Lean Six Sigma Project Presentation Template

Slides:



Advertisements
Similar presentations
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Advertisements

Roberto lopez LSSMBB DMAIC project template.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
Black Belt Level DMAIC Certification Checklist
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Welcome to Lean Six Sigma Green Belt Training
7 th Continual Improvement & Innovation Symposium 2015 CASE STUDY COMPETITION: INNOVATION TEMPLATE [ Name of the Organization ] [ Innovation Title ]
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Practical Assessment Project Template
Copyright © Six Sigma Academy International LLC All Rights Reserved Introduction To Measure.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Designing products, services, and processes that satisfy both client.
7 th Continual Improvement & Innovation Symposium 2015 CASE STUDY COMPETITION: LEAN SIX SIGMA PROJECT TEMPLATE [ Name of the Company ] [ Department / Section.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Confidential, , MBX Template Book Confidential, ,
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
METODOLOGI SIX SIGMA PERTEMUAN 13 CONTROL PHASE
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Practical Assessment Project Template
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
Practical Assessment Project Template – DMADV
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template

The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
LEAN SIX SIGMA PROJECT TEMPLATE
Control Phase Wrap Up and Action Items
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Improving Existing Products & Services
Control Phase Wrap Up and Action Items
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
DMAIC Project Template
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Certification Project Template
Project Title Date Location of Kaizen Author.
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
The 7 Basic Quality Tools ~ The DMAIC Process
Certification Resources Workbook
DMAIC STANDARD WORK TEMPLATE
Measure Phase Wrap Up and Action Items
Practical Assessment Project Template – REV. 5.2
8th Continual Improvement & Innovation Symposium 2016 CASE STUDY COMPETITION: INNOVATION TEMPLATE [ Name of the Organization ] [ Innovation Title ]
Lean-Green belt six sigma program
Practical Assessment Project Template – REV. 5.2
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Lean Six Sigma Project Presentation Template [PROJECT TITLE] [Project Period from mmm-yy to mmm-yy] [Company Name Division / Deptt Team]

Introduction About the company Products, Location Wh

DEFINE

DEFINE Project Charter should contain Project Title: It should include clearly the name of the process to be improved Business Case What is the “Pain” issue? (Problem symptoms) How long it has been there? (Historical trends) Current financial and non-financial impacts of the issue Future impacts if improvement is not made now How is the issue related to strategy?

DEFINE Project Charter should contain (contd..) Goals and objectives SMART Objective for improvement Stage targets (if long-term stage by stage improvement is required) Expected Benefits from the project Involve Finance in quantifying the expected benefits (quantify reduction in Cost of Poor Quality) For stage-by-stage improvement, what are short, medium, long term objectives Team members/Leader, Project Sponsor, Project Timeframe (initial) Project plan in Gantt chart /network diagram form

DEFINE “SIPOC” or “COPIS” Diagram “VOC” CTQs and related Big Ys Correctly identify SIPOC/COPIS (supplier, input, process, output, customer) Make a high level block diagram of the process relating to the issue “VOC” Understand “Voice of Customer” based on available data (customer SLA, specification, feedback) or Generate a VOC data collection plan including MSA. CTQs and related Big Ys Identify the “Critical to Quality” parameters of deliverables to customer . Define Big Y(s) of the process Classify “Y”s as per Kano Model – Hygiene, Higher the better, Delight factors Make CTQ Tree to cascade Big Ys into smaller deliverables (Y1, Y2…) Prepare CTQ Specification Table to clearly define all Ys. Defect Definition – Define what is not acceptable

DEFINE E. Stratification & Prioritization of Ys Collect historical / current data regarding the Ys Stratify data for smaller Ys Analyse historical / collected data e.g. by applying Regression Analysis to identify significant smaller Ys (e.g. Y = f(Y1, Y2….,Yn), F. Project Scope / Boundary Make Pareto Chart and identify major Ys to focus upon Define Project Scope/Boundary using SIPOC Define the boundary of the project in terms of which Ys will be included in the project and what will be done with the remaining Ys. (e.g. plan another project, consider it in the next “6σ projects wave”) Set Baseline Define baseline performance for all Ys in the project scope based on historical / collected data Work out process capability (Sigma Level) for selected Ys based on historical /collected data. Summarize the “as is” process performance with comments

DEFINE Approval of the Charter Set Targets Obtain benchmark data for selected Y based on VOC / SLA and/or competitive / best-in-class performance benchmarks Define SMART targets for selected Ys and target process capabilities (Sigma Levels) for them Test the targets statistically to verify if they are significantly different from the current performance level (Hypothesis test) Review and re-define “defects” and their project targets Review and re-define the project timeframe and milestones with due dates Approval of the Charter Document the Project Charter Champion and Sponsor review and approve the Charter Charter is registered with Program Management Office for follow up.

DEFINE – Key Points Define phase is all about Ys, don’t bring in Xs (causal factors) at this stage Don’t propose solutions in “Define” phase. The purpose of data analysis is only to clearly define the project scope and set SMART targets for Ys based on VOC (and other considerations).

MEASURE

MEASURE Data Collection Plan It is preferable to collect current data from the process however in some cases historical data may be utilized (if the reliability of data is well established) Use Prioritisation matrix or FMEA (if existing) to identify critical data to be collected. Prepare Data Collection Plan specifying: Parameter to be measured Whether discrete or continuous Which location Measurement method (procedure/code/standard) Sample Size and Sampling method : How was determined? How will the data be summarized Confirmation of calibration of measuring devices and calibration plan if necessary.

MEASURE Measurement System Analysis (MSA) Verify calibration status and accuracy of measuring devices used in the process. Calibration error should be zero. Demonstrate MSA (if applicable): Gauge R&R for continuous variables measurement Statistical Test for attribute Ys

MEASURE Actual Measurement Show sample of raw data in tabulated form Summarise data Give comments on the process performance based on data

MEASURE – Assess Process Capability Process Capability Assessment Carry out Process Capability Analysis and determine Cp, Cpk & Pp, Ppk Current defect ppm and process Sigma Levels of the process Estimate Process Sigma Level Note: Assessment of Process Capability and Measurement of Process Sigma level may be carried out in define phase, in case reliable historical data is available.

ANALYZE

ANALYZE – Process Detailed Process Map in appropriate ways Flowchart or Spaghetti Diagram Function diagram of the process system (TRIZ) Any other Identify (for lean) Value Adding activities, Non-value Adding but necessary activities Wasteful activities Identify constraints / bottlenecks in the flow Make Value Stream Maps As is VSM “Should be” or target VSM

ANALYZE - Data Use PFMEA or Cause and Effect diagram to identify all “Potential” causes Prepare a Cause Validation Table, and apply the appropriate validation methods: Classify each potential cause into “Strong”, “Weak” and “Insignificant/Irrelevant” Categories List the “possible” causes separately for further validation. Prepare validation plan for the possible causes.

ANALYZE - Data Validate “possible” cause by using appropriate tests/tools as needed: Apply deep analysis to further drill down validated causes to reach “root causes” Conclude Analysis by clearly identifying validated possible causes and their Root causes. If DOE / Regression is carried out, predict optimum settings and validate them.

IMPROVE

IMPROVE- Based on the identified and validate root causes, generate possible solutions. Use creative / innovative thinking to explore solutions Try to incorporate mistake proofing measures. Prioritize solutions using appropriate methods/criteria

IMPROVE E. Plan for implementation Trial runs / pilot implementation Trial / pilot implementation plan Risk analysis of the pilot / trial plan Plan for MSA and data collection Method to evidence improvement Finalize full scale implementation plan, with phases as appropriate Carry out thorough risk analysis of the agreed solution for full scale implementation Define stage gates including handing over the process to the process owner.

CONTROL

CONTROL Document / amend Procedures, standards, work instructions incorporating the improvements in the process Define control plan for Xs Install appropriate control charts (SPC) for Ys and critical Xs. Document “Out of Control Guidelines” for the operators

CONTROL Evaluate Process Sigma Level and compare with pre-improvement Sigma level Update Process FMEA and recalculate RPNs, which should go down. Carry out cost-benefit analysis, include non-financial benefits Identify opportunities for further improvement In the same process and Horizontal deployment opportunities (other similar processes) Give details of Reward and Recognition within the company. Share knowledge by publishing / presenting the case study

Lessons Learnt Identify what lessons were learnt regarding problem solving method, project management, teamwork etc