ILD Resource Survey 2014/9/9 Y. Sugimoto 1. Committee under MEXT ILC Task Force in MEXT Academic experts committee Particle-Nuclear physics WG Members.

Slides:



Advertisements
Similar presentations
Computer English For Computer Major Master Candidates
Advertisements

CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
LCC Physics and Detector - Status and Way Forward - Hitoshi Yamamoto SiD Meeting, Tokyo September 3,
Report from the ILD Meeting Ties Behnke ILC project meeting
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Manpower and space requirements for ILD 2015/1/13 Y. meeting at SLAC 1.
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Current Status of ILC Project Keisuke Fujii, KEK May 9, 2015.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
ILD meeting Welcome/Introduction 2015/4/23 Y. 1.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
REVIEW OF NA61 SOFTWRE UPGRADE PROPOSAL. Mandate The NA61 experiment is contemplating to rewrite its fortran software in modern technology and are requesting.
Tracking Integration Challenges Y. meeting 2013/9/25.
LCB/ICFA meeting at Newport News with full snow, February This is only for TB meeting Presentation and not for Distribution. ( )
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
LCC Physics&Detector Report Hitoshi Yamamoto SiD Meeting Jan,
ALCW st IOC November 21, 2015: 23:00-24:00 (JST) Agenda 1.Report on preparation done for ALCW2015 up to now by KEK and LOC 2.Discussion and decision.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Computing for ILC experiments Akiya Miyamoto KEK 14 May 2014 AWLC14 Any comments are welcomed.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EDMS for CFS Discussion: How to best use EDMS for CFS in ILC preparation? Lars Hagge, Benno List Deutsches Elektronen-Synchrotron DESY LCWS13, Tokyo,
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
The European Strategy Group (ESG) The remit of the ESG is to establish a proposal for an Update of the medium and long- term European Strategy for Particle.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
THE ATTRACT INITIATIVE Marzio Nessi, Markus Nordberg CERN.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria July 24, 2014RECFA DESY1.
ILD requirement for assembly space and time 2015/11/3 Yasuhiro 1.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 3-4, 2004 Dubna, Russia.
CLIC08 workshop Cost requirements for CLIC H. Braun, G. Riddone
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Budget Outlook Glen Crawford P5 Meeting Sep
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
Hitoshi Yamamoto, 2-Oct Detector Tohoku Forum for Creativity - a Pilot Program - ‘Particle Physics and Cosmology after the Discovery of the Higgs.
The Situation in Japan Yasuhiro Okada, Executive Director, KEK ILD meeting 2014 September 7, 2014, Oshu-city, Iwate, Japan 1.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
State Board of Education Achievement and Graduation Requirements Committee January 11, 2016.
DETECTOR RESEARCH AND DEVELOPMENT Fred Borcherding 1.
Statistical process model Workshop in Ukraine October 2015 Karin Blix Quality coordinator
ILC Physics and Detector - Status and Goals for LCWS14 – Hitoshi Yamamoto LCWS14, Belgrade October 6,
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Updating the Regulation for the JINR Programme Advisory Committees
ILC Status in Japan ECFALC M.Yamauchi KEK June 02, 2016
Introduction to the Workshop
Annual ILC detector meeting K. Kawagoe (Kyushu)
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
The DBD: Outline and Scope
ILD Ichinoseki Meeting
Snowmass on the Mississippi
Yasuhiro Okada, Executive Director, KEK
Presentation transcript:

ILD Resource Survey 2014/9/9 Y. Sugimoto 1

Committee under MEXT ILC Task Force in MEXT Academic experts committee Particle-Nuclear physics WG Members are physicists from; HEP(6), Nuclear physics, Cosmic-ray, Astronomy, Accelerator(2), Particle theory, Nuclear theory, Cosmology, Science communication TDR validation WG Members are accelerator physicists from; KEK(3), JAERI, Riken(2), NIRS, HiSOR, JASRI/Spring8, CROSS-Tokai u/shingi/chousa/shinkou/038/i ndex.htm We need information from detector groups 2

TDR validation WG Discussion points (example) – from MEXT web page –Cost Items to calculate the total cost (including items which are not included in the official documents) Validity of the cost which is published Cost increasing factors Possibility of cost reduction (alternatives) –Human resource Estimation of human resource during construction and operation (amount, level and field of expertise) Cost of human resource (except for what is included in M&S) –Technology What part is achievable with present technology? What part requires further R&D? Feasibility, necessary time, and additional cost of the R&D Possibility of alternative technology 3

Involvement of LCC Accelerator and CFS –Akira Yamamoto consults with LCC members Detector –LCC P&D Associate Director (Hitoshi Yamamoto) set up following working groups Physics WG (Convener: K.Fujii, C.Grojean, M.Peskin) ILC Infrastructure & planning WG (Convener: S.Yamada) –Physics WG prepares materials for Particle- Nuclear Physics WG –ILC Infrastructure & Planning WG prepares materials for TDR validation WG 4

ILC I&P WG Members –Convener: Sakue Yamada –ILD: Karsten Busser, Frank Simon (, Mary-Cruz Fouz) –SiD: Marty Breidenbach, Marcel Stanitzki –Local: Kiyotomo Kawagoe, Yasuhiro Sugimoto Mandate –Study of the human and budgetary resource needs during construction and operation –The time profile of the resources and their reality to quire –The organizational structure to interact with the ILC laboratory (Not relevant to MEXT review) 5

Resource survey in ILD Very premature study has been done and presented at ILD session of AWLC2014 There are several comments –Manpower needed is overestimated –FTE*year might be more appropriate than FTE We need more information from sub-detector groups Human resource needs for operation period also has to be clarified Excel file (and Word file for instruction) has been sent to sub- system contacts to survey manpower needed for construction and operation period Rough estimate of time profile of budget is also asked Newly proposed detector hall scheme (Hybrid-A’) and CMS style detector assembly is assumed for the schedule Detector construction period of 8 years is assumed to cope with possible early start with 250GeV CMS energy 6

Resource survey in ILD Timeline –Time line was drawn based on the schedule in TDR (Figure in Vol.3-II) and recent CFS study –Assembly hall is assumed to be built in 2 years from ground breaking –Duration of “Assembly on site” can be modified by sub- system groups 7

Resource survey in ILD Numbers to be specified by each sub-system group 8

Status of the survey Inputs from sub-detector contacts so far –Si ECAL –AHCAL –SDHCAL –SIT/FTD –VTX –TPC –Yoke Some discussion issues –ETD/SET was forgotten  Who is responsible? –It was suggested “Common engineering” sheet should be added: safety, detector integration and infrastructure, detector hall issues, etc. 9

Status of the survey 10 Total FTE neededFTE on site Annual budget

Some comments FTE for Physics/software is not included yet –It must be quite large, particularly in Y10 Some sub-detector does not have entry in Y10 –Running cost cannot be zero –Detector upgrade cost can be included –Some FTE must be needed for maintenance 11

Prospects MEXT TDR review for detectors would be held quite later than we expected: in Feb (?) –Revise the numbers, if necessary –Detector running cost and budget for detector upgrade should be considered more seriously by then (Please give me the numbers of annual budget and FTE needed in Y10) There will be no report by Sakue at LCWS2014 But the schedule could be changed (actually happened for CFS: Nov.  Sep.8 th ) Sakue suggested to collect information of the budget needed by next TDR validation WG meeting 12

BACK UP SLIDES 13

Particle-Nuclear Physics WG Mandate –Review the issues listed below concerning the contents of scientific studies which ILC aims, and supplement the discussion at the Academic Experts Committee for ILC: Scientific role which ILC plays in the future plan of particle and nuclear physics Other related issues Schedule –This WG will last between May 2014 and March 2016 (can be extended if necessary) –Review meetings will be held ~1/month 1 st meeting was held on June 24 14

Particle-Nuclear Physics WG Discussion points (example) –What programs are suitable to tackle the challenges to be uncovered in particle physics? –From the programs above, what scientific outcome is expected for particle physics in future? What is the importance of the outcome? –Based on the expected results from upgraded LHC, what program can we expect to produce new rich results? –What is the expected outcome of ILC? How do you evaluate its certainty? What impact does the expected outcome give to particle physics? –Does ILC have scientific advantage over other future plans (FCC, CLIC, CEPC, etc.)? –Can you get enough discussion and wide agreement in the community of the related scientists taking other future projects into account? –How much human resources do you expect to gather from abroad? 15

TDR validation WG Mandate –Review the issues listed below concerning the cost and technical performance, and supplement the discussion at the Academic Experts Committee for ILC: Validity of the cost estimation, necessary human resource, and technical feasibility described in the TDR Other related issues Schedule –This WG will last between May 2014 and March 2016 (can be extended if necessary) –Review meetings will be held ~1/month Detector will be discussed in January