Engineered for flexibility and performance.  Branch Joint Selection 室外机 纯粹由分支接头的连接 控制器 分支接头 室外机 Outdoor unit Branch joint Connection by the branch joint.

Slides:



Advertisements
Similar presentations
Using Heat Chapter 16.3.
Advertisements

Page 1 MDS Installation. Page 2 Contents  Introduction  Outdoor Unit Installation  Indoor Unit Installation  Refrigerant Pipe Work  Gas Charge 
IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1.
Piping Drawings Chapter 21. Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Copyright ⓒ 2008 All rights reserved LG Electronics Inc. Daikin VRV III vs LG MULTI V Plus II.
Unit 4 Extension Lines And Dimension Lines
Methods of Analysis ENTC 210: Circuit Analysis I Rohit Singhal Lecturer Texas A&M University.
CHAPTER 24 PIPING DRAWING Instructor: M.Yaqub. Chapter 24 piping week# Steel and Wrought Iron Pipe Common use for water, steam, gas and oil. Up.
Installation. Indoor Unit Installation Typical Installation.
Feasibility Analysis h T1 T2 T3 T4 T5 One Dimensional Transient Analysis One Dimensional Finite Difference Steady State Analysis T1 and T5 will be known.
The new Super Multi from TCUK
Hydraulic Engineering
VRV III Product Selection Piping selection
Design For Manufacturability Darren Wurmnest, Justin Yang, Lewis Lai. Design For Manufacturability Darren Wurmnest, Justin Yang, Lewis Lai. Design for.
RESIDENTIAL AIR HANDLERS
啤酒码垛机. 码垛机流水线 硬件配置图 收缩膜包装产品 收缩膜包装机 硬件配置图 私服系统私服系统 私服系统私服系统 主电机 私服系统私服系统 AO352 CP476DI439DM465 4PP CAN RS232 调制解调 器 IF311.
Basic Electric Circuits. A series connection has a single path from the battery, through each circuit element in turn, then back to the battery. Resistors.
Lecture 17 Problems & Solution(1). [1] What is the magnitude of the current flowing in the circuit shown in Fig. 2? [2] A copper wire has resistance 5.
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
Relaxation Studies at UIUC Jacob Yoder February 7 th, 2008.
Date: File:PRO1_01C.1 SIMATIC S7 Siemens AG All rights reserved. Information and Training Center Knowledge for Automation SIMATIC S7 系统家族.
Electrical Circuits. Getting the Idea Whenever you turn on a lamp or watch TV, you are using electrical energy. This energy is in the form of a flow of.
System Appliances Division Training Manual MODERATO-P/J -. AQ09MSB -. AQ12MSB -. AQ18MSB -. AQ24MSB.
Electrical Circuits.
Thermal Physics III Cooling Processes Refrigerators, air conditioners, and heat pumps are devices that make heat flow from cold to hot. This is called.
1 HVACR316 - Piping Copper Tubing and Fittings. 2 Tubing & Fittings No matter what piping material is used in the installation of an air conditioning.
1 HVACR316 - Piping Copper Tubing and Fittings. 2 2 Safety Refrigerant cylinders should be stored and transported in the upright position to keep the.
Paul Barclay SCT COOLING PRR DESIGN PERAMETERS a)ACTIVE LENGTH TO MATCH Q.M.U.L PROTOTYPE b)GENERAL LAYOUT OF HEAT EXCHANGERS.
Heat Transfer Analysis of a Radiator Heat Transfer MEEN 3210 Dr. Li.
Page 1 MCQUAY DIGITAL SCROLL SYSTEM Unit & Piping Selection.
Static, Currents, Circuits
电动机的继电接触控制. 注意事项 先断电,后接线(改接,拆线) 通电时,切勿触摸各电器元件导电部分 和电机转动部分 合理安排组件箱位置 接线要求:牢靠安全,整齐清晰.
Abdulqader ALabbad October  It Is one of the main mechanical parts of A/C cycle.
Page 1 AMDS Selection. Page 2 Contents Introduction Selection Consideration Selection Process Software Demonstration.
Water Management Water is an important natural resource that requires proper management. Appropriate flow rate, pressure, and water quality are necessary.
Page 1 MCQUAY DIGITAL SCROLL SYSTEM Installation.
-1- Engineering Design for MICE/MuCool Coupling Magnet Cryostat Review at SINAP/Shanghai Caoyun, Wangli, Sunsen Shanghai Institute.
Moment of Inertia Comparisons Test CaseParameterUnitsTechnionGeorgia Tech% Error 4K Case Ixxkg.m Iyykg.m
Scales and lines used in drawings. 1 Scales Scales use ratios that permit measurements on a drawing or model to relate to the real dimensions of the actual.
单元四 电动后视镜控制电路. 汽车辅助装置汽车辅助装置 一、教学目的要求: 掌握电动后视镜的组成、功用、工作过程以 及控制电路 二、主要教学内容: ( 1 )电动后视镜的组成 ( 2 )电动后视镜控制电路 ( 3 )电动后视镜工作过程 三、教学重点、难点: 电动后视镜工作过程.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
Electric Circuits Ch 18: Equivalent Voltage, Potential, Current, Resistance, & Power.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Plumbing Unit. Purpose: Transporting liquids safely from one point to another for storage, processing, and direct use Carries fresh water from a source.
C H A P T E R T W E N T Y- O N E PIPING DRAWINGS.
Air conditioning is a combination of activities such as conditioning the air i.e., heating or cooling, ensuring air.
Danfoss C.H. 3.8 Designing and calculation software
Thermal Analysis of Outer Tracker Modules and Rod Susanne Kyre UCSB 2/8/20101Susanne Kyre UCSB.
Diesel Technology Fittings/ Hoses.
PIPING DRAWINGS C H A P T E R T W E N T Y- O N E.
PIPING DRAWINGS C H A P T E R T W E N T Y- O N E.
Chemical Engineering Drawing
Teknologi Dan Rekayasa
Training for DVM air-conditioner
. Level 3 Air Conditioning Inspections for Buildings
Electrical Insulation
Plumbing Unit.
Ohm’s Law.
Summary of the checking items of the Module-C design
MDS Selection.
Chemical Engineering Explained
TECHNICAL TRAINING 2007.
ELECTRICITY & ELECTRICAL CHARGES
Overview: Room ASM - AC/S 1.x.1
S1 Orthographic Sketching
Single Detector Design
How to Use the Passive Treatment Sock
Series and Parallel Circuits
Chapter 28 Problems 2,6,8,9,15,20,21,36,40.
Presentation transcript:

Engineered for flexibility and performance.  Branch Joint Selection 室外机 纯粹由分支接头的连接 控制器 分支接头 室外机 Outdoor unit Branch joint Connection by the branch joint completely Controller Connection type of branch joint/ branch header:

Engineered for flexibility and performance. 

After the branch header no more branching is permitted

Engineered for flexibility and performance.  Selection of branch joint / header for MDS Model Branch joint (2 branch) MDS-Y1 MDS-Y2 MDS-Y3 MDS-Y4 MDS-Y5 Branch header (4 branch) MDS-C1 MDS-C2 MDS-C3

Engineered for flexibility and performance.  MDS-Y1~Y4 dimensional drawing

Engineered for flexibility and performance.  MDS-Y5 dimensional drawing

Engineered for flexibility and performance.  MDS-C1 dimensional drawing

Engineered for flexibility and performance.  MDS-C2~C3 dimensional drawing

Engineered for flexibility and performance.  Diameter & thickness requirement for refrigerant copper pipe A-series

Engineered for flexibility and performance.  B-series Diameter & thickness requirement for refrigerant copper pipe

Engineered for flexibility and performance.  Piping selection & unit selection Cooling cap. factor

Engineered for flexibility and performance.  Piping selection & unit selection Heating cap. factor

Engineered for flexibility and performance.  MDS100AR A MCC020 MCK020 MCC015MCK020MCC010 BC DE MCK Selection of diameter for piping 2. Selection of branch Selection step : Example

Engineered for flexibility and performance.  1) Main pipe & terminal pipe dia. (Equivalent length<90m) Main pipe : φ15.88 / φ28.6 Terminal pipe : (Same as indoor units ) 2) Calculate the downsteam cap. Of point A A-B-C: A-D-E: 17.4 KW 11.8 KW 3) Select the dia. from the table A-B Dia : A-D Dia : Φ12.7 / φ25.4 Φ9.52 / φ ) Same as item 3 B-C Dia: D-E Dia: Φ9.52 / φ19.05 Φ9.52 / φ Piping dia selection 2. Branch selection Selection step :

Engineered for flexibility and performance.  1) Select the branch of point A A ( Liquid ): MDS-Y2 A ( Gas ): MDS-Y1 2) Same as item 1 B ( Liquid ): MDS-Y2 B ( Gas ): MDS-Y1 C ( Liquid ): MDS-Y2 C ( Gas ): MDS-Y4 D ( Liquid ): MDS-Y2 D ( Gas ): MDS-Y4 E ( Liquid ): MDS-Y2 E ( Gas ): MDS-Y2 1. Selection of diameter for piping 2. Selection of branch Selection step :

Engineered for flexibility and performance.  Additional Charge of Refrigerant G=∑ L i * G i LiLi Formula: The each section of liquid tube length in all ( m ) GiGi Charge amount per length ( g/m ) Using liquid tube length to calculate required refrigerant → Add in refrigerant G Refrigerant charge amount

Engineered for flexibility and performance.  MDS100AR A MCC020MCK020 MCC015MCK020MCC010 BC DE MCK020 60m(5/8) 6m(1/2)8m8m8m8m 8m8m 8m8m8m8m 7m(1/4) 7m7m 8m8m Complete selection of pipe & branch Additional Charge of Refrigerant

Engineered for flexibility and performance.  Additional Charge of Refrigerant G=180*60+120*6+80*55+50*14 Additional charge amount G : =6900 ( g )

Engineered for flexibility and performance.  MDS unit selection software McQuay MDS unit selection software

Engineered for flexibility and performance.  MDS control & monitoring software