuse the other exchangers (usually more economic) Design sections above and below pinch separately H1 C1 C2 5 4 HU CU 170°C 200°C 10 kW/°C 11 kW/°C 9kW/°C 200˚C 30˚C 25˚C 1 2 3 55 kW 1000 kW 925 kW 420 kW 1110 kW 109.1˚C 76.7˚C 128˚C 35.5˚C 40˚C Design is based on knowing the optimum ΔTmin value maximizing the heat load for each exchanger ensure the minimum number of units Designing above the pinch separately from below the pinch ensures no cross-pinch heat transfer Match one hot and one cold stream per exchanger

Pinch Technology HEN Design Start design at pinch Matching streams AP: (F•Cp)hot ≤ (F•Cp)cold BP: (F•Cp)cold ≤ (F•Cp)hot Maximize exchanger loads Q = F•Cp•ΔT (for each stream) H1 C1 C2 1 5 4 HU CU 170°C 200°C 10 kW/°C 11 kW/°C 9 kW/°C 200˚C 30˚C 25˚C 2 3 45 kW 1870 kW 55 kW 1300 kW 230 kW 109.1˚C 76.7˚C 128˚C 35.5˚C 40˚C

Pinch Technology HEN Design Add E6 to reduce utilities Use loops and paths to make design more flexible Give E6 a duty of X A web of exchangers is affected H1 C1 C2 1 5 4 HU CU 170°C 200°C 10 kW/°C 11 kW/°C 9kW/°C 200˚C 30˚C 25˚C 2 3 45 kW 1870 - X kW 55 kW 1300 - X kW 230 + X kW 109.1˚C 76.7˚C 128˚C 35.5˚C 40˚C 6 Loops give the process a flexibility can be used to make old exchangers fit new duties A path gives flexibility also and is a connection through streams and exchangers between two utilities Loops and paths allow us to shift heat loads in a network X kW

Pinch Technology Individual Heat Exchanger Area Evaluate the specific exchanger areas by accounting for temperature cross within the exchangers Need these areas to calculate the capital cost Q = heat load on the exchanger U = overall heat transfer coefficient (based on the two matched streams) ΔTLM = log mean temperature difference of the exchanger

Pinch Technology Cost comparisons No longer assume equal areas for each exchanger CC (Capital Investment Cost) Based on area change for each exchanger in the network Fixed and variable costs Includes area addition, reduction, and new exchanger cost Operating Costs (OC) ∆TAC (Total Annualized Cost) ROI (Return on Investment)

Pinch Technology How can we improve it? Allowing relocation of all exchangers May be able to cut down on area change expenses May decrease the number of new exchangers needed Incorporate Pro-II simulation

Pinch Technology Improvement Incorporate Pro-II Optimization Pro-II simulation based on Pinch Technology results Exchanger location Minimize total cost Vary heat exchanger area Vary stream split ratio Fix stream target temperatures

Pro-II Optimization Controllers set stream target temps Calculator assigns cost equations Optimizer minimizes cost function

HEN Retrofit Results Crude Distillation Unit Retrofit Considerations MILP Process Pinch Process Pinch Improvements Pro-II Simulation Retrofit Considerations Stream splitting Addition of new exchangers Allow & disallow exchanger relocation

Crude Distillation Unit Original Network 10 Hot streams 3 Cold streams 18 exchangers 2 hot utilities 3 cold utilities

Original MILP Process Pinch No Relocation Allowed Original MILP Process Pinch COMPARISON Original 18 exchangers MILP 8 new exchangers Process Pinch 9 new exchangers E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1

Retrofit Results MILP has 1 less exchanger MILP has more area but requires less energy Pinch has less area but requires more energy Pro-II simulation further optimizes the pinch technology 36

Original MILP Process Pinch Allow Relocation Original MILP Process Pinch COMPARISON Original 18 exchangers MILP 5 new exchangers 5 relocated Process Pinch 9 new exchangers 7 relocated E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1 37

Retrofit Results E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1 38

Discussion Computation Time Comparison MILP is most time-efficient MILP only requires input of data Pro-II requires large majority of manual labor Pinch requires manual labor only

Where Does Pinch Go Bad? We believe the problem is with ΔTmin The optimum value is determined prior to design Assumes equal area of every exchanger Optimization occurs after the value is chosen

MILP = The Best Why? Considers the greatest number of variables Considers all solutions No limiting assumptions or methodology Optimization based on several cost parameters Computer does everything a person can do Only requires input of data Do not need experience with the methodology

The End

Process Pinch Limitations Why does pinch overlook MILP solutions? Optimum solution based on min number of units It then optimizes the area distribution and utilities For large networks, there are many (if not infinite) combinations of exchangers and heat loads to satisfy a process Cannot efficiently consider all heat loops and paths

Example 1 Original Network 7 exchangers 1 heater (E7) 2 coolers (E5,E6) Stream F kg/s Cp kJ/kg.C Tin oC Tout H kW/m2.oC H1 228.5 1 159 77 0.4 H2 20.4 267 88 0.3 H3 53.8 343 90 0.25 HU (hot utility) 500 499 0.53 C1 93.3 26 127 0.15 C2 196.1 118 265 0.5 CU (cold utility) 20 40 H1 H2 H3 C1 C2 3 5 1 4 2 6 7 HU CU 159 0 127 0 228.5 20.4 53.8 93.3 196.1 267˚ 343˚ 265˚ 77˚ 88˚ 90˚ 26˚ 118˚

Example 1- Process Pinch Retrofitted Network (No relocation Allowed) 8 exchangers (E6 becomes non-operational) 1 heater (E7), 1 cooler (E5) E8 and E9 added to increase process exchange H1 H2 H3 C1 C2 159 0 127 0 267˚ 343˚ 265˚ 77˚ 88˚ 90˚ 26˚ 118˚ New -A +A NEW SPL 1 4 2 3 8 9 5 HU 7 CU 6 E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1

Example 1 – Process Pinch Retrofitted Network (Relocation Allowed) 8 exchangers (E6 is relocated a process exchanger) 1 heater (E7), 1 cooler (E5) E8 added to meet increase process exchange H1 H2 H3 C1 C2 159 0 127 0 267˚ 343˚ 265˚ 77˚ 88˚ 90˚ 26˚ 118˚ New -A +A NEW SPL 1 2 3 8 6 4 5 HU 7 CU +A E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1 46

Example 1- MILP Retrofitted Network (No relocation Allowed) 9 exchangers 1 heater (E7), 2 coolers (E5, E6) E8,E9 added to increase process exchange 77˚ H1 H2 H3 C1 C2 88˚ 90˚ 26˚ 118˚ 267˚ 343˚ 265˚ 159˚ 127˚ New +A , NS NEW SPL -A 3 4 9 1 2 +A, NS 5 6 HU CU 7 8 E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1

Example 1- MILP Retrofitted Network (Relocation Allowed) 9 exchangers 1 heater (E7), 2 coolers (E5, E6) E8,E9 added to increase process exchange 77˚ I1 I2 I3 J1 J2 88˚ 90˚ 26˚ 118˚ 267˚ 343˚ 265˚ 159˚ 127˚ 5 New +A +A, NS NEW SPL 3 1 2 10 HU CU -A 7 6 9 8 4 E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1

EXAMPLE 1 RESULTS BEYOND THIS POINT

Example 1 Results (No relocation) MILP has 1 more exchanger than pinch MILP has more area but requires less energy Pinch has less area but requires more energy Pro-II simulation further optimizes the pinch technology E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1 50

Example 1 Results (Relocation allowed) MILP has 2 more exchangers than pinch MILP has more area but requires less energy Pinch has less area but requires more energy Pro-II simulation further optimizes the pinch technology E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1 51

Example 1 Results (No Relocation) E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1 52

Example 1 Results (Relocation Allowed) E9 satisfies the heat requirement for hot stream 3 below the pinch temperature and so E6 is not needed as a utility exchanger a split is needed on cold stream 1 53